Loading...
HomeMy WebLinkAboutNPDES records inspectionWetland Inspection Report Project Num: 20191658 Version: 3 Project Name: TPB NCDOT - Replace Bridge 8 on NC 194 County: Ashe (BR-0002) Location: TPB NCDOT - Replace Bridge 8 on NC 194 (BR-0002) Latitude: +360 27' 59" SW Plan Location: Site Owner Name: NC DOT Division 11 Inspection Date: 8/16/2023 Reason for Inspection: Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Title: Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: Operation and Maintenance Inspection Summary: Status: Issued Project Type: Replace bridge with bridge Region: Winston-Salem Longitude: -81 ° 30' 40" Phone: Phone: 336-776-9703 page 1 Site Number: 20191658 Owner: Wood, Jamie Inspection Date: 8/16/2023 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑ Comment: I reviewed seven weeks of NPDES records. All were completed and sinned. Weeklv inspections of SDOs was noted including precipitation monitoring. A rain gage is on site. A turbidity curtain was in river and was used during demo. I recommended an entry in the records for turbidity curtain as there were none. SDOs were adequately maintained. A silt bagis s being used to pump groundwater into as it accumulates along support wall under construction. page 2