HomeMy WebLinkAboutNPDES records inspectionWetland Inspection Report
Project Num: 20191658 Version: 3
Project Name: TPB NCDOT - Replace Bridge 8 on NC 194
County: Ashe (BR-0002)
Location: TPB NCDOT - Replace Bridge 8 on NC 194 (BR-0002)
Latitude: +360 27' 59"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 8/16/2023
Reason for Inspection: Routine
Inspection Type: Records/File Review (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Title:
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: NPDES SW - Roadway (DOT)
Question Areas:
Operation and Maintenance
Inspection Summary:
Status: Issued
Project Type: Replace bridge with bridge
Region: Winston-Salem
Longitude: -81 ° 30' 40"
Phone:
Phone: 336-776-9703
page 1
Site Number: 20191658 Owner: Wood, Jamie
Inspection Date: 8/16/2023 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑
Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑
Comment: I reviewed seven weeks of NPDES records. All were completed and sinned. Weeklv inspections of
SDOs was noted including precipitation monitoring. A rain gage is on site. A turbidity curtain was in
river and was used during demo. I recommended an entry in the records for turbidity curtain as there
were none. SDOs were adequately maintained. A silt bagis s being used to pump groundwater into as it
accumulates along support wall under construction.
page 2