Loading...
HomeMy WebLinkAboutWQ0002284_More Information (Received)_200203263 7 March 15, 2002 41 Mr. Nathaniel D. Thornburg,.;~ Environmental Engineer Non -Discharge Permitting Unit NCDENR-Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Mpplication Ncr:Y QWQ2_ 4 Aud iorialIpf6rg i6n:Request_ Kinnakeet Wastewater Treatment Plant Modifications and Reuse Irrigation System Dare County Dear Mr. Thornburg: Ate: ef 1 Gw�l elt' Via Overnight Delivery RECEIVED WATER QUALITY SECTION! MAR 21 2002 NQ,1,,MS,Q1+AR.Q5 PER,MJTTINJG We have reviewed the Additional Information Request for the referenced project, and are submitting the requested information herewith to enable you to complete your review for issuance of a permit for this project. The responses outlined below correspond to the numbering in the additional information request letter: General: 1. Sets of updated specifications are included, signed, sealed and dated as required. The specifications include modifications as discussed in future paragraphs in this letter. 2. A reuse water education package is included in conformance with 15A NCAC 2H .0219 (k) (1) (C) (i) (I>). 3. The subdivision receives potable water from Dare County's Hatteras Island water distribution system. The wells furnishing this system are located off site at Buxton, North Carolina. 4. Language is proposed stating that reuse water will be used to irrigate the front yards of the lots within the subdivision. Homeowners do not have the option of having reuse water sprayed in their yards, as the utility company has specifically reserved an easement for that purpose across all of the lots proposed for irrigation (see attached subdivision plat, typical). In addition, each homeowner will be furnished a copy of the education literature discussed in item 2 above. 5. We acknowledge that DWQ will contact us in the future regarding I5A NCAC 2H .0227. 4417 N. Croatan Hwy. ■ P.O. Box 1068 ■ Kitty Hawk NC 27949 252-261-3266 ■ Fax: 252-261-1760 ■ E-mail: bpg@bisseliprofessionalgroup.com Page 2 Mr. Nathaniel D.Thornburg March 15, 2002 Plans: Restrictive fencing is included on the plans as requested. 2. The lake to the south of the proposed infiltration pond is an existing lake, which serves as an aesthetic feature for the subdivision as_ well as a groundwater control device (ie, a "line sink'. The pond meets the separation requirements of 15A NCAC 2H. 3. Details"of cleanouts and air release valves to be used -in the proposed reuse irrigation system are provided on the updated plans. 4. Plans include details of the irrigation sprinkler heads, 'appurtenances, as well as a tabulation of all of the components to be installed under this project. Please refer to sheet RRC1. Specifications: 1. Specification section 11400 has been modified to remove the comminutor. 2. Section 11400 has been modified for the central clarifier. 3. Section 11900 has been modified to include both audio and visual alarms for the pump stations. Wastewater Treatment Facility: 1. A hydraulic grade line has been shown for the entire wastewater treatment system Additional plan clarifications have been >nvqI-e it eerier to 2. Piping has been modified so that the two clarifiers operate in parallel, not in series. The specification narrative has been amended accordingly. 3. Additional details are provided regarding the piping between the various components of this system, in particular clarifying aeration basin 3 and the 2°d clarifier, so that the 2°d clarifier is utilized for both initial, low flow conditions, and for future, dual path conditions at design flow. A schematic flow diagram also included. 4. A 5- ay side eam detention pond�(Uned�nd) is be'iT.1+0�„�+,.,A A,c, nuriumally envisioned when the hydrogeological report was completed. A letter from Edwin Andrews, project h dro eolo ists is included which acknowledges that t e y rogeo ogica report applies to the r_ey vement over jje iral lan- The five day pond includes a provision for water to be returned to the head of the treatment works and retreated. 5. Specifications have been provided for the synthetic liner, having a hydraulic conductivity of less than 1 x 10-6 cm/s. Page 3 Mr. Nathaniel D. Thomburg March 15, 2002 6. Calculations are included verifying that sludge holding has at least 30 days of storage. 7. The Division of Water Quality has determined that the traveling bridge filter as proposed meets the intent of the dualization criteria 8. Manufacturers information and specifications are included for the backwash system pumps, as well as groundwater control and 5-day pond return pumps. 9. While not responding to a specific comment, please note that the package treatment plant includes an anoxic zone for denitrification in order two all, evi�at_e any concern with groundwater Reuse Irrigation Sim: 1. The sprinkler system array has been refined so that the spray pattern avoids_ direct application to roads. The am which does not co ec,�tc2„ _ _ ce wal of the state (e.g., those capable of ho ing in the 25 year storm) is permissible under e regu ions. a ave irrigated self contained ponds in the past, which has been acceptable to DWQ. 2. The irrigation drawings have additional information which now clearly shows the various water classifications within the Kinnakeet Shores Subdivision. The plans indicate those waters with an SA classification which are subject to the 100' buffer, isolated wetlands subject to a 25' buffer and isolated ponds that are not subject to buffering. The actual irrigation setback lines are shown, with all irrigation occurring outside those setbacks. 3. The reuse irrigation system is zoned in such a manner that each soil series will receive the appropriate dosage. Details have been provided as to how the various zones will be dosed and at what frequency in order to avoid overdosing, based on the soil scientist's report. 4. The actual application rate will not exceed 3.1" per week under the dosing plan described in Paragraph 3 above. Specific details of this dosing plan are included. 5. The dredge spoil that was formerly located east of the rotary distributors was removed by NCDOT and utilized for dune reconstruction on Hatteras Island. 6. The addition of denitrification in the treatment facility has eliminated the nitrate concern, as nitrates will be removed to a level which is below the groundwater standard of 10 mg/l. Based on denitrification, the hydrogeologist has concurred with the current application rate, as indicated in the attached letter from Ed Andrews. 7. The reuse piping, sprinkler heads and related appurtenances to be installed in the reuse project have been tabulated on sheet RRC 1. 8. All pump calculations for the irrigation pond pump system are included. The dosing system calls for the simultaneous dosing of up to 6 zones, and the pipes have been sized accordingly. . . • Page 4 Mr. Nathaniel D. Thornburg March 15, 2002 9. Sheet RRD 1 contains two different pumps systems. The first is a reuse irrigation pump station, and the second is a groundwater control pump station. Clarification has been provided. 10. The number of spray nozzles, model and diameter have been tabulated as requested, on sheet RRC I. 11. Calculations are included as to how the wetted spray area was determined. (An exhibit is also included showing these wetted spray areas.) 12. All product information is included for the proposed irrigation'pumps. 13. An operation and maintenance plan has been included for the irrigation system 14. All reclaimed water piping, valves and appurtenances will be color coded with purple pantone no. 522, as required in the referenced regulation. The required information is included in the specifications for the reuse irrigation system, as well as shown on the construction drawings, in the public education package and in the O&M plan. Groundwater: 1. A verbal comment was received requesting additional clarification for the Groundwater Section on the boundary of the wastewater disposal site with respect to the proposed construction. This information is being furnished under separate cover. We believe this information appropriately addresses all of the comments received on this project to date. Five copies of amended plans, specifications and supporting documentation are included herewith for your review. Please let me know if you need any additional information in order to complete the review. Sincerely yours, Bissell Professional Group 4MS. )issell Principal MB/lvk Encl. cc: Ray E. Hollowell, Jr.