Loading...
HomeMy WebLinkAboutWQ0002284_More Information (Received)_200203151 fl A 1523 Kinnakeet Shores 350,000 gpd Wastewater Treatment Plant Parameters r 3/13/2002 Elevation of Plant: 11.0 ft. msl. Weather Data: Ambient Temperature: high.: 100 OF low: 30 OF Maximum Relative Humidity: 98% Influent Parameters: Average Daily Hydraulic Flow (ADF): 350,000 gpd 243.1 gpm Run -Off Period: 18 hrs Influent Peak Factor (PF): 3 Peak Hydraulic Flow (PFxADF): 729.2 gpm BOD5 240 mg/l Total Suspended Solids: 240 mg/1 NH3-N: 25 mg/1 NO2-N/NO3-N: na mg/1 TKN: 40 mg/1 Phosphorus: 8 mg/1 Alkalinity (as CaCO3) 0 mg/1 pH: 6-9 Operating Parameters: Plant Class: Class I MLSS concentration in aeration: 5,000 mg/1 Volatile fraction of MLSS: 0.70 MLVSS concentration in aeration: 3,500 mg/l Mean cell residence time (MCRT): 30 days Minimum DO concentration in aeration: 2 mg/l Plant Water Temperature: maximum: 86 OF minimum: 70 OF Effluent Parameters: BOD5 5 mg/l Total Suspended Solids: 5 mg/1 NH3-N: 0 mg/l NO,-N/NO3-N: 8 mg/1 TKN: 0 mg/1 Phosphorus: n/a mg/l Alkalinity (as CaCO3) n/a mg/l Dissolved Oxygen: n/a mg/l pH: 6-9 mg/1 1523 Kinnakeet Shores 350,000 gpd Wastewater Treatment Plant Summary r 3/15/2002 J 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l Process: Flow Equalization Basin Volume: Aeration Basin Volume: Denitrification Basin Volume: Secondary Clarifier Volume: Area: Aerated Sludge Holding Volume: Travelling Bridge Filter (influent flow): Cell ftz , based on 2 gpm ftz: # of cells Loading rate: Required: 87,500 gallons 350,000 gallons 45,714 gallons 56,000 gallons 788.1 ftz 61,300 gallons 243 gpm 122 gpm/ftz 28 1.25 gpm/ftz Provided: 87,500 gallons 350,740 gallons 47,930 gallons 59,055 gallons 831 ftz 61,650 gallons 243 gpm 122 gpm/ftz 28 1.94 gpm/ftz S r 1523 Kinnakeet Shores 350,000 gpd Wastewater Treatment Plant Aeration Calculations 3/15/2002 1 1 I Recommended Standards for Wastewater Facilities Minimum detention time: Maximum organic loading rate(,): Design organic loading rate: Minimum Air Requirement: Max. organic loading rate*: * Modified Ludzig-Edinger Oxygen Requirement,): 24 hours 15 pound of BOD5/1,000 ft3/day 15.0 pound of BODS/1,000 ft3/day 2,600 ft3/pound of BOD5/day 40 pound of BODS/1,000 ft3/day 4.6 pound O?/pound NH3-N/day Tankage Requirements Average Daily Flow: 0.35 mgd BOD5 reduction in flow equalization: 10`Yo Influent BOD5 to aeration basin: 210 mg/1 Pounds BOD5/day applied to aeration: 630.5 pounds Effluent BOD5 Requirement: 5 mg/l Change in BOD5 (in aeration): 205 mg/1 Design MLSS concentration in aeration: 5,000 mg/l Design Sludge age: 30 days Change in BODVTvILSS ratio: 0.04 Influent NH3-N 25 mg/l Pounds NH3-N/day 73.0 pounds Required Minimum Capacity: 350,000 gallons based on 24-hr. retention time: based on maximum organic loading of 314,409 gallons 15.0 pounds of BOD5/1,000 ft3/day based on change in BOD5/MLSS ratio, MLSS, & Design Sludge Age the required detention time for com NH3-N and BOD5 reduction is: 20 hours with arequired capcity of: 300,000 gallons Minimum required capcity (max from above) 350,000 gallons Aeration detention time: 24 hours Aeration Side water depth: 10.5 ft. Operating Depth over diffusers: 9.5 ft. Air Requirements Air required for BOD5 reduction: 1021.65 cfm Air required for mixing: 1169.8 cfm Total Air Requirement: 1169.8 cfm Pressure Required: 4.11 psi (0.433 psi/ft x water depth over aerators) Kinnakeet Shores Wastewater Treatment Plant Clarifier Calculations 0 I ' 1523 1 1 1 1 0 Recommended Standards for Wastewater Facilities for the Extended Aeration Activated Sludge Process Max. Surface settling rate @ Average Daily Flow (1): 500 gallons/day/ft` @ Peak Daily Flow (1): 1000 gallons/day/ft- Max. solids settling rate @ Average Daily Flow (1): 50 gallons/day/ft` @ Peak Daily Flow (l): 50 gallons/day/ft- Weir Overflow rate @ Average Daily Flow (1): 10000 gallons/day/ft` @ Peak Daily Flow (,): 10000 gallons/day/ft- Sludge Return rate: 1.5 Minimum retention time @ Average daily Flow: 4 Hhours Tankage Requirements Average Daily Flow: 350,000 gpd Clarifier Design Peak factor: 1.00 Peak Flow into secondary clarifier: 350,000 gpd- Number of settling basins provided: 2 Note: areas are based on srface settling rates include influent plant flow only Total area required by maximum surface settling rate: @ Average Daily Flow 700.0 ft2 @ Peak Daily Flow 350.0 ft2 Design MI -SS concentration in aeration: 5,000 mg/l Flow rate into clarifier including 150% of average daily flow sludge return: @ Average Daily Flow 875,000 gpd @ Peak Daily Flow 875,000 gpd Solids Loading: @ Average Daily Flow 36,720.6 pounds/day @ Peak Daily Flow 36,720.6 pounds/day Total area required by maximum solids loading rate: @ Average Daily Flow 734.4 ft2 @ Peak Daily Flow 734.4 ft2 Minimum required total area: 734.4 ft2 Minimum required area per basin: Surface Loading rate: Minimum required total volume:: Minimum required volume per basin: Detention Time: Minimum required weir lengths: @ Average Daily Flow @ Peak Daily Flow Minimum required weir length per basin: Actual weir length provided per basin: Total Actual weir length provided Air Requirements Number of basins provided: Air Flow required per skimmer: Air flow per sludge lift: Total Air required for Clarifiers: Pressure Required: (0.433 psi/ft x water depth over aerators) 367.2 ft2 476.6 gpd/ft2 57,681 gallons 28,840 gallons 4.0 hrs. 35.0 ft. 35.0 ft. 17.5 ft. 18.0 ft. 36.0 ft. Total 3/152002 ' J 2 5.0 cfm 10 cfm 10.0 cfm 20 cfm 30.0 cfm @ 9.5 ft. of lift 4.11 psi I 3 U S m � DRAWN BY: DMR PROJECT SHT. NO. 3802 KINNAKEET SHORES PROPOSED 350.000 GPD WWTP SELL `-P`°""�° °'°°° mi. _D^'E_ DWC. No.: 152300WW1 FLOW DIAGRAM SCHEMATIC SCALE: NONE .