Loading...
HomeMy WebLinkAbout20211425 Ver 1_Credit Release Request Form - Task 1 Twin Burros_20230818WILDLANDS ENGINEERING 8/18/2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth, khogarth2wildlandseng.com, 540-907-9432 Through: Wildlands Holdings VI, LLC We formally request a credit release for the Twin Burros Mitigation Site (DWR ID# 2021-1425vl) for completion of Tasks 91 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 91 and are either pending review or have already been approved: DWR Approved Buffer and Nutrient Instrument and Plan, IRT Approved Stream Mitigation Plan, Recorded and Assigned Conservation Easement, and Performance Bond. Credits requested for release are detailed below: Credit Type % Release Credit Amount include Units Notes/Comments Buffer Restoration 25 78,227.750 Sq Ft 312,911.001 x 0.25 = 78,227.750 Buffer Preservation 25 1,092.675 Sq Ft 4,370.700 x 0.25 = 1,092.675 Buffer Enhancement 25 91,099.267 Sq Ft 364,397.067 x 0.25 = 91,099.267 Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset Jordan sites only) 25 316.320 lbs 1,265.280 x 0.25 = 316.320 Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset Jordan sites only) 25 14.445 lbs 57.781 x 0.25 = 14.445 Signature: 1�k� Kq - Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by DWR, whether it is the BPDP table or the As Built table), 2) Approved Credit Release Schedule Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the BPDP, WILDLANDS ENGINEERING jot €9 S �LY 1 y� I SC I I I I I p a 3r s a" 0 K r p 0 'M 'm ;,R R i � e 9 �gg cr ` a 3 6 6J45ujz u z;g�� g 8 8 8 8 d s s� aas� I N-M! 5 a111911 il AIA.1111 § \ � (�■m#§k�! � �■n!§ , &�--| � � WILDLANDS ew e,w.rR„ e WILDLANDS ENGINEERING Vlll. CREDIT RELEASE SCHEDULE A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the Riparian Buffer Credits and Nutrient Offset Credits associated with the Twin Burros Bank Parcel will become available for sale to a third party in accordance with the Credit Release Schedule in Table 5.0 below: Table 5.0 - Credit Release Schedule far Riparian Buffer and Nutrient Offset Credits % Credit Available for Task Project Milestone Sale Instrument and Plan Approved by DWR, Draft5tream & Wetland Mitigation Plan Approved by the IRT, Conservation Easement 1 Recorded and Assigned according to Item B (1) of Section X in 25 this Instrument has been completed and approved by DWR* and Financial Assurance Pasted All Riparian Earthwork, Planting and Installation of Monitoring Devices Completed, Easement Boundaries adequately marked, aII 2 applicable permits obtained, stream and wetland mitigation 10 activities completed and a site visit by DWR performed by DWR- Monitoring Financial Assurance Posted and Approval of As -Built 3 Report 10 Monitoring Report #1: Approved by the DWR** & financial 4 assurance renewed 10 Monitoring Report #2: Approved by the DWR" & financial 5 assurance renewed 10 Monitoring Report#3: Approved by the DWR** & financial 6 assurance renewed 10 Monitoring Report #4. Approved by the DWR** & financial 7 assurance renewed 5 Monitoring Report #5: Approved by the DWR** and final site visit 8 by DWR has been conducted 10 Total 100% * For specification, pi Lase see Section V in this Instrument " DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved Plan