Loading...
HomeMy WebLinkAbout20181108 Ver 5_Design/Maps/Site Plans Revised_20230817TRACT "A" 2.454 ACRES BY COORDINATES EXCLUDING RD. R/W N/F TJ'S LAND DEVELOPMENT, LLC D.B. 2067, PG. 710 P.C. D, SLIDE 281 GPIN NO. 7615-09-9675 TRACT "B" 0.369 ACRE BY COORDINATES EXCLUDING RD. R/W N/F TJ'S LAND DEVELOPMENT, LLC D.B. 2086, PG. 609 P.C. D, SLIDE 281 GRAVEL WORK AREA TRACT "C" N/F TXS LAND DEVELOPMENT, LLC D.B. 1920, PG. 001 P.C. I, SLIDE 60-9 TRACT 4 GPIN NO. 7615-09-3775 GRAVEL WORK AREA 0 Z o D B I �. CA 0- Z N O 0 0 o m 1 m O o O = N cD = o 00 0 o0 0° o 0O S 84'59 30" E N 68.39 ,08 E 9.06 20. gg z� TRACT "C" 1.294 ACRES BY COORDINATES EXCLUDING RD. R/W N/F TJ'S LAND DEVELOPMENT, LLC D.B. 2086, PG. 609 P.C. D, SLIDE 281 TOTAL TRACT AREA 4.117 ACRES BY COORDINATES EXCLUDING RD. R/W NORMAL WATER LEVEL (NWL) +0.94' VERIFIED ON 3/20/2022 AND WAS OPUS DERIVED REFERENCED NAVD88. S 68•v C1 �, `� i 38 10 F s33 �S TRAVEL L!FT BAY / x x V REMAINS OF OLD HEADWALL SEE 1988 SURVEY P.C. D, SLIDE 281 m MINOR= 11annnn►► G A ff R 0Z � , o• 'L s SEA c Z� L�1546 ; O lk t yp'' V� 7.+ C • ������►eRm i ►�►►e��s+a I, NORWOOD MARTIN MAYO, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY PERFORMED UNDER MY SUPERVISION DEED DESCRIPTION RECORDED IN DEED BOOK 2067, PAGE 710 AND D.B.2086, PG. 609; BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM INFORMATION FOUND IN PLAT CABINET D, SLIDE 281 AND THAT THE RATIO OF PRECISION AS CALCULATED IS 1:10,000; THAT THE GLOBAL POSITIONING SYSTEM (GPS) OBSERVATIONS WERE PERFORMED TO THE STANDARDS PART 2: STANDARDS FOR GEODETIC NETWORKS AT THE 2CM ACCURACY CLASSIFICATION (95% CONFIDENCE) USING REAL TIME KINEMATICS, OPUS, AND TRADITIONAL REVERSE; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600). THIS 9 DAY OF NOVEMBER, 2021 NORWOOD MARTIN MAYO, PLS REGISTRATION NO.: L-1546 PRELIMINARY PLAT NOT FOR RECORDATION, CONVEYANCES, SALES OR FINAL DESIGN. THIS DRAWING IS AN ELECTRONIC FILE FOR VIEWING ONLY. SHORELINE PLOTTED FROM ti AERIAL TO \g�� 1C310yw ORIGINAL 003-1964 LINE \NE C» � tiw Ov�PGx X x Mg• > s -1 - GO 24 w 403 �N x PpFlp x / �\�w P 0 `Gam\ 30, T hw �° x x x x x 0� O�G� T18� LZ E s\ \ q/� pq �2S \ yw �9�p L34 • ��, �s� X pANW i� s� i� \ 2p IONE 1 BUFFER NW < � yw y ORE �A� 3,2� �� EZo S % -0 �HORE\N ONE 1 1 20 RqM �28 E"-' 2 \ ' � X x X( �l\ gN j oo So Tq�F 2 UFFER\ "D» �� tiGN� FED a (�Y / x x x x N P/O�oOG\� / \ RAM B" ;,S-, qc i S x x 6), x ® /�; :�YPM 4 x x �" �o ,! , (PRE P�M �% X /� 20 �/50� C�s) x �'y � 1�1 0 E OG� \ 20 402 x X x 6N E GNF" 1 �% \\ i PROPpSED x >, P ti �\ \ \ /. 40' X BULDING \ \ _ > m PROPOS \ � �T " » NE _���.� L _ \ - � \ - - 75' AEC _ A w 5 II ED BULKHEAD �. ZONE 20 TAR-PAM _ PROPps 7 AEC _ �.�,1 \ z 3 v a x P F DOCK A 2 BUFFER ...; , _ 1249 9 Eg GRAVES C -A _C_ swep-s ^ x L 12 ® BH,- SEE Fr - x xc-3j . 1 e �� _ NOTE 2-• _ - \�1 5p TAR -PA N a (-s x l�s (- t` Ci O �. T E-� I ZONE 1 30' �"�` _ ZONE M SETBACK � ) ) x x x x " x - _�� h TAR_ 3 O (-s x x .( j x x x x x x x' x L9 © OC C ``� i71ED SIDEpOCKAM BUFFER 1 / ,.� �_20' TAR-P c� s) (-s x x x (-4s, x - ,. - _ _ - - - L F \� \ _ _ AM B F _ W O ¢� C� h �'� C11 >- 0 ) X x x x DOCK _A �\\ i F ER �\ ti d r� xQ5_ E-��EC pED� �- ZONE o h h-�a/� r �l xwn_4 �o ^ m ---�_ O` l 1 W� ® 1 PBH e - 30'-NTE 14LS `C"; �� �j �� l `re', l 4) --- ljo1 L CA A T c D S� DEEUN`��/Q ca r OlD (�e x x x x x x L 6 v� d 2 - SEE MA - BOUNDARY ) (�4. X X X x (-4) X 2 Q P BOOK -- LINE �) x (,' x x x(-4) X X 0 =. k / 6' Q U 21, PAGE j' x x 4.>) x(-4.5 x x X >(-4)X L5 tl SIAjT O 4A ----x_ x x x) x (_52 X x x x(-4) x x a 3 ED WqL AY 5.4) -x _ x ) (-QS X X X X( 4)4 x WA W Z 2 HAUL- - - _ - ) C�s. i X x X x('4.2). x x ^ / O O AREA pUT - - ) (-5.3 x X x x(-4.2) X p /�V Q TRACT :__ ) x(-- x x X r Z �>N aw9_, Q t. 3 "» ; ; C J. x x X n--__ X x )x x x > co S 2 xo i Wl�� Y.04`,5 A B 3.9) x X X X X -X--�_ X (;4.5) x Q D.B. AX3pN S x(-3) x x X--�X MAP BOOK 63' PGM68, JR. i /1 N N S 77`21 �8 E x(-3x x X x X )x x �ti to j/ P.0 21, P 3 _ 4 01S 7j4p'29" ; cP1N NoJ'�6SLIDE 5 oss gAGE 94A �' O 30, TA ONE 1 15. ,� L1 ��� (0 W � we-6 E R 100 39' S� 465 �� ® rn AM BUFFE /i� Cl) O v �n 7 Kam) rn O ? Q WA - AS �Y E�' �° HicH 7.47'1p» E �a o W O 1546 SQ O ��o PgNTE 8.97' Y�^ _1,SB� F? ZONEzi O / / •Q x GO STREET z r H� 7j•40 35» E � mci z 17 6• ARP 2 W �� 30' 100 53' 1 50 119g 3 Q a3 ^v oRr o / /� o We s -CONTROL 6594 9.966 FT. % R/W S 77.5 S 49 7 30' TAR -RAM/ 49 E= 2710528.573 FT. 78 '"> BUF 523FER a 8,. H 1 " OD Q0� h S ! Q 3 J � 77•2845'. E 112.00' Z !l S W8-4 o fOD PRELIMINARY PLAT NOT FOR RECORDATION, CONVEYANCES, SALES OR FINAL DOION. THIS DRAWING IS AH ELECTRONIC FILE FOR VIEWING ONLY. SITE TOPOGRAPHY SURVEY BY: GSC SURVEYING 4072 BARRETT DRIVE RALEIGH, NC 27609 PHONE: (919) 787-5805 :GIsaxel111049mom CGI� THE GRID TIE WAS DETERMINED FROM ACTUAL GNSS SURVEY TIE AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY: CLASS OF SURVEY: A POSITION ACCURACY: 0.07' TYPE OF GPS: NC RTN DATE OF SURVEY: 3-1-2022 DATUM: NAD83/2011 GEOID MODEL USED: NGS2012B UNITS: US SURVEY FEET r\ � TRACT "A" EXISTING TOP OF BANK 'A' TO "B" Course Bearing Distance L1 S 78'39 11 E 14.59 L2 N 53.19 53 E 15.61 L3 N 10.22 55 E 43.39 L4 N 51.36 38 W 18.12 L5 N 76.15 42 W 99.71 L6 N 82.50 23 W 41.94 L7 N 72.50 31 W 1 1 1.49 L8 N 81.08 35 W 81.30 L9 N 84.47 21 W 24.09 L10 N 74.06 45 W 61.94 L11 N 81.4017 W 17.14 L12 N 81.57 36 W 29.07 L13 71 56 W 21.25 L14 N 54.08 22 E 100.64 TRACT "B" EXISTING TOP OF BANK "D" TO 'E" Course Bearing Distance L29 S 88.38 20 E 26.21 L30 N 65.13 29 E 19.58 CONTROL POINT "B" N= 659338.592 FT. E= 271 1057.378 FT. TRACT "A" EXISTING TOP OF BANK "B' TO "C" TO -D- Course Bearing Distance L15 N 58.11 17 E 32.24 L16 N 66.29 50 E 69.83 L17 N 68.52 47 73.28 L18 N 89.0617" 1 14.32 L19 S 32'44 07 E 1 1.17 L20 N 79.33 45 E 8.65 L21 N 20.06 45 E 26.46 L22 N 70.13 20 E 66.02 L23 S 70.34 33 E 47.07 L24 S 68.28 29 E 60.37 L25 S 70.12 02 E 58.05 L26 S 57'27 00 E 23.46 L27 N 62.51 01 E 18.44 L28 S 55.25 37 E 4477. C P "A" TO C _ P _ "R" Bearing Distance S 79.08 52 E 538A N . 44 56 12'03" W TOP OF PROPOSED PILE CAP AT ELEVATION 3.60' NAVD88. z.s. HD Qs N 78.12'p31, W - 127. 60' S4RGENT 1 N/F D.B NV-ESIINENT /j N 7g� qn , „ GP1N NO 20615 PG 9GROUP LLC co ORIGINAL SITE 2.454 ACRES (106,896.2 SQ. FT.) nl n IMPFRVInwI ARFA.`� CONDITIONS AREA COMPACTED SOIL 50,043 SO. FT. PER CENT OLD IMPERVIOUS AREA: 46.8 % DRAWN FROM AERIAL PHOTO NEW IMPERVIOUS AREAS IMPROVEMENT AREA PROPOSED BUILDING 9,600 SQ. FT. NEW GRAVEL DR. 12,499 SQ. FT. NEW FUEL TANKS 300 SQ. FT. TOTAL 22,399 SQ. FT. PER CENT NEW IMPERVIOUS AREA: 15.7 % J z� i Q k "G» NOTES: 1. THIS PROPERTY LIES IN A (ZONE AE) FLOOD RISK AS SHOWN ON THE FLOOD INSURANCE RATE MAP OF BEAUFORT COUNTY 3720565 400 K, DATE JUNE 19, 2020. BASE FLOOD ELEVATION 5 FT. 2. SEE MODIFICATION OF MAJOR PERMIT NO. 115-18 ISSUED TO TJ'S LAND DEVELOPMENT, LLC AND SETTLEMENT AGREEMENT DATED MARCH 11, 2021. NOTE PARAGRAPH 19 FOR LEASE AGREEMENT. 3. OLD SHORE LINES WERE PLOTTED USING PHOTOS FROM THE LOCAL OFFICE OF THE USDA AND HISTORICAL AERIAL VIEWS. MAJOR CAMA PERMIT 115-18 ISSUED OCTOBER 5, 2018 AUTHORIZED MAINTENANCE EXCAVATION TO -6' BELOW NWL ll--�- MAJOR CAMA PERMIT 35-22 ISSUED TO SARGENT APRIL 2022 AUTHORIZED MAINTENANCE EXCAVATION TO -5' BELOW NWL SEE NOTE 3 3 GINAL SHORE LINE 2E LINE 3-27-1970 SEE NOTE 3 Tar -Pam Riparian Buffer Quantitative Data BOAT HARBOR CANAL PRE -CONSTRUCTION ZONE 1 IMP -ZONE 1 16,933 SQ. FT. 11,788 SQ. FT. ZONE 2 ZONE 2 11,338 SQ. FT. 8,886 SQ. FT. Total: 28,271 S . Ft. otal: 20,674 S . Ft. BAKER' S CANAL PRE -CONSTRUCTION ZONE 1 IMP -ZONE 1 11,442 SQ. FT. 380 SQ. FT. ZONE 2 ZONE 2 6,215 SQ. FT. 2,828 SQ. FT. Total: 17,657 S . Ft. Total: 3,208 S Ft. UPLAND EXCAVATION 0 TRACT "C" 5,271 SQ. FT. AVERAGE EXCAVATION DEPTH: 10' 1,952 CU. YDS. TOTAL SITE AREA = 4.1.17 ACRES (179,226.5 SQ. FT.) UPLAND EXCAVATION SITE "A" 31,064.9 SQ. FT. UPLAND EXCAVATION SITE "C" 5,271 SQ. FT. NEW SITE AREA 142,890.6 SQ. FT. BOAT HARBOR CANAL POST -CONSTRUCTION ZONE 1 IMP -ZONE 1 16,135 SQ. FT. 15,246 SQ. FT. ZONE 2 ZONE 2 8,516 SQ. FT. 1,480 SQ. FT. IT otal: 24,651 S Ft. otal: 16,726 S Ft. BAKER'S CANAL POST -CONSTRUCTION ZONE 1 IMP -ZONE 1 10,097 SQ. FT. 3,753 SQ. FT. ZONE 2 ZONE 2 5,413 SQ. FT. 2,656 SQ. FT. otal: 15,519 S Ft. Total: 6,409 S . Ft. SUBSURFACE EXCAVATION "BOAT HARBOR CANAL" 18,314 SQ. FT. AVERAGE EXCAVATION DEPTH: 1.5' 1,017 CU. YDS. EXCAVATE TO -5' NWL "BAKER'S CREEK" 24,144 SQ. FT. AVERAGE EXCAVATION DEPTH: 2.0' 1,566 CU. YDS. EXCAVATE TO -6' NWL UPLAND EXCAVATION "BOAT HARBOR CANAL" 10,056 SQ. FT. AVERAGE EXCAVATION DEPTH: 8' 2,980 CU. YDS. "BAKER'S CREEK" 24,144 SQ. FT. AVERAGE EXCAVATION DEPTH: 8.0' 2,641 CU. YDS. EXCAVATE TO -6' NWL z O U) > W ry I NORWOOD MARTIN MAYO, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL GPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY: 1. CLASS OF SURVEY: C 2. POSITIONAL ACCURACY: 2CM 3. TYPE OF GPS FIELD PROCEDURE: RTK, OPUS AND TRADITIONAL TRAVERSE. 4. DATES OF SURVEY: 1 1-09-2021 & 1 1-30-2021. 5. DATUM/EPOCH: NAD-83(201 1)(EPOCH:2010.0000) 6. PUBLISHED/FIXED-CONTROL USE: OPUS 7. GEOID MODEL: GEOID18 8. COMBINED GRID FACTOR(S): 0.99989081 9. UNITS: US SURVEY FEET NORWOOD MARTIN MAYO, PLS REGISTRATION NO.: L-1546 THE STATE PLANE COORDINATES (SPC) FOR THIS PROJECT WERE PRODUCED WITH STATIC GPS OBSERVATIONS AND PROCESSED WITH ON LINE POSITIONING USER SERVICE (OPUS). THE NETWORK POSITIONAL ACCURACY OF THE OPUS DERIVED POSITIONAL INFORMATION IS 0.020M. THE FOLLOWING CORS WERE USED BY OPUS PID DESIGNATION DN8741 NCWM WILLIAMSTON 2 CORS ARP DL3071 NCCI CEDAR ISLAND CORS ARP DQ9090 NCSO NCSO SWANQUARTER2 CORS ARP HORIZONTAL POSITIONS ARE REFERENCED TO NAD-83(201 1)(EPOCH:2010.0000) VERTICAL POSITIONS ARE REFERENCED TO NAVD88 USING (GEOIDI8) COMBINED FACTOR 0.99989081. ! EXISTING IRON PIPE O EXISTING IRON PIPE 1.5" BROKEN OFF 0.5' BELOW GROUND. SET 5/8" REBAR INSIDE OF PIPE. EXISTING 1 " REBAR 6" HIGH ■ EXISTING 1.5" "H" POST A EXISTING MAG NAIL 0 EXISTING SEWER MANHOLE ® NO POINT SET IR SET 3/4" REBAR (1' HIGH) 0 SET MAG NAIL ON HEADWALL SET 1.25" IRON PIPE HW OLD HEADWALL; C.P. CONTROL POINT EE) UTILITY STATION @ 30' INTERVAL PRELIMINARY PLAT PROPOSED BUILDING NOT FOR RECORDATION. OOIIW N Me SALES CR FINAL DESIN. THIS DRAWING IS AN ELECTRONIC FILE FM VIEWING ONLY. UPLAND EXCAVATION SUBSURFACE EXCAVATION ORIGINAL IMPERVIOUS AREA (E UTILITY STATION @ 30' INTERVAL (-2) WATER DEPTHS SUPPLIED BY OWNER FOR BOAT HARBOR CANAL PBH PROPOSED BULKHEAD Al MAP REVISION NWL NORMAL WATER LEVEL +0.94' NAVD88 \111/ WETLANDS ® SLIP NUMBERS 24"X36" PRINT: 1 "= 50' TEXT: 1 "= 40' 0 50 100 150 2021-122.CRD SHEET 2 2021-126GRID-MPOLDSHORELINEREVISED-6-05-2023.DWGA