Loading...
HomeMy WebLinkAbout640006_Compliance Evaluation Inspection_20230816AVi 0 Division of Water Resources Facility Number O Division of Soil and Water Conservation Q Other Agency (Type of Visit: 0 Compliance Inspection C) Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine C) Complaint 0 Follow-up 0 Referral C) Emergency C) Other Q Denied Access Date of Visit: !e - z3 Arrival Time: Departure Time: ; o County: W,4.5 l� FarmName: jj �,I i` y A-, �f j� l;rt( Owner Email: Owner Name: .S t r} c �/ ,� Phone: Mailing Address: Ste$ y, /L g $! lI�G A'/. Physical Address: 'j[)lq I'/, Region: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. t Poultry Capacity Pop. Cattle Capacity Pop. W Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other limy rounry Layers Non -Layers Pullets Turkeys Turkey Poults Other Design Current Discharaes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE ❑Yes ❑NA ❑NE b. Did the discharge reach waters of the State? (If yes, notify DWR) [:]Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes P6No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes eN ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [:]Yes gNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facili Number: - Date of Inspection-._ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes dNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ryJ,¢�,J 3CvJbA^j Spillway?: r Designed Freeboard (in): Observed Freeboard (in): �00 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes J�No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ICJ No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes EJ'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ErNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, andror wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Ej No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ENo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ffNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E] ❑ NA ❑ NE IS. Does the receiving crop and/or land application site need improvement? ❑ YesrN 0 NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? El Yes l o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �(N o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes dN ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below, ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � ` o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes �No ❑ NA [] NE Page 2 of 3 511212020 Continued Facility Number: - B Date of Inspection: $ 4 10 , 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes to ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA [] NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Nc ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ YesFj_No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No [] NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes fo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). do ,Va4r;�� Reviewer/Inspector Name Reviewer/Inspector Signature: Page 3 of 3 -/ A A h As — S, i /j I y fez de-grn L , jo✓ curtis.tyree@ work cell: 919-810-2691 Phone: 6f1'q"79/ ^ �ZS1 Date: 511212020