HomeMy WebLinkAbout20150116 Ver 1_More Info Received_20150720McGill
A S S O C I A T E S
July 9, 2015
Mr. David Brown
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801 -5006
Dear Mr. Brown:
RE: USACE Action ID 2012 -01332
DWR 401 Certification #15 -0116
Revised Drawings for Stream Pipe Impacts
Claremont Solar Park
Claremont, Catawba County, North Carolina
I am sending you revised sheet C -212 and detail sheet C -508 from the Construction Plans
for the Claremont Solar Park project. Due to comments from NCDENR Division of Water
Resources (DWQ), the original aluminum arch pipe design was changed to three reinforced
concrete pipes (allowing for a low flow pipe). After completing a No -Rise study for the stream
crossing, the replacement pipe sizes were determined as two 60" diameter pipes and one 54"
diameter pipe, as shown on the revised plans. The original crossing consisted of a single 60"
diameter CMP pipe. Due to necessary road improvements and the condition of the existing pipe,
replacement was needed. The amount of impact for this crossing (60') did not change. This is
labeled as S1 and S4 on the PCN impact table. We have been in contact with Alan Johnson of
the NCDENR Mooresville office and will be sending the revised plans to the 401 Permitting Unit
in Raleigh for their records as well.
If you have any comments or questions regarding this submission, please do not
hesitate to call me at (828) 328 -2024.
Sincerely,
McGILL ASSOCIATES, P.A.
CHRISTINE BROWN, CPSWQ, CPESC
Engineering Technician III
Cc: Rob Wilson, Sunpower Corporation
` Sheri -Morifal`voi- NCDENR- Water.Quallty Permitting; Raleigh;�NC w /attachments"
Alan Johnson, NCDENR DWR, Mooresville Regional Office, w /attachments
E n g i n e e r i n g P l a n n i n g F i n a n c e
McGill Associates, PA • 124019th Street, Lane NW, Hickoi), NC 28601
Office 828 328 2024 • Fax 828 328 3870 • www mcgillengineers corn 1-
. ("` - -` \ - J r, � ADW SCASE O'•E'EOVATIONS 1O 1 _ i 9; \ ,� � S ,
TIN FINISHED GRADE BEHIND WALL = PROPOSED ACCESS DRIVE PLAN
BW =900.3 L BW = FINISHED GRADE IN FRONT OF WALL
�. TW =900.3 PROP. 18" FES(!
BW =893.55
�Do BW= 692.35
�� \® STREAM IMPACT 51: INV. OUT 900.00
� 0' TW =900.1 � I PERMANENT STREAM DISS. /25 -8 CLASS 1
Mo BW =893.55 52- GRAVEL \ �,: EMA 100 YEAR -+• r• CROSSING (3 CULVERTS L =12.0' W =16.5' i /� :111, \� �� 5 •
I m3 ° TW =899 -8 -\ PROP• Rppp �� FLOOD LINE /• ti AND STREAM IMPACT THICK-24"
1 -x=899.6 -� pCCE?S �.• �. /• ►. I' 1 `
TWc899 O W
%. `.�.�.�•.�• ` STABZAONNT
\
HEADWALL OEWALL
PROP. CONC. - �Cp� j AT END OF PIPES ` i rrw rr ri r,'/ ^' j ! i i ' i `I \
HEADWALL/TOEWALL `S ` TW =901.5 ) (STRUCTURAL DESIGN l ' ' "i r r r \
(STRUCTURAL DESIGN \' TW =901.1 C PROVIDED BY CONTRACTOR)
BY CONTRACTOR) TW =900.7 901.5, - INV. 891.45
SEE DETAIL SHEET C -503 TW =900.4 't -T}i
( 6 BMh S4: DI 20 -B CLASS 2
FOR NON-STRUCTURAL 6 n 55.5' Ilya ) ®L= 0' W'25.0' •
ASPECTS) TW =9000 9 �a . , e9' ) �q ICK =24"
h B J FEMA NON- &� ulr
L___-, - -_ ___ -.- -- ♦ - S '� -' •Y- -* ) (DO NOT DISTURB PROPERTY gal
? �( ENCROACHMENT T ��
OUTSIDE SO. OXFORD ST. R.O.W.)1
_ ( � ; .)• . , � AREA 1
1 DO NOT DISTURB .\ O... h�► _ - , 1 \ "
1 EXIST. SEWER `, I;: •. STREET R/W - =° _ - - - , 1 , I ; I 1 ll `, \" _° 041696
. SOUTH OXFORD
„�
- 1
'1/? � ��
w +w +u+ ill I I I S^' ENGINEERS "TAMP
>s - - , l \ ' 1 `1 �\ Y PROP. 18" FES \ \
-_ -r -_ - -- - C 3 -_ DISS. #25-A CLASS 1 VALVE BOX TO\ \\
ADJUST WATER \ \\
- - -_- PROP. 18' RCP
�..�• - _ _ , -}�i ___ - L =12.0' W =16.5'
99 LF 04.55% HICK =24' SURFACE / MATCH FINISHED
---------------
- - ^ \ \\ \\\
\
�,� (DO NOT DISTURB PROPERTY \\
(1) 54' RCP `�• \, OUTSIDE S0. OXFORD ST. R.O.W.) a J
40 LF O 0 38% INV IN
54" RCP
UNDISTURBED EARTH
60" RCP III
INSTALL INV. 1.5'
BELOW GRADE - -1 I L,
BASE FLOW
B CHANNEL'
EXPOSED PROP. TYPE 3 RIP RAP \\ LL
�� SWALE - SEE DETAIL \
MIN. 1' OF R PRO OVER PIPES (SEE ROAD 8 S1: PROP. 1 60" RCP SEWER PIPE \ Q
( •�• -• SHEET C -501 tY
r PROFILE FOR PROP. FINISH GRADES) 41 L.F. O 0.37% INV IN = 891.00 `•� 1 \ a \\ Q
{V EXISTING BURY 1.5'
o'_n• �'_n' 60' RCP PROP. ITOEW \
GROUND - HEADWALL /TOEWALL G/.\, �•, � � y.�. \ � J d
... -�I 8 51: PROP. (1 60" RCP AT END OF PIPES
...... ' " "' )) (STRUCTURAL DESIGN
" " " " " " " " "' 41 LF. O 0.37% INV. IN 893,70
...... ..................
" ..... " - PROVIDED BY CONTRACTOR
cu
II ® S4: CONTINUE TO..
INV. 691.00 %•�• ��
STABILIZE DISTURBED BANKS, S4: DS`j�20 -A CLASS 2 � �I �/ �. '` Z
- - COMPACTED 5.0 W =20.0'
BEYOND THE RIP -RAP WITH NAG C1258N ® ICK =24" /� �� T.9 •� I $
BACKFlLL COCONUT FIBER MATTING ON THE SLOPES. ED DO NOT DISTURB PROPERTY �P `./• a
NOT CONTINUE MATTING THROUGH STREAM BED ( /� /j' 0
lr „' OUTSIDE S0. OXFORD ST. R.O.W.) ® T �• cRAPfucscwtE 1D+CH= 4orrr �w"
I- 1 I -1 1 I
STREAM IMPACT 51: PIPE INSTALLATION
KT!L -
ROPOSED ACCESS DRIVE PROFILE
9. 0
x
oil
L) m
E
>
<
w�
�N
orn
9. 0
S DRIVE
ADE
ao
940
I
PM STA.:- 5.20.
PROP. ACCE
PROFILE
930
910 _
9
890 `'" �� - - - - - - - - -
8 0 -
_
e
r-A
.7.
.3!97.07
_
A0. •
K: 35.4 9.37
9
2 0°' `C
®
B
/
ap0�
R
o = °
920
910
STA . 9.2649
ETA 91.17
,
o
100.00• VC
1(o.00'
VIC
e
PV
A .123.
93
u Ev ..67 67
a
$
a
K: 10.17
30.00' VC
900
®
- -
e PIPE OA
CENTERLINE
OFTTOF
i
I
890
P PEP
T CENTERLINE
OF THE
880
PROP.
e E.ISTINC 48".,
CLOWi UiAN
CENTERLIN
' RCP TO
IPE. INSTALL.
LL, virt IN
E OF ROAD 1
EPLACE
IN BASE
RT Al
890.93
_
3+00
JUL
2 0 2015
I Du1 8 BUFFE RMITT EG 5
ING T
10+00 9+00 8+DO 7+00 5 +00 5+DO 4+00 3+00
in U
u _
o _
♦ Y .Y- '_0 Ml N
IRII<lmlo
OPPORTUNITY
PROJECT 11098
DATE DRAWN OCT.. 2014
DRAWN BY RLC
2+DO 1 +00 0 +50
McGILL PROJECT NO. 12.01416 off"
@McGiff SHEET
C-212 m A S S O C I A T E S ENGINEERING-PLANNING•FINANCE
'1019R ^REET.IANE IRO' NKl[OEY. NE}IS01 %I.ILNIJ?FtW+ FIRM I.MFNYIfpJ9
'I 'E'i ,4,Y uwhMlANU.WJU -
r
—1,
UNSUITABLE SUBGRADE MATERIAL AS DETERMINED
BY ON SITE GEOTECH - MATERIAL TO BE REMOVED
ACCESS DRIVE
UNDERCUTTING EXTENTS AND DISPOSED OF OFF -SITE
�_ -
SUBGRADE TO BE DETERMINED BY UNSUITABLE MATERIAL TO BE REPLACED WITH
GEOTECH ENGINEER 12' LIFT OF COMPACTED ABC STONE ON TENSAR
BX -1100 BIAXIAL GEOGRID
' I -1 1-
I I
- I -1
" 1 I
III -1 _III -I I IE II I I-I I I =11'"
III -111 —III III — III =1- 12
TENSAR BX -1100 GEOGRID
DUKE ENERGY ACCESS DRIVE SUBGRADE
UNDERCUTTING /REPLACEMENT DETAIL
N.T.S.
A.
RFACE COURSE
NOTE : ALL THICKNESSES SHOWN
ARE MINIMUM COMPACTED.
DUKE ENERGY PAVED ENTRANCE
N.T.S.
(ASPHALT SURFACE MAY BE INSTALLED
FOLLOWING COMPLETION OF PROJECT CONSTRUCTION)
INSTALL ACCESS ROAD 9 -6^
GRAVEL BETWEEN NORMAL 15-- f
EDGE OF ROAD AND
CONCRETE PAD —
INSTALL BOLLARD AT -
CORNER OF PAD
o �
V) !T
w
U
U
a 7•_p^
wJ
U
PLAN
n
CONCRETE
TRANSFORMER PAD
cl.
Lu
Nw' 4w
s • • a �� 7% • • v s
i �l ►I\ iI�. � �;�
CONCRETE HEADWALL/TOEWALL
NOT TO SCALE
HEADWALL/TOEWALL
PROVIDE DRAINAGE
BETWEEN PADS
y
7' -0^
AND REINFORCEMENT SHALT. BE
CONCRETE
PROVIDED BY THE CONTRACTOR
AND STAMPED BY A NORTH
CAROLINA LICENSED
PROFESSIONAL ENGINEER
INVERTER PAD
INSTALL BOLLARD AT
CORNER OF PAD
EDGE OF
PANEL ARRAY
INSTALL ACCESS ROAD 9 -6^
GRAVEL BETWEEN NORMAL 15-- f
EDGE OF ROAD AND
CONCRETE PAD —
INSTALL BOLLARD AT -
CORNER OF PAD
o �
V) !T
w
U
U
a 7•_p^
wJ
U
PLAN
n
CONCRETE
TRANSFORMER PAD
cl.
Lu
Nw' 4w
s • • a �� 7% • • v s
i �l ►I\ iI�. � �;�
CONCRETE HEADWALL/TOEWALL
NOT TO SCALE
HEADWALL/TOEWALL
STRUCTURAL DESIGN OF WALLS
AND REINFORCEMENT SHALT. BE
PROVIDED BY THE CONTRACTOR
AND STAMPED BY A NORTH
CAROLINA LICENSED
PROFESSIONAL ENGINEER
_ r✓ ✓ 3% MAX. SLOPE
�-✓� � 3:1 MAX. —AWAY FROM PAD
SLOPE — CONCRETE TRANSFORMER PAD
CONCRETE INVERTER PAD PEE STRUCTURAL PLANS
(SEE STRUCTURAL PLANS OR FURTHER DETAILS)
FOR FURTHER DETAILS)
— EDGE OF SLAB REVEAL
NORMAL FINISHED GRADE ALONG ACCESS ROAD
ALONG GRAVEL ACCESS (2- MIN. - 10' MAX.)
ROADS
CONCRETE INVERTER PAD
(SEE STRUCTURAL PLANS
FOR FURTHER DETAILS)
II
PROVIDE DRAINAGE
SWALE UPSTREAM OF PROFILE
EACH PAD
3' WORK AREA BEHIND
TRANSFORMER PAD GRADED
TO 3% OR FLATTER AWAY FROM PAD
CONCRETE
INVERTER PAD
CONCRETE TRANSFORMER PAD
(SEE STRUCTURAL PLANS
OR FURTHER DETAILS)
3' WORK AREA BEHIND
INSTALL ROAD GRAVEL TRANSFORMER PAD
TO EDGE OF PAD r (3% MAX. SLOPE AWAY FROM PAD)
i EDGE OF SOLAR
PANEL ARRAY
NOTE: CONTRACTOR SHALL VERIFY
ALL CONCRETE PAD DIMENSIONS
WITH STRUCTURAL PLANS
TYPICAL INVERTER STATION
LAYOUT & GRADING DETAIL
N.T.S.
SECTION THROUGH TRANSFORMER PAD
PLANS
PROP. CONC
i
CONCRETE _
I
I
6' SCH. 10 STEEL OR IRON�� -
PIPE FILLED WITH CONCRETE
OUTER YELLOW POLYETHYLENE MIN.
I I
I I
I I
I I
I I
EASTING —I I
GROUND
CONCRETE
MIN.
MIN.
SEAL
811688 _
�i' f�lill�'1S
ENGINEER'S '.:TAMP
Y
Q
IL
Q
J
O
un
I—
Z
O
LLI O
Q W
J o
U
m
0
n_
W I I I I
I I
n
°olo�r%Tc
V) S � U U
O ° m a 0 ZpZp F
Ln
N M O U V
W M O F
m
z
a
z
W
LM 6 m U O t�
K
OPPORTUNITY
J
Q
W
Q
W
r�
LL
Q
Z
U)
8�
kI
J
BOLLARD DETAIL PROJECT 11096
REVISION DATE- NOVEMBER 3, 2008 DATE DRAWN OCT., 2014
DRAWN BY RLC
McGILL PROJECT NO. 12.01416
OMcG� SHE s/1 �((��ott
A S S O C I A T E S /1 508
ENGINEERING•PLANNING•FINANCE V VVJ V
. INOIAhaIRBki.LWENW NKTm0.Y.NC]M01 Nliall l'BHLV FNW LImEEIC0NT9 .
118 0&GETAILS.ONG
.:.
HEADWALL/TOEWALL
1
PIPE RISE
(LOWEST PIPE)
h
.•
COMPACTED CLAY
PROP. WALL FOOTINGS
AS REWIRED BY
a'..'. !:�
r ' •
MATERIAL TO BE
APPROVED BY ENGINEER
STRUCTURAL DESIGN
-
..
ti
_
_ .. ..
PROFILE
i
CONCRETE _
I
I
6' SCH. 10 STEEL OR IRON�� -
PIPE FILLED WITH CONCRETE
OUTER YELLOW POLYETHYLENE MIN.
I I
I I
I I
I I
I I
EASTING —I I
GROUND
CONCRETE
MIN.
MIN.
SEAL
811688 _
�i' f�lill�'1S
ENGINEER'S '.:TAMP
Y
Q
IL
Q
J
O
un
I—
Z
O
LLI O
Q W
J o
U
m
0
n_
W I I I I
I I
n
°olo�r%Tc
V) S � U U
O ° m a 0 ZpZp F
Ln
N M O U V
W M O F
m
z
a
z
W
LM 6 m U O t�
K
OPPORTUNITY
J
Q
W
Q
W
r�
LL
Q
Z
U)
8�
kI
J
BOLLARD DETAIL PROJECT 11096
REVISION DATE- NOVEMBER 3, 2008 DATE DRAWN OCT., 2014
DRAWN BY RLC
McGILL PROJECT NO. 12.01416
OMcG� SHE s/1 �((��ott
A S S O C I A T E S /1 508
ENGINEERING•PLANNING•FINANCE V VVJ V
. INOIAhaIRBki.LWENW NKTm0.Y.NC]M01 Nliall l'BHLV FNW LImEEIC0NT9 .
118 0&GETAILS.ONG