Loading...
HomeMy WebLinkAboutWQ0002284_Engineering Certification_1995071901 +� RECENEO Ilk WASHING -TON ONCE (JUL 19 1995 CERTIFICATION LAKESIDE VILLAGE AT KINNAKEET SHORES (KINNAKEET SHORES - PHASE 15) WASTEWATER COLLECTION SYSTEM I, Mark S. Bissell, P.E., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to periodically observe the construction of the project known as the Wastewater Collection System Extension - for the Lake Side Village at Kinnakeet Shores, Dare County, North Carolina hereby state that, to the best of my knowledge and belief, based upon the limited observation provided, a review of the contractor's records of construction and final inspection of the project as constructed, due care and diligence were used in the project construction such that the project was built within substantial compliance and intent of the plans and specifications as approved by the N.C. Division of Environmental Management under Permit No. W00002296 Amendment dated November 30, 1993 subject to the following: 1. As -built sewer line grades are indicated on the attached record drawing dated March 3, 1994. Signature JZ(_,<Registration No.. No. Date 3 — . Mw Divta m of S vfttnmental Management hereby acknowledges receipt and acceptance of this Engineers CertificatioEr—