HomeMy WebLinkAboutSW6221101_Supplement-EZ Form_20230818 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
Project Name Fort Bragg Technical Support Annex, PN79439.2
2 Project Area (ac) 15.16
3 Coastal Wetland Area (ac) 0
4 Surface Water Area (ac) 0
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H .1003(4) I
7 Width of vegetated setbacks provided (feet) 30
8 Will the vegetated setback remain vegetated? N/A
9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell 4
13 Wet Pond
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting (RWH)
18 Green Roof
19 Level Spreader-Filter Strip (LS-FS)
20 Disconnected Impervious Surface (DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Lorraine Roberts, PE - Civil Engineer
28 Organization: Exp Federal, Inc.
29 Street address: 205 N Michigan Ave., Suite 3800
30 City, State, Zip: Chicago, IL 60601
31 Phone number(s): 312-616-3309
32 Email: Lorraine.Roberts@expfederal.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
''„ OSA-r
0 F�sS i° C/1/
o
4' �<
S Signature of Designer
046:49
ttiv+ / i I I/
2 rN22- Q.
• NER
7/15/2023
Seal Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so, number of drainage areas/SCMs 5
3 Does this project have low density areas? No
4 If so, number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 5
4 Type of SCM Bioretention A Bioretention B5 Bioretention B4 Bioretention B3 Bypass
5 Total drainage area (sq ft) 722517 421487 57336 36539 50100 157055
6 Onsite drainage area (sq ft) 660203 364781 51728 36539 50100 157055
7 Offsite drainage area (sq ft) 62314 56706 5608 0 0 0
8 Total BUA in project (sq ft) 329359 sf 237757 sf 31155 sf 24840 sf 35607 sf sf
New BUA on subdivided lots (subject to
9 permitting) (sq ft) sf sf sf sf sf sf
New BUA not on subdivided lots (subject to
10 permitting) (sf) 329359 sf 237757 sf 31155 sf 24840 sf 35607 sf sf
11 Offsite BUA (sq ft) sf sf sf sf sf sf
12 Breakdown of new BUA not on subdivided lots:
- Parking (sq ft) 116629 sf 25027 sf 31155 sf 24840 sf 35607 sf sf
- Sidewalk (sq ft) 1733 sf 1733 sf sf sf sf sf
_ - Roof(sq ft) 25222 sf _ 25222 sf sf sf sf sf
- Roadway (sq ft) 31897 sf 31897 sf sf sf sf sf
- Future (sq ft) sf sf sf sf sf sf
- Other, please specify in the comment box
below (sq ft) 153878 sf 153878 sf sf sf sf sf
New infiltrating permeable pavement on
13 subdivided lots (sq ft) sf sf sf sf sf sf
New infiltrating permeable pavement not on
14 subdivided lots (sq ft) sf sf sf sf sf sf
Existing BUA that will remain (not subject to
15 permitting) (sq ft) sf sf sf sf sf sf
16 Existing BUA that is already permitted (sq ft) sf sf sf sf sf sf
17 Existing BUA that will be removed (sq ft) 152178 sf 90848 sf 23311 sf 14434 sf 4957 sf 18628 sf
18 Percent BUA _ 50% 56% 71% 68% 71% 0%
19 Design storm (inches) 1.0 in 1.0 in 1.0 in 1.0 in
20 Design volume of SCM (cu ft) 19588 cf 2576 cf 2015 cf 2879 cf
21 Calculation method for design volume SIMPLE SIMPLE SIMPLE SIMPLE
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
"Other" BUA for DA1 is the paved area around the building. Certain areas of
the site bypass the pond, therefore the total site areas will not equal the
sum of the pond areas.
BIORETENTION CELL
1 Drainage area number 1 (A) 2 (B5) 3 (B4) 4 (B3)
2 Minimum required treatment volume (cu ft) 19588 cf 2576 cf 2015 cf 2879 cf
GENERAL MDC FROM 02H .1050 A
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes Yes
4 Is the SCM located away from contaminated soils? Yes Yes Yes Yes
5 What are the side slopes of the SCM (H:V)? 3:1 3:1 3:1 3:1
6 Does the SCM have retaining walls, gabion walls or other
engineered side slopes? No No No No
Are the inlets, outlets, and receiving stream protected from erosion 7
(10-year storm)? Yes Yes Yes Yes
Is there an overflow or bypass for inflow volume in excess of the
8
design volume? Yes Yes Yes Yes
_ 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump (preferred) Pump (preferred)_
10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes Yes
11 Does the maintenance access comply with General MDC (8)? Yes Yes Yes Yes
12 Does the drainage easement comply with General MDC (9)? N/A N/A N/A N/A
If the SCM is on a single family lot, does (will?) the plat comply with
13
General MDC (10)? N/A N/A N/A N/A
14 Is there an O&M Agreement that complies with General MDC (11)? No No No No
15 Is there an O&M Plan that complies with General MDC (12)? No No No No
16 Does the SCM follow the device specific MDC? Yes Yes Yes Yes
17 Was the SCM designed by an NC licensed professional? Yes Yes Yes Yes
BIORETENTION CELL MDC FROM 02H .1052 Mill
18 SHWT elevation (fmsl) 247.00 <247 <246 <245
19 Bottom of the bioretention cell (fmsl) 255.00 266.00 266.00 266.00
20 Ponding depth of the design storm (inches) 12 in _ 12 in 12 in 12 in
21 Surface area of the bioretention cell (square feet) 21300 sf 3783 sf 4656 sf 4656 sf
22 Design volume of SCM (cu ft) 22566 cf 4713 cf 5595 cf 5595 cf
23 Is the bioretention cell used for peak attenuation? Yes No No No
24 Depth of peak attenuation over planting surface (in) 24 in _ N/A N/A N/A
25 Height of peak attenuation outlet above the planting surface (in) 18 in N/A N/A N/A
26 Infiltration rate of the in situ soil (inch/hour) in/hr in/hr in/hr in/hr
27 Diameter of the underdrain pipes (if applicable) 6 in 4 in 4 in 4 in
28 Does the design include Internal Water Storage (IWS)? Yes Yes Yes Yes
29 if so, elevation of the top of the IWS (fmsl) 253.5 264.5 264.5 264.5
30 Elevation of the planting surface (fmsl) 255 266 266 266
31 What type of vegetation will be planted? (grass, trees/shrubs,
other)? Grass _ Grass Grass Grass
32 Media depth (inches) 30 in 30 in 30 in 30 in
33 Percentage of medium to coarse washed sand by volume 85% 85% 85% 85%
_ 34 Percentage of fines (silt and clay) by volume 10% 10% 10% 10%
35 Percentage of organic matter by volume 5% _ 5% 5% 5%
36 Type of organic material Pine Bark Fines Pine Bark Fines Pine Bark Fines Pine Bark Fines
37 Phosphorus Index (P-Index) of media (unitless) 10 10 10 10
38 Will compaction be avoided during construction? Yes Yes Yes Yes
39 Will cell be maintained to a one inch/hour standard? Yes Yes Yes Yes
40 Depth of mulch, if applicable (inches) N/A N/A N/A N/A
41 Type of mulch, if applicable N/A N/A N/A N/A
42 How many clean out pipes are being installed? 4 4 4 4
43 Type of pretreatment that will be used: Forebay Grass/Gravel Grass/Gravel Grass/Gravel
ADDITIONAL INFORMATION * II
Please use this space to provide any additional information about
44
[the bioretention cell(s):
Surface area is considered to be the area of the bottom of the pond.
Volume accounts for 3:1 sideslopes. Items 12, 14, & 15 are not necessary
at Fort Bragg. Fort Bragg has a standard O&M program for the entire
base.
Bioretention 3 10:40 AM 8/10/2023