Loading...
HomeMy WebLinkAbout20140975 Ver 1_Certification of Completion_20150702fs CDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary DWQ Project No.: 14 -0975 County: Wake Applicant: MLC Automotive, LLC Project Name: American Airlines - Leith Auto Connector Road Date of Issuance of 401 Water Quality Certification: September 22, 2014 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: !f this project was designed by a Certified Professional as a duly registered Professional E - sneer i.e. meer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe eriodicall weekly, full time) the construction of the project, for the Pennitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality C tication and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ^� ����E:t6�vp�o. 03875% Date 6 /as�l s A, ' ' ' S ' ' �ti � 0 f [ a �- ---- -- 1650 Mad Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N Salisbury St Floor 9 Raleigh Nortn Carolina 27604 -1170 Phone- 919-807 -63011 FAX 919 - 807 -6494 Internet: wvnv rimaterquality.org An Equal Opportunity i A(frmative Action Employer = 0'O 9' °" p39756 %� �• GIN• 5���� '4 /V 2 2015 ' DENR . wAT Q1_ 401 & BU FER ERNdURJ No hCaro ii�a rri irtuMAY