Loading...
HomeMy WebLinkAbout20190164 Ver 2_Cass excavation agreement signature page_20230816Ewe agree to develop any required mitigation plans and to complete any required mitigation activities at my/our own expense within the specified time frames. Ewe recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. Ewe agree to notify Duke Energy by phone when the excavation is initiated and to ensure that during the excavation period, Uwe will post Duke Energy's approval letter in a clear waterproof bag at the job site and visible from the water's edge. I/we agree to notify Duke Energy in writing when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. 1we recognize security deposits will not be refunded if any violations of the SMP, other applicable guidelines, or this user's agreement occur. Ewe understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. Uwe agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. Ewe understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, Jeffrey J. Cass Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) 4'e--&�OQ 6-V4:1 - licant's lignature Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Duke Energy Page 4 Rev: 4W2020