HomeMy WebLinkAbout20190164 Ver 2_Cass excavation agreement signature page_20230816Ewe agree to develop any required mitigation plans and to complete any required mitigation
activities at my/our own expense within the specified time frames. Ewe recognize that the
excavation work is not considered complete and deposits will not be refunded until the
mitigation requirements (if any) have been satisfactorily fulfilled.
Ewe agree to notify Duke Energy by phone when the excavation is initiated and to ensure that
during the excavation period, Uwe will post Duke Energy's approval letter in a clear waterproof
bag at the job site and visible from the water's edge.
I/we agree to notify Duke Energy in writing when the excavation is completed (including any
required mitigation measures) and that the excavation was completed per the approved
application, so a close-out inspection can be performed.
1we recognize security deposits will not be refunded if any violations of the SMP, other
applicable guidelines, or this user's agreement occur.
Ewe understand there will be no change in hydro project operations as a result of the excavation
and/or utilization of the excavated area.
Uwe agree to maintain the work area in a safe condition and to fully indemnify and save Duke
Energy harmless from any and all claims, liability, loss or damage that may arise from this
excavation project.
Ewe understand that this user's agreement does not, in any way, constitute the transfer of any
rights in real property and that my/our use and enjoyment of FERC project and Duke Energy
lands and waters shall not hinder the general public's lawful use and enjoyment of the same.
Sincerely,
Jeffrey J. Cass
Applicant's Name (Print)
Co -Applicant's Name (Print)
Co -Applicant's Name (Print)
Co -Applicant's Name (Print)
Co -Applicant's Name (Print)
4'e--&�OQ 6-V4:1 -
licant's lignature
Co -Applicant's Signature
Co -Applicant's Signature
Co -Applicant's Signature
Co -Applicant's Signature
Duke Energy Page 4 Rev: 4W2020