Loading...
HomeMy WebLinkAbout20231139 Ver 1_Riparian Buffer Authorization Request_20230814Original Submittal 8/14/2023 A. Owner/Applicant Information General Information Q .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Primary Contact Email: * mgardner@gardnercreativegroup.com Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* 0 Owner O Applicant other than Owner O Agent Is there an agent working on this application but Yes not submitting it? No 1. Property Owner Information: ............................................................................................................. 1a. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1 d. Telephone:* 704-400-2265 Mark C & Anne R Gardner (for Corporations) Street Address PO Box 1889 Address Line 2 City Huntersville Postal / Zip Code 28070 B. Project Information and Prior Project History State / Province / Region NC Country USA 1e. Email Address:* mgardner@gardnercreativegro up.com 1. Project Information 0 .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1a. Name of Project:* M Gardner property uncovered and slatted deck (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No 1d. Subdivision Name: Westcape Village le. Nearest Municipality: Denver NC 1f. Property Size: 0.01 acres 1 g. County (or Counties) where the project is located:* Lincoln 1h. Property ID# Date of Purchase 29684 8/16/2018 Tax PIN or Parcel id 11. Deed Information Type of Book Book#11 Page# Deed F 427 Map E 082 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document Westcape Recorded Plot Map.pdf 48.25KB PDF only 1 k. How would you like to provide the Latitude and Longitude information? Address Lookup Manually Address Lookup Street Address 8062 Westcape Drive Address Line 2 City Denver Postal / Zip Code 28037 Latitude* 35.514930 Longitude* 11. Is the project located in any of North Carolina's twenty coastal counties?* 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * Lake Norman 2b. Water Quality Classification of nearest receiving water: WS IV State / Province / Region INC Country USA -80.968600 Yes No 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 300 (linear feet only) 3. Project Description: ...... ... ....... 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Entire site of proposed deck is now grassed and used exclusively as a residential lawn. No tree will be impacted. All of the surrounding area is also residential lawn. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * Extend existing (19-20ft. wide) lake front deck by 10ft. Family is growing. With additional in-laws, grandchildren & pets, we need more patio/deck space. New, uncovered, slatted deck to be constructed using pressure treated lumber. Flooring to be installed with spacing to create a porous/pervious surface. All construction will be by hand labor. No heavy equipment will be used at all. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document PORCH Plan BIdg6 GARDNER 8-14-23 doc.pdf 4.22MB PDF only 5. Jurisdictional Determinations .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No 7. Future Project Plans ...................................................................................................... 7a. Is this project a phased project?* Yes No C. Proposed Impacts Inventory A Buffer Impacts Q .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Uncovered, Wooded Deck Lake Norman Permanent (P) Allowable 0.00 200.00 Map label (e.g. Road Crossing 1) Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 200.00 Total Buffer Impacts: 200.00 Comments: TOTAL Zone 2 impact looks to be less than 200 sq ft. This request is to extend our existing deck by 10 feet & relocate deck's 10 feet as well. New, uncovered, slatted wooden deck would measure approximately 20 feet x 10 feet. Newly relocated, new! constructed wooden steps would be moved out by no more than 10 feet & remain 4 feet wide. (( Plans call for our next door neighbors, the Gardners, to request authorization to extend their existing deck by approximately as well. Ideally the construction of both decks & steps would be completed as one project built by one contractor. )) D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. Any impact to Zone 2 will ONLY be to a grassed lawn area. No trees to be impacted. New uncovered, wooden slatled deck construction will have porous/pervious flooring which will not limit the positive benefits of natural rainfall. All construction will be by hand. No heavy equipment will be used. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Only construction impact will be to manually dig holes for vertical support framing (maximum of 4 to 6 holes - contractor to determine what will be needed) for the deck's wooden support framing. All construction will be by hand. No heavy equipment will be used. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document PORCH Plan BIdg6 GARDNER 8-14-23 doc.pdf 4.22MB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document PDF only Additional Comments: SECTION B. PROJECT INFORMATION AND PRIOR PROJECT HISTORY: Question 1 - Beam's platted lot number is 1084. SECTION 4. PROPOSED ACTIVITY: Attached pdf Site Plan - Recommend application's reviewers zoom in on the attached pdf files. Property owners' names are posted left to right (Adamson, Merchel, Bear, Gardner). The "Concrete Patio" has been in place all along. The goal of this project is to simply add on an additional 10 feet of usable, outdoor, uncovered deck space. Intent is to not disturb any existing, environmentally friendly flows of rainfall into the lake. Other than covering an existing grassy area with a porous/pervious deck floor, no other natural vegetation will be impacted at all A fully licensed general contractor will construct the entire project. Any and all Lincoln County permits and/or specifications will be fully adhered to. Project will also be formally reviewed and approved by the Westcape Village Homeowners Association's (HO) Architectural Review Committee AND the HOA's Board of Directors. H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the application form." Print Name: * Mark C. Gardner Signature /X- Submission Date: 8-14-2023 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* Yes No Yes No 20231139 1 Andrew Pitner:andrew.pitner Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received Need Fee - send electronic notification