Loading...
HomeMy WebLinkAboutNCC203294_NOT Closeout Documents_20230815 • lid{. __, i JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT _tii: SEDIMENTATION INSPECTION REPORT 309 E.MARKET STREET,SMITHFIELD,N C 27577-TELEPHONE(919)209-8333 Inspection Information Date: 2/23/2023 Type of Inspection Construction Stage Date of Inspection: 2/22/2023 ❑ Initial Inspection ❑ Pre-Construction ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Shannon Stanley ❑ On-Site Meeting ❑ Infrastructure ❑ Progress Inspection ❑ Temp Site Stabilization Others Present: Click or tap here to enter Final Inspection ❑ Vertical text. Photos: ❑ Yes ® No ❑ Plat Inspection ® Final Site Stabilization ❑ Spot Check Inspection Weather and Site Conditions: ❑ Complaint Inspection Sunny and workable Development/Owner Information Project Name: Redhawk Landing Project Number: 19-037-P Project Location: NC HWY 210 This Report Sent To: Click or tap here to enter text. Email:talsop@windjamdevelopment.com ❑ File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Insert Land Owner Activity: ❑ Same as owner Click or tap here to enter text. 6. Comments/Notes: Final inspection.The site is stabilized.The erosion control permit for Johnston County is closed. 7. Corrective Actions: a. 8. Photos: