Loading...
HomeMy WebLinkAbout20231138 Ver 1_ePCN Application_20230813DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 11 /4/2022 BIMS # Assigned 20231138 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Raleigh Regional Office - (919) 791-4200 Information for Initial Review 1a. Name of project: Ferris Waterfront 1a. Who is the Primary Contact?* Shaun Liggett 1b. Primary Contact Email: * conceptcontractdesign@gmail.com Date Submitted 8/13/2023 Nearest Body of Water Lake Royale Basin Tar -Pamlico Water Classification Cypress Creek Site Coordinates Latitude: 35.955048 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Franklin Is this a NCDMS Project Yes No Longitude: -78.193648 Version#* 1 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Zachary Thomas:zachary.thomas@ncdenr.gov 1c. Primary Contact Phone:* (919)819-6698 Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 197800056 - Piers, Docks, Boathouses 197800080 - Bulkheads and Riprap le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying forthe permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Robert W. Ferris and Wife Maxine S. Ferris 2b. Deed book and page no.: Book:2313 Page:1655 2c. Contact Person: 2d.Address Street Address 11312 Old Creedmoor Rd Address Line 2 City Raleigh Postal / Zip Code 27613 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: (919)610-2251 2g. Email Address: rferris@sfla.biz 4. Agent/Consultant (if applicable) 4a. Name: Shaun Liggett 4b. Business Name: Concept Contracting and Design LLC 4c.Address Street Address 1213 Rocky Point Ln Address Line 2 City Durham Postal / Zip Code 27712 4d. Telephone Number: (919)819-6698 4f. Email Address: conceptcontractdesign@gmail.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) Lake Royale 1c. Nearest municipality / town: Bunn 2. Project Identification 2a. Property Identification Number: PIN:2830836426 PID:022688 2c. Project Address Street Address 741 Sagamore Drive Address Line 2 City Louisburg Postal / Zip Code 27549 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Lake Royale 3b. Water Resources Classification of nearest receiving water:" Cypress Creek 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201010601 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 2b. Property size: 1.94 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * Wooded lot, heavy vegetation and undeveloped. land use at lake royale subdivision includes Residential Single Family Dwellings and Waterfront docks/ Boathouses/ Seawalls a 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:* Improve the waterfront buffer zone by means of stabilizing the waters edge from continual erosion by installing vinyl seawall/bulkhead, install dock along shoreline and boathouse for personal watercraft. install new plantings and trees and landscaping to eliminate erosion. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * - remove approximately (20) large trees that are dangerous or otherwise compromised due to erosion and will be impacted by the new erosion control stabilization of the shoreline. install vinyl seawall, boathouse and docks at waters edge - install retaining walls and riprap erosion control within the riparian buffer zone 1 and 2 - equipment to include skid steer, excavator, pile driving hydraulic hammer 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Remove trees P cypress creek No 200 100 install seawall P cypress creek No 660 0 install landscape walls grading and backfill of seawall and landscape walls P T cypress creek cypress creek No No 600 1,000 400 200 install docks and boathouse P cypress creek No 700 0 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 1,000.00 200.00 Zone 1 Zone 2 Total Permanent impacts: 2,360.00 500.00 Zone 1 Zone 2 Total combined buffer impacts: 3,360.00 700.00 6i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: -design includes keeping some large trees and will be protected to keep them from damage. -design incorporates the natural topography and added seawall, site walls and landscape/ ground covers in the design to minimize the future erosion -design includes use of stormwater pipes and mitigation thru landscape hold back areas and slow release beds/natural areas 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: - advanced soil and erosion control measures and hold back temp ponds or drainage swale basins during construction to minimize erosion before silt can reach the buffer zone temporary ground cover during construction of seawall and site walls and docks - drive sheet piles for seawalls and minimize or avoid hydraulic wash -in of sheets 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: work is on a closed body of water no impacts to any stream F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: waters of lake royale are considered a closed body of water 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?'� Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) a 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? www.NCwildlife.org 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? www.ncwildlife.org 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? nc historic preservation office website and map 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: seawall construction will be driven as to not be damaged or lost during flood by means of driving sheet piles into earth and permanent attachment anchorage to land 8c. What source(s) did you use to make the floodplain determination? Tema nc quick guide 2017 Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Ferris Waterfront PCN Submission.pdf 14.72MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: shaun patrick liggett Signature ✓/rriiNprrri;� /.��yr Date 8/13/2023 M