Loading...
HomeMy WebLinkAboutSWA000215_email_20230816 (2) Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, August 16, 2023 9:14 AM To:Luke Bugenske Cc:Mike.Cully@UnitedPlateGlass.com; Mathew Birmingham Subject:RE: \[External\] Re: SWA000215; United Plate Glass Expansion (Lincoln) Do you have an unsigned copy that you can upload? We can then either just scan in the signature pages or add an electronic stamp to the unsigned uploaded pages indicating that we have a signed hard copy on file. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Luke Bugenske <luke@oak.engineering> Sent: Wednesday, August 16, 2023 9:11 AM To: Farkas, Jim J <Jim.Farkas@deq.nc.gov> Cc: Mike.Cully@UnitedPlateGlass.com; Mathew Birmingham <mathew@oak.engineering> Subject: \[External\] Re: SWA000215; United Plate Glass Expansion (Lincoln) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Jim, The plans have been uploaded. We cannot upload the application as it was wet sealed by the engineer and the owner separately and sent to you prior to scanning a copy. Can you scan it on your end and add to the project? Thanks Luke 1 On Wed, Aug 16, 2023 at 8:38 AM Farkas, Jim J <Jim.Farkas@deq.nc.gov> wrote: Can you please upload the electronic files associated with the 8/8/23 submission to the following link? https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Farkas, Jim J Sent: Wednesday, July 26, 2023 4:11 PM To: Luke Bugenske <luke@oak.engineering> Cc: Mike.Cully@UnitedPlateGlass.com Subject: RE: SWA000215; United Plate Glass Expansion (Lincoln) Luke, I was looking over the additional information you provided on \[Date\]. Everything looks good except for a few small issues: Please correct the following: 2  There appears to be a discrepancy between the new BUA information as shown in the Application (22, 062 sf) and the new BUA information as shown in the calculation booklet (23,670 sf building + 9,670 sf parking = 33,340 sf). Please revise or clarify as needed.  Please correct the following items with the Application: o Part E4 – Please only list the immediate receiving water that stormwater runoff will discharge to for this project. Downstream surface waters that the immediate receiving water discharges to should not be listed on this form. o Part E5 – See earlier comment, please revise if needed. o Part G – Please provide 1x original signed hard copy of this part of the Application. 2x original signed hard copies of this part of the Application are required and only a single original signed hard copy appears to have been provided. o Part H - Please provide 2x original, signed & sealed hard copies of this part of the Application. 2x original signed hard copies of this page of the Application are required, but both provided hard copies appear to be photocopies. While not required for ATC approval, there may be some issues with the design as proposed (The Fast-Track ATC review is not an in-depth technical review of the stormwater controls for the site, it is more of an administrative review of the project/a review to see if the project has the potential to meet the design requirements/rules. The SCM design and drainage area delineation are not required submission items at this point in the Fast-Track submittal process so issues with the SCM design or drainage area delineation do not prevent a project from getting Fast-Track ATC approval, but if the SCM design and drainage area delineation are provided at this point in the review, we look at them to see if the design appears to meet the rules and MDC):  Sand Filter MDC 1 – The soil boring & elevation of the SHWT will need to be provided (The provided note on plan sheet C4.2 indicates that the SHWT was not encountered to an elevation of 755.0’ (10’ below existing grade) which is approximately 100’ lower than the actual existing grade).  General MDC 8 & 9 – The proposed SCM will need to be located within a maintenance access easement. The easement should include the entire SCM system (side slopes, forebay, riser structure, SCM device, basin outlet, dam embankment, outlet, emergency spillway, etc…) plus 10 or more feet around the SCM (to provide room for maintenance tasks) and must extend to the nearest public right of way. Since these items are not required for ATC approval, they do not need to be addressed at this time, but if you do, we will take a look at the revised design as part of the next review. NOTE: The project will need to comply with the rules/regulations before the Final Approval (part 2 of the Fast-Track permitting process) is issued for the site and before the E&SC permit is closed out. Please provide the following:  1x original, signed & notarized hard copy of Part G of the Application.  2x original, signed & sealed hard copies of Part H of the Application.  2x hard copies and 1x electronic copy of the revised pages of the Application.  1x hard copy of any other items needed to address the “While not required for ATC approval” comments (as applicable). Hard copies should be mailed to me at the following address: 3 For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1636 Mail Service Center Raleigh, NC 27699-1636 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal review. The quickness of the next review for this project is dependent on reviewer availability. Let me know if you have any questions. Jim Farkas State Stormwater Engineer 4 North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Thursday, July 6, 2023 8:07 AM To: Luke Bugenske <luke@oak.engineering>; Mike.Cully@UnitedPlateGlass.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: SWA000215; United Plate Glass Expansion (Lincoln) Good Morning, We received your post-construction stormwater Authorization to Construct (ATC) permit application for the subject project on 6/30/2023. Reviews under the Fast-Track permitting process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan 5 sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000215 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Luke Bugenske <luke@oak.engineering> Sent: Thursday, June 29, 2023 3:23 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Greg Welsh <greg@oak.engineering> Subject: Re: \[External\] Fwd: FW: United Plate Glass Expansion; Lincolnton, Lincoln County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. 6 Thanks Kaitlin. The other documents were just overnighted. You should receive them tomorrow by 12pm. Luke On Thu, Jun 29, 2023 at 3:09 PM Peck, Kaitlin <kaitlin.peck@deq.nc.gov> wrote: Hi Luke, I just wanted to update you that I have received your updated site plans sheet showing wetland delineation and transmittal. I am still waiting for your application and LLC SoS information to come through the mail. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 7 From: Luke Bugenske <luke@oak.engineering> Sent: Thursday, June 29, 2023 10:36 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Greg Welsh <greg@oak.engineering> Subject: \[External\] Fwd: FW: United Plate Glass Expansion; Lincolnton, Lincoln County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Kaitlin, We were forwarded the preliminary comments below for the subject project. Please see responses below in red.  2x hard copies and 1x electronic copy of the Application with the following corrections made (These items are required per 15A NCAC 02H .1043(3)(a) and per Section F of the Application):  Section G – Please provide the applicant’s/financially responsible party’s original, notarized and sealed signature in this section of the Application. NOTE: The signatures previously submitted were copies, not originals.  Section H – Please provide the design professional’s original, notarized and sealed signature in this section of the Application. NOTE: The signatures previously submitted were copies, not originals. The original application is being overnighted today. Please confirm you already have 2 hard copies and 1 electronic copy (also attached)  2x hard copies and 1x electronic copy of a USGS topographic map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within ½ mile of the site 8 boundary, include the ½ mile radius on the map. This item is required per 15A NCAC 02H .1043(3)(e) and per Section F, 3 of the Application. A USGS map is included in the stormwater report that was previously submitted. Please confirm that this satisfies this comment.  2x original hard copies and 1x electronic copy of a site plan depicting wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1043(3)(f) and per Section F,4 of the Application. The plans provided to address this comment. There are no wetlands, streams or buffers on the site, thus none are shown on the site plan. Please confirm that this satisfies this comment.  2x hard copies and 1x electronic copy of a construction sequence that discusses how any future development on the project may be phased. This is required per 15A NCAC 02H .1043(3)(g) and per Section F, 5 of the Application. The construction sequence does not need to be lengthy, just a brief description of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construction sequence. This item is different than the E&SC sequence of construction. The plans provided have a construction sequence on sheet C1.1, Please confirm that this satisfies this comment.  2x hard copies and 1x electronic copy of documentation from the NC Secretary of state, or other official documentation, which supports the titles and positions held by the persons listed in Section c, 2 per 15A NCAC 2H .1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of state; otherwise, the application will be returned. See attached for SoS filing document. Please confirm that this satisfies this comment. Please call me if you have any questions or would like to discuss these responses further. Thanks, Luke 803.312.5074 9 ---------- Forwarded message --------- From: Greg Welsh <greg@oak.engineering> Date: Wed, Jun 28, 2023 at 8:32 AM Subject: Fwd: FW: United Plate Glass Expansion; Lincolnton, Lincoln County To: Luke Bugenske <luke@oak.engineering> ---------- Forwarded message --------- From: Brandon Reisser <breisser@frampton.construction> Date: Tue, Jun 27, 2023 at 9:16 AM Subject: FW: United Plate Glass Expansion; Lincolnton, Lincoln County To: Dan Moore <dmoore@frampton.construction>, Greg Welsh <greg@oak.engineering>, Matt Mullin <mmullin@frampton.construction> See below. We need to discuss below so we can call Cory to discuss. Brandon Reisser Senior Preconstruction Manager O 980.556.1084 M 910.583.4398 4500 Cameron Valley Pkwy, Suite 220 Charlotte, NC 28211 www.frampton.construction 10 f | in | t | vCard From: Cory Brown <Cory.Brown@UnitedPlateGlass.com> Sent: Tuesday, June 27, 2023 9:13 AM To: Brandon Reisser <breisser@frampton.construction> Subject: FW: United Plate Glass Expansion; Lincolnton, Lincoln County \[EXTERNAL\] Call me when you see this please Cory Brown Director of Administration And Information Technology United Plate Glass 108 Grundman Drive Butler, PA 16001  724-486-2933 Direct | 724-487-5883 Cell cory.brown@unitedplateglass.com |  www.unitedplateglass.com This transmission contains confidential information intended only for the addressee(s). If you are not the intended recipient, any use, dissemination, distribution, or copying of this document or its contents is strictly prohibited. If you receive this message in error, please contact the sender immediately. Thank you. Please consider the environment before printing this e-mail. 11 From: Mike Cully <Mike.Cully@UnitedPlateGlass.com> Sent: Tuesday, June 27, 2023 9:09 AM To: Cory Brown <Cory.Brown@UnitedPlateGlass.com> Subject: Fwd: United Plate Glass Expansion; Lincolnton, Lincoln County Get Outlook for iOS From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Monday, June 26, 2023 11:50:07 AM To: Mike Cully <Mike.Cully@UnitedPlateGlass.com>; luke@oak.engineering <luke@oak.engineering> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: RE: United Plate Glass Expansion; Lincolnton, Lincoln County \[EXTERNAL\] This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. NOTE: There is not Express option for non-coastal stormwater permitting. We will continue to process your application as a Authorization to Construct, Fast-Track permit as submitted. Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 12 From: Peck, Kaitlin Sent: Monday, June 26, 2023 11:47 AM To: Mike.Cully@UnitedPlateGlass.com; luke@oak.engineering Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Eplin, Jerry W <jerry.eplin@deq.nc.gov> Subject: United Plate Glass Expansion; Lincolnton, Lincoln County Good Morning, We received your application for a new Fast-Track post-construction stormwater permit on 6/23/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/26/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies and 1x electronic copy of the Application with the following corrections made (These items are required per 15A NCAC 02H .1043(3)(a) and per Section F of the Application):  Section G – Please provide the applicant’s/financially responsible party’s original, notarized and sealed signature in this section of the Application. NOTE: The signatures previously submitted were copies, not originals.  Section H – Please provide the design professional’s original, notarized and sealed signature in this section of the Application. NOTE: The signatures previously submitted were copies, not originals.  2x hard copies and 1x electronic copy of a USGS topographic map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within ½ mile of the site boundary, include the ½ mile radius on the map. This item is required per 15A NCAC 02H .1043(3)(e) and per Section F, 3 of the Application. 13  2x original hard copies and 1x electronic copy of a site plan depicting wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1043(3)(f) and per Section F,4 of the Application.  2x hard copies and 1x electronic copy of a construction sequence that discusses how any future development on the project may be phased. This is required per 15A NCAC 02H .1043(3)(g) and per Section F, 5 of the Application. The construction sequence does not need to be lengthy, just a brief description of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construction sequence. This item is different than the E&SC sequence of construction.  2x hard copies and 1x electronic copy of documentation from the NC Secretary of state, or other official documentation, which supports the titles and positions held by the persons listed in Section c, 2 per 15A NCAC 2H .1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of state; otherwise, the application will be returned. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute. Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. Thank you, 14 Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 15