Loading...
HomeMy WebLinkAboutNCC203465_NOT Closeout Documents_20230815 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Cumberland Project: Eastover Community Park River basin: Cape Fear Person financially responsible:Town of Eastover-Charles G McLaurin,Mayor Project#: CUMBE-2020-203 NCC203465 Address: 3863 Dunn Road,Eastover,NC 28312 1. Project Location: Ballpark Road,Eastover Pictures: No 2. Weather and soil conditions: Dry/Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one on site Title: Inspection report: Sent Report Date given/sent: July 26,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG010000)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bailey Taylor Others present: Date of inspection: July 26,2023 Time arriving on site: 12:13 PM Time leaving site: 12:20 PM CC: