Loading...
HomeMy WebLinkAbout20231131 Ver 1_6185 Sunrise Lane Boat Lift Plans_202308116/29/23, 3:00 PM Submission Completed Project Submittal Interim Form Updated September 4, 2020 e "MN .•y�'GG�ff11• 'J NORTH CAROLINA Ert0ronmrnfal Quafury Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * C For the Record Only (Courtesy Copy) C New Project C Modification/New Project with Existing ID C More Information Response C Other Agency Comments CQ Pre -Application Submittal C Re-Issuance\Renewal Request �) Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 11 if►47f►204, 93 Project Contact Information Name: John R. Davis Jr. Who is submitting the information? Email Address: * soilhorizons@gmail.com Project Information Project Name: * 6185 Sunrise Lane Is this a public transportation project?* Yes No https://edocs.deq.nc.gov/Forms/Form/Submit 1 /3 6/29/23, 3:00 PM Submission Completed Is the project located within a NC DCM Area of Environmental Concern (AEC)?* Yes No Unknown Is this project connected with ARPA funding?* Q Yes G No .............................................. County (ies)* Nash Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document pier draft signed. pdf 770.9KB Pittman Pier Update.PDF 948.54KB soil horizons signed.pdf 375.69KB Only pdf or kmz files are accepted. Describe the attachments or add comments: Attached is a tax map to show the lot boundaries on the Tar River Reservoir An Agent Authorization form. A sketch showing the expansion plans to the existing dock. * By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ 1 agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ 1 agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ 1 intend to electronically sign and submit the online form. Signature: * ClU"? 109. Submittal Date: https://edocs.deq.nc.gov/Forms/Form/Submit 2/3 June 7 2023 TO: Soil Horizons, LLC PO Box 1063 Youngsville, North Carolina 27596. FROM: Mark Pittman I Mark Pittman , as owner concerning the property on 6185 Sunrise Lane, Rocky Mount, NC do hereby authorize and give permission for Soil Horizons, LLC to represent or act as agent on my behalf and apply for a preconstruction notification or permit and allow The US Army Corps of Engineers or NC Division Water Quality or any other regulatory agency to go on the property for such purposes as necessary to perform the job tasks. 14A III, VARNZO' �� (Name, Address and Phone No. below this line) Mark Pittman 6185 Sunrise Lane Rocky Mount, NC 27803 252.908.1570 O 7 Tv,.�e zyZ3 Date i,4asn t-ounty, iwrm t-arouna oune zs, LUL.S 7 •r a r _ - L•, r m .- Nm Dock 0 Y w - D " Y Site • Y _ 1" = 60 ft Na-sk Counf Print map scale is approximate. Critical layout or measurement L��'�r�7A Y activities should not be done North using this resource. MAP FOR REFERENCE ONLY NOT LEGAL DOCUMENT Nash County, North Carolina makes no claims and no warranties, expressed or implied, concerning the validity or accuracy of the GIS data presented on this map. PROJECT: hJ z SHEET NO: OF CONSULTING ENGINEERS, PA G � 1�j I�—G.� DATE•�T�� BY: (, CIVIL, MUNICIPAL STRUCTURAL ENGINEERST—�l COMPREHENSIVE ENVIRONMENTAL SERVICES T P.O. Box 7966, Rockv Mdu—ht. NC 27804 u- ■E ei Construction Details Schematic O � G a � s � ro IV g 27 r� 4 L � rb VJ � J WHATEVER St3F RILIiUG All boat hoist USA Aluminum Lifts rcitta., standard with 12'�i" � cradle beams which can easily be cut dawn for narrow slips. n' a7 Boat Hoist USA will cut the m beams to 11' when specified. � 'vA Top Be� ffistallation Pile Spacing 41 ,"t-7 zgU-0 '* j,4v TOP BEAM POWER UNIT 'l2'-2e OUTSIDE OF PILING TO OUTSIDE m 4 d121 691 U z 6) For 6K through 8K Lifts use a MINUMUM 8" Piling For 10-13K use a MINUMUM 10" Piling 0. Your lift will include 2 aluminum hoist FT___ mounting plates. These will remour t to the front of the beams, slots down Attaching- the cables to the. ' Your lift will have 4 pieces of pre cut and swaged cable, each cable is carefully cut to 15' each as to insure proper level. The hardware kit will also contain 4 x 3/16 stainless steel cable clamps. We recommend sucking the non -loop side of the cable into the pipe through the large hole in the cable winder and feeding it out the end of the pipe. Place 1 cable clamp on the end and pull back through until the cable clamp stops the cable from pulling out of the pipe. Be care- ful to place each cable clamp at the same place on each end to help the cable remain level, It is also a good idea to measure the cables once they are installed before hanging the cradle as adjustment will be MUCH easier. to be see tur cu,up"uuuiliy etude sheet included with these lifts. Appendix A y-go 4-y h 2cl oo-h )­5 � Cable winders Your flit will have pre4nstalled cable winders, note that for shiwng purposes these cable winders are not bolted to the pipe_ Your hardware pack wilt in- clude these stainless steel bolts. The stainless steel drive pipe will have pre - "led hates that should tine up. These holes mint not fine up depending on the installation and in rare cases you might have to drill a hole. The cable winders will have three holes, two smaller ones on each end and a large hole on the end closest to the front. The large hole is where you insert the end of the cable and the smaller holes are for securing the winder to the pipe. We do not recommend doing this until you have already attached the cable be- cause the bolts will get in your way. Installers Tip We recommend .not attaching the power heads to the top beams until after the top beams are completely installed and the cable is installed. This will make it easier to move or turn the pipe for adjustment. LEVEL YOUR TOP BEAMS! Un-Level top beams could cause the hoists to stream and tilt to bind Z7 'vA Top Be� ffistallation Pile Spacing 41 ,"t-7 zgU-0 '* j,4v TOP BEAM POWER UNIT 'l2'-2e OUTSIDE OF PILING TO OUTSIDE m 4 d121 691 U z 6) For 6K through 8K Lifts use a MINUMUM 8" Piling For 10-13K use a MINUMUM 10" Piling 0. Your lift will include 2 aluminum hoist FT___ mounting plates. These will remour t to the front of the beams, slots down Attaching- the cables to the. ' Your lift will have 4 pieces of pre cut and swaged cable, each cable is carefully cut to 15' each as to insure proper level. The hardware kit will also contain 4 x 3/16 stainless steel cable clamps. We recommend sucking the non -loop side of the cable into the pipe through the large hole in the cable winder and feeding it out the end of the pipe. Place 1 cable clamp on the end and pull back through until the cable clamp stops the cable from pulling out of the pipe. Be care- ful to place each cable clamp at the same place on each end to help the cable remain level, It is also a good idea to measure the cables once they are installed before hanging the cradle as adjustment will be MUCH easier. to be see tur cu,up"uuuiliy etude sheet included with these lifts. Appendix A y-go 4-y h 2cl oo-h )­5 � Cable winders Your flit will have pre4nstalled cable winders, note that for shiwng purposes these cable winders are not bolted to the pipe_ Your hardware pack wilt in- clude these stainless steel bolts. The stainless steel drive pipe will have pre - "led hates that should tine up. These holes mint not fine up depending on the installation and in rare cases you might have to drill a hole. The cable winders will have three holes, two smaller ones on each end and a large hole on the end closest to the front. The large hole is where you insert the end of the cable and the smaller holes are for securing the winder to the pipe. We do not recommend doing this until you have already attached the cable be- cause the bolts will get in your way. Installers Tip We recommend .not attaching the power heads to the top beams until after the top beams are completely installed and the cable is installed. This will make it easier to move or turn the pipe for adjustment. LEVEL YOUR TOP BEAMS! Un-Level top beams could cause the hoists to stream and tilt to bind Z7 Your.rdt will include 4 aluminum pile mount brackets, these are to be mounted on the inside of the pilings. Installers Tin: ti We find it easier to place the top beams 0 on top of the pilings then mount the brackets, that way we know they will be levels FEMA FLOOD MAP Sri, USDA Farm Service Agency, Microsoft Powered by Fsri ApptWndatt tocahon Eased - u54r input and does Hitt represent an authdTrtatnE PIFII pedpeye 13 [ Sell-drk dWp Boundary DW'W D maiahie No Djf W Data An'aiahle MAP PANELS .bl IN —pp d ® Lea of L7 -Hai F Wed H—Id Z] I EtFeote,e LWFIS Ama of UAdetem r*d Fleed Mazard z— D OdNlltlie tiotaccQa ArQa ® owtai 9arrier Re—roesystem Area OTHER AREAS 47rr nn Bax Food E*-O-IlIWQ r aa., SPECIAL FLOOD 'AAM FIFE or Depth HAZA RO AREAS Regulatory Floodxay z-. AL A4. M. Va. AA 0.29, An nual Champ FI ood Rasa rd_ Areas of lk aentfal chance flood with a —age de pl h less I han One iool ov with dra Inage areas et te.s then one square mire ,v ��� Fulute Conddtohs VW, Annual Chanra FWDd Hazard r•:,- r Arcs with Reduetd Flood Risk due to MER AREAS OF Levee. See Motes.:, 7, r FLOW RAZARp Area with Flood Rek due to Levee —: z a ZW Cross Sections w nh 1-4, Annual Cha net "•s water Surface Ele.at.on ¢ _ _ Coaszat Tranec st —_ 9ase Flood F"e tlon Line IBFE) umlt od stuoy Juradr[Mdn Btwedeq -- CoastalhanseCt B—I— OTHER _ Profileassedne FEATURES Rydrographrc feature GENERAL --- Channel. CuMertor Storm Sewer STRUCTURES n r t r r r Levee. Dike. ur Floodwa0