Loading...
HomeMy WebLinkAboutNCS000606_ROS request_20230814 f� DUKE Thomas P P. Haaf Vice President ENERGY 541Hares Nuclear Plant 3 Shearon Harris Rd New Hill NC 27562-9300 AUG Q 9 2023 Serial: RA-23-0212 "��0l11'iU,�iG, i io9r6m Certified Mail Number: 7014 2120 0003 3196 6821 Return Receipt Requested Mr, Bill Denton-Engineering Supervisor NC DEQ DEMLR Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Subject: Representative Outfall Status Request Draft NPDES Stormwater Permit NCS000606 Harris Nuclear Plant(HNP) 5413 Shearon Harris Road New Hill, NC 27562 Wake County Dear Mr. Denton: Enclosed are the Permit Owner Affiliation Designation Form and the Stormwater Delegation of Signature Authority Form (DOSA) for the Harris Nuclear Plant. Please update your records as necessary. If you have any questions regarding this matter, please do not hesitate to contact Mr. Bob Wilson, HNP Site Environmental Professional, at (984) 229-2444. Sincerely, Thomas P. Haaf Enclosure: Representative Outfall Status Request Draft NPDES Stormwater Permit NC5000606 Representative Outfall Status Request Draft NPDES Stormwater Permit NCS000606 Serial: RA-23-0212/page 2 CC: Certified Mail Number: 7014 2120 0003 3196 6838 Return Receipt Requested Thad Valentine— RRO Stormwater Program NC DEQ DEMLR Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Certified Mail Number: 7014 2120 0003 3196 6845 Return Receipt Requested Brianna Young— Industrial Program Individual Permit Coordinator DEMLR Central Office 1612 Mail Service Center Raleigh, NC 27699-1612 Representative Outfall Status Request Draft NPDES Stormwater Permit NCS000606 Serial: RA-23-0212 Enclosures Representative Outfall Status Request(ROS) Draft NPDES Stormwater Permit NCS000606 Attachment 1 (4 pages including cover) Division of Energy, Mineral & Land Resources FOR AGENCY USE ONLY Date Received ��'` Yegr Ivtanth Day �::a Stormwater Program National Pollutant Discharge Elimination System Environmental REPRESENTATIVE OUTFALL STATUS (ROS) Quality REQUEST FORNI if a facility is required to sample multiple discharge locations with very similar storm water discharges, the permittee may petition the Director for,Representative Outfall Status(ROS). DEQ may grant Representative Outfall Status if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where analytical sampling requirements apply. If Representative Outfall Status is granted, ALL outfalls are still subject to the qualitative monitoring requirements of the facility's permit—unless otherwise allowed by the permit(such as NCG0.20000)and DEQ approval. The approval letter from DEQ must be kept on site with the facility's Storm water Pollution Prevention Plan, The facility must notify DEQ in writing if any changes affect representative status. For questions, please contact the DEQ Regional Office for your area (see page 3). (Please print or type) 1) Enter the permit number to which this ROS request applies: Individual Permit (orl Certificate of Coverage N I C I s0 0 06 0 6 N C G 2) Facility Information: Owner/Facility Name Duke Energy Progress,LLC 1 Shearon Harris Nuclear Plant Facility Contact Bob Wilson Street Address 5413 Shearon Harris Road City New Hill State NC ZIP Code 27562 County Wake E-mail Address Bo6.Wilson@duke-energy.com Telephone No. 984 229-2444 Fax: 3) List the representative outfalls) information (attach additional sheets if necessary): Outfall(s) SW-003 is representative of Outfall(s) SW-002,SW-003,SW-004,and SW-005 Outfalls' drainage areas have the same or similar activities? a Yes ❑ No Outfalls' drainage areas contain the same or similar materials? X Yes ❑ No Outfalls have similar monitoring results? ❑ Yes ❑ No ® No data* Autfall(s) SW-006 is representative of Outfall(s) SW-001,SW-008,SW-007,SW-008,SW-009,and SW-8 Outfalls' drainage areas have the same or similar activities? a Yes ❑ No Outfalls' drainage areas contain the same or similar materials? a Yes ❑ No Outfalis have similar monitoring results? ❑ Yes ❑ No is No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? ❑Yes ❑ No Outfalls' drainage areas contain the same or similar materials? ❑Yes ❑ No Outfalls have similar monitoring results? ❑ Yes ❑ No o No data* *Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. Page 1 of 3 SWU-ROS-2009 Last revised 12/30/2009 Representative Outfall Status Request 4) Detailed explanation about why the outfalls above should be granted Representative Status: (Or,attach a letter or narrative to discuss this information.) For example,describe how activities and/or materials are similar. Please see Attachment 1 for more detailed explanation. 5) Certification: North Carolina General Statute 143-21S.6 B(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application, record, report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the[Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). 1 hereby request Representative Outfall Status for my NPDES Permit. I understand that ALL outfalls are still subject to the qualitative monitoring requirements of the permit,unless otherwise allowed by the permit and regional office approval. I must notify DEQ in writing if any changes to the facility or its operations take place after ROS is granted that may affect this status. If ROS no longer applies, I understand I must resume monitoring of all outfalls as specified in my NPDES permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete,and accurate. Printed Name of Person Signing: Them-P.Haaf Title: Vice President-Harris V ar Plant00, 9- 1.45 (Signature of Applicant) (Date Signed) Please note: This application for Representative Outfall Status is subject to approval by the NCDEQ Regional Office. The Regional Office may inspect your facility for compliance with the conditions of the permit prior to that approval. Final Checklist for ROS Request This application should include the following items: ❑ This completed form. ❑ Letter or narrative elaborating on the reasons why specified outfalls should be granted representative status,unless all information can be included in Question 4. ❑ Two(2)copies of a site map of the facility with the location of all outfalls clearly marked, including the drainage areas,industrial activities,and raw materials/finished products within each drainage area. ❑ Summary of results from monitoring conducted at the outfalls listed in Question 3. ❑ Any other supporting documentation. Page 2 of 3 SWU-ROS-2009 Last revised 12/30/2009 Representative Outfall Status Request Mail the entire package to: NCDEQ DEMLR at the appropriate Regional Office (See map and addresses below) Notes The submission of this document does not guarantee Representative Outfall Status (ROS) will be granted as requested. Analytical monitoring as per your current permit must be continued, at all outfalls, until written approval of this request is granted by DEQ. Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. For questions, please contact the DEQ Regional Office for your area. Win da ie r ie y try ngrcn Asheville Regional Office 2090 U.S. Highway 70 Swannanaa, NC 28778 Washington Regional Office 943 Washington Square Mall Phone (828) 296-4500 Washington, NC 27889 FAX (828) 299-7043 Phone (252) 946-6481 Fayetteville Regional Office FAX (252) 975-3716 Systel Building, 225 Green St., Suite 714 Wilmington Regional Office Fayetteville, NC 28301-5094 127 Cardinal Drive Extension Phone (910) 433-3300 Wilmington, NC 28405 FAX 9101486-0707 Phone (910) 796-7215 Mooresville Regional Office FAX {910} 350-2004 610 East Center Ave. Winston-Salem Regional Office Mooresville, NC 28115 585 Waughtown Street Winston-Salem, NC 27107 Phone (704) 663-1699 Phone (336) 771-5000 FAX (704) 663-6040 Water Quality Main FAX (336) 771-4630 Raleigh Regional Office Central Office 1628 Mail Service Center 1612 Mail Service Center Raleigh, NC 27699-1628 Raleigh, NC 27699-1612 Phone (919) 791-4200 Phone (919) 807-6300 FAX (919) 571-4718 FAX (919) 807-6494 Page 3 of 3 5WU-ROS-2009 Last revised 12/30/2009 Representative Outfall Status Request Draft NPDES Stormwater Permit NCS000606 Serial: RA-23-0212 Enclosures Representative Outfall Status Request(ROS) Draft NPDES Stormwater Permit NCS000606 (4 pages including cover) Duke Energy requests that the ROS be reviewed and acted upon prior to issuance of the new permit. NC DEQ has historically allowed ROS at SW-003 and SW-006 at the HNP for the wastewater NPDES permit (NC0039586). Table 1. Summary of ROS Request Outfall Represents SW-003 SW-002,SW-003,SW-004,SW-005 SW-006 SW-001,SW-006, SW-008,SW-009,SW-B Figure 1. Existing Outfolls at the Harris Nuclear Plant 7- Figure 2. Proposed ROS at the Harris Nuclear Plant -r a� lof3 SW-003 Representative Status for SW-002 SW-003 SW-004 and SW-005 Duke Energy is requesting that representative outfall status where SW-003 will represent outfalls SW- 003, SW-002, SW-004, and SW-005. SW-003 was chosen for monitoring because it has the most potential to capture pollutants from a potential release as it has the most industrial activities of all the represented outfalls. Each industrial activity in the other drainage areas is also performed in SW-003 (see Table 2). Table 2. Industrial Activities Performed in Each Drainage Area industrial Activity 11 11 11' 11 Vehicle and equipment parking Occasional non-SW discharges d d VO Above/below ground storage and associated I loading/unloading -transformer operation Cooling tower operation VO l Sewage lift stations' V0 Indoor chemical and equipment storage i r/ I E_aydown storage area Note 1: Duke Energy is requesting removal of parameters associated with sewage lift stations as part of the permit issuance as they are covered under wastewater NPDES Permit NCO039586 and HNP employs robust spill response procedures aimed at ensuring environmental compliance and protection of employees, public health, and the environment Nate 2:The lay down storage area in Drainage Area S (SW-005)is temporary due to construction and will no longer be utilized for outdoor storage when construction is completed.Construction is scheduled to be completed by December 1, 2023. 2of3 SW-006 Representative Status for SW-001, SW-006, SW-008, SW-009, SW-B Duke Energy is requesting that representative outfall status where SW-006 will represent outfalls SW- 006, SW-001, SW-008, SW-009, and SW-B. SW-006 was chosen for monitoring because it has the most potential to capture pollutants from a potential release as it has the most industrial activities of all the represented outfalls. Each industrial activity in the other drainage areas is also performed in SW-006 (see Table 3). Table 3. Industrial Activities Performed in Each Drainage Area Laydown storage area' YO Occasional non-SW discharges Indoor chemical and equipment storage VO Transformer operation Above/below ground j storage/emergency power generation i V and associated loading/unloading Vehicle and equipment parking Sewage lift stations' -- � - � ------..____ - _ -- .---------__-- Recycling, compacting, general refuse handling Fueling Drinking water treatment i Bulk storage of sand, gravel, and crushed stone' Note 1: Duke Energy is requesting removal of parameters associated with sewage lift stations as part of the permit issuance as they are covered under wastewater NPDES Permit NCO039586 and HNP employs robust spill response procedures aimed at ensuring environmental compliance and protection of employees, public health, and the environment. Note 2: Duke Energy is willing to submit a lay down area consolidation plan by March 31, 2024, to facilitate ROS.The lay down area consolidation plan would include a proposal for consolidating outdoor storage areas that can be moved and cover of those that cannot. Minimizing exposure of bulk storage areas will be discussed in the lay down area consolidation plan as well. 3of3