Loading...
HomeMy WebLinkAboutWQ0002284_More Information (Received)_198907246,6�t-6) DIVISION OF ENVIRONMENTAL MANAGEMENT July 24, 1989 MRMORANDUM TO: Carolyn McCaskill, Supervisor State Engineering Review Unit Permits and Engineering Branch THROUGH: Roger K. Thorpe, er Quality Supervisor Washington Regional Office FROM: Alton R. Hodge, Environmenta Engineer Water Quality Section Washington Regional Office 40�4 SUBJECT: Kinnakeet Shores WWTP 220,000 gpd Proposed Expansion Dare County Kinnakeet Shores Partners have submitted a revised request to expand from the Existing 50,000 gpd WWTP system to a 200,000 gpd WWTF system. This proposal meets all the Division's regulations, per my review, with the exception of 02H .0205(d)(10)(c). The hydrogeoiooi:• study called for and received for this project, does not address groundwater quality adequately. However, I am unaware of any hydrogeologic study -1:o date that has been adequately in this regard. It is my opinion that this high density rapid rate infiltration system, given the distance to the perimeter of compliance, and therefore, the small amount of dilution, will be unable to maintain groundwater quality standards. The treatment facility is not designed to treat the ia<..s .ewater to the degree necessary to maintain groundwater standards even dUo-;igh it complies with all existing treatment regulations. In that the proposal meets all the current regulations, the Division has no alternative but to grant the permit request. However, the Division should begin to require monitoring to allow the Groundwater Section to prepare a groundwater quality predictive model. A predictive model would allow a more scientific placement of these systems and other non -discharge systems. Mr. Bill Reid, of the Groundwater Section, is the person to address this type of monitoring. Kinnakeet Shores Property is such that the tightly packed disposal system allows for maximum development and in the event the wastewater treatment system fails to maintain groundwater quality standards, the disposal system cannot be dispersed. The applicant should be made aware that the only solution in the event of failure is additional -treatment and with the small allowable concentrations this opposition will be very expensive. ARH:ekw , I �—�— — yti n�rf � ....�y wy�— .;, , • �'_w `� tar `. t.t 7• j —y _—�iGLiCL•SE�� s F) 04,15 Gpu WR T- L jIt t. ^FAM_- r-V7. Cr �r _ _ t j K t].C+G t iwOC.Ct7 RU7�F°` uttY n,y�l,4 R� r`n�}t1 !'._ ONTO. L C-9 POW Or-1'`,t7iXINEU rr+ SDE t t 1 5 ��— ttt � LET it. ivcu-4 MONITER WELL (T _ �j-::•• _;,�i,,, £ 1-174' use �—,-- % - 1 r F --_ :i• 1 I 1 _ a I PROPOSED KINNAKEET WWTP SITE 6/5/89 a LAI-E } M, ACT NE TIC, CLA �1205 MUS i -O.MID CPID WIVTP JE4157mv auaaa UPO 1w.-TP \C:A Ile 0 )X CENTER L 6 no 10 '11 0100.00 ROTARY lau wS MOM (4- R �b) Ca""! IN I'L 'o 25 P IVALL. SIDE ! LOT ta4t,4Tr7. 550,121 PY, USE Es MONITER WELL (Typ.) Z, E V 4' PY 711 E0.00 7,j -3 a 61-06, 9 Y Engineers, architects, planners, surveyors, environmental specialists & construction managers. June 19, 1989 Mr. A. R. Hodge NC Department of Natural Resources and Community Development Water Quality Section Division of Environmental Management Post Office Box 1507 Washington, North Carolina 27889 Re: Kinnakeet Shores, Phase 2 Wastewater Treatment Plant Revisions Dear Alton: As agreed at the May 22, 1989, meeting at your office, and follow up letter to you from Mark S. Bissell of the same date, we are pleased to submit the following updated information for your review and approval: 1. Calculations and groundwater model were developed by Edwin E. Andrews, the project's hydrogeological consultant, for the revised site plan configuration. This revised model was based on the revised plant site plan shown on Sheet 2A of 13, dated 6/9/89. The revised model data is attached to this letter for your information, consisting of six (6) pages. According to Mr. Andrews the first page indicates that the minimum height of the mound must be 3.0 feet above the water table. Field survey established the water table elevation at the existing lake some 200 feet south of the proposed pond. The proposed pond is designed to receive runoff from the wastewater treatment plant line sink, and is anticipated to have a seasonal pool surface elevation of 3.3. From the attached hydrogeological model evaluation, the minimum mound height elevation of the Kinnakeet Wastewater Treatment Plant rotary distribution bed is elevation 6.3 (3.0 + 3.3 = 6.3). The rotary distribution bed elevation is shown on the revised plan sheets to be at elevation 8.5, just as shown on the initial plant design submittal, or 2.2 feet above the minimum bed elevation. Surveying Division Bissell Associates, Inc. Currituck Branch Office No. 5 Welch St. P.O. Box 253 4112 North Croatan Hwy, Drawer 1068 Highway 168, P.O. Box 657 Kitty Hawk, North Carolina 27949 Kitty Hawk, North Carolina 27949 Moyock, North Carolina 27958 919/261-3225 Fax 919/261-4177 919/261-3266 Fax 919/261-1760 919/435-2555 Fax 919/435-6852 Three (3) sets of revised plans and specifications are included for your review and approval. You will note that the original hydrogeological information is still a part of the specifications for your information, with the revised, updated model data also provided. 2. We believe the revised plans and specifications enclosed address all of the items discussed in the previously referenced letter of May 22, 1989. We appreciate your cooperation and assistance on this project and will appreciate your review and approval on the submittal as soon as possible. As we discussed, your issuance of a permit to the Kinnakeet Partnership is of critical importance. Should you have questions during your review please contact us immediately and we will make every effort to assist you. Yours truly, BISSELL ASSOCIATES P. Phillip Shu, P.E. Director of Engineering cc: Ed Andrews Bill Gilbert Bill Reid Rudy Smithwick Kinnakeet Shores Partnership BAS IN 7 2 3 .3 — T R E TIME DISTANCE HEIGHT (DRYS) (FT) (FT) 40 3@@ 1 PRESS RETURN TO CONTINUE? ■ . SEAL a DI RECHARGE RATE TTHANSM I SS W I T Y SPECIFIC YIELD BEGINNING TIME FINAL TIME TIME INCREMENT TIME OF CUT OFF BEGINNING DISTANCE FINAL DISTANCE D IS°I'RNCE INCREMENT DEPTH IDiTH LENGTH ANGLE STREAM D I TRNCE _ FOUND PROFILE STREAM DISCHARGE .94 350 PRESS RETURN TO CONTINUE ■ FT/DRY SO. FT DRY Re&HARGE RATE = 94. FT/DAY TRANSMISSIVITY = 3500 SQ.FT/DAY SPECIFIC YIELD = .21 BEGINNING TIME = 5 DAYS FINAL TIME = 40 DAYS TIME INCREMENT = 5 DAYS TIME OF CUT OFF = 40 DAYS BEGINNING DISTANCE = 0 FT FINAL DISTANCE = 300 FT DISTANCE INCREMENT = 50 FT DEPTH = 6.5 FT WIDTH = 177 FT LENGTH = 178 FT ANGLE = 0 DEGREES STREAM DISTANCE = 200 FEET MOUND PROFILE YES STREAM DISCHARGE YES TIME DISTANCE HEIGHT (DAYS) (FT) (FT) 5 0 2.239 5 50 1.955 5 50 2.166 5 100 1.291 5 100 1.638 5 150 0.605 5 150 1.203 5 200 0.000 5 200 0.903 5 250 0.686 5 300 0.616 10 0 2.371 10 50 2.058 10 50 2.325 10 100 1.362 10 100 1.907 10 150 0.641 10 150 1.490 10 200 0.000 10 200 1.199 10 250 0.983 10 300 0.816 15 0 2.420 15 50 2.095 15 50 2.384 15 100 1.387 15 100 1.976 15 150 0.653 15 150 1.567 15 200 0.000 15 200 1.282 15 250 1.072 15 300 0.909 20 0 2.445 20 50 .2.114 20 50 2.414 20 100 1.400 20 100 2.011 20 150 0.660 20 150 1.607 20 200 0.000 20 200 1.327 20 250 1.121 20 300 0.961 0 SAVa 01 A'Va/'14 OIRnO VO+3P96ti0' z+ = 39d`dHDSIa 7b'101 0'o 0000•0 91PI l'L £000'0 30L 6'9 oz00°0 t-S£ S•lz 1900.0 LLL Vti£ 8600.0 68 9°6£ £110'0 kv t,•It, 8110.0 0 Lti0' 00z' 66£' 000' zL9' OL9' L90' 61-P z9ty' £VL £8v ti£0' 881' 68£' 000° z99' 999' 6S0' 91t,' 99P, 6£1' LLt, L10'1 £L1'L SL£'1 000• 099'1 999' 8tio•z £Lti'l 9tlt,' z ££1'z 0Lv'z 966'0 z9l'L Sss'L 000'0 ££9'1 t,99' 0 ££0•z sot►•! ££v'z 9z1'z 0 9 k z SAba (AVa/•1J'�iS) z z z 1 I L 0 L 0 z l z z 0 0 (1�) (1d) HION37 100� 1 wlv3d1S imn 1b' ON07b /3Jd`dHOSIa GV3H 30N`d1SIa wv3diS 01 30dvH0SIa 1 0o£ 1 Osz 1 ooz 0 ooz 1 OS1 0 091 z 001 L 001 0s 0s 0 o0£ OSz ooz ooz 091 091 001 001 os 0!;z 0 00£ osz ooz ooz 091 0S1 001 001 OS 0s 0 00£ osz sz 0J 0v O t, 0 t0 t, 0 t, 0 to 0 t' 0f 0V 0V S£ S£ S£ s£ S£ S£ S£ S£ s£ S£ s£ 0£ 0£ 0£ 0£ 0£ D£ 0£ 0£ 0£ 0£ 0£ Sz sz Sz Sz Sz sz Sz z z z 44 0.0120 42.0 89., 0.0105 36.9 4`'177 0.0068 23.9 354 0.0025 8.9 708 0.0000 0.0 TOTAL'DISCHARGE _ +2.16096E+04 CUBIC FT./DAY 15 DAYS 0 0.0128 44.9 44 0.0123 42.9 89 0.0108 37.7 177 0.0071 24.7 354 0.0027 9.6 708 0.0006 2.3 1416 0.0000 0.0 TOTAL DISCHARGE = +2.48766E+04 CUBIC FT./DAY 20 DAYS 0 0.0129 45.3 44 _. 0.0124 43.4 - 89 0.0109 38..2 177 0.0072 25.2 w. 354 0.0029 10.0 708 0.0007 2.6 1416 0.0000 0.1 2832 0.0000 0.0 TOTAL DISCHARGE _ +2.58534E+04 CUBIC FT./DAY 25 DAYS 0 0.0130 45.6 44 0.0125 43.6 .89 0.0110 -38.4 177 0.0073 25.4 354 0.0029 10.3 708 0.0008 2.8 1416 0.0001 0.3 2832 0.0000 0.0 TOTAL DISCHARGE = +2.67631E+04 CUBIC FT./DAY 30 DAYS 0 0.0131 45.8 44 0.0125 43.8 89 0.0110 38.6 177 0.0073 25.6 354 0.0030 10.4 708 0.0008 2.9 1416 0.0001 0.4 2832 0.0000 0.0 TOTAL DISCHARGE = +2.74076E+04 CUBIC FT./DAY 35 DAYS 0 0.0131 45.9 44 0.0126 44.0 89 0.0111 38.8 77 0.0074 25.7 354 0.0030 10.6 708 0.0009 3.0 1416 0.0000 0.0 TOTAL DISCHARGE _ +2.67028E+04 CUBIC FT./DAY 40 DAYS 0 0.0131 46.0 44 0.0126 44.1 89 0.0111 38.9 177 0.0074 25.8 354 0.0030 10.7 708 0.0009 3.1 1416 0.0001 0.2 2832 0.0000 0.0 TOTAL DISCHARGE _ +2.73125E+04 CUBIC FT./DAY BAS IN 7 2 0 0 .3 3001 1 1 1 _,__o I TIME BISTRNCE 40 . 300 !?'BESS BETURN TO CONTINUE. �ea�eeEti®o�e,e,sa�, . 0 SEAL tL- ADD°° HEIGHT (FT) I RECHARGE RATE _ TRRNSMISSIUITY SPECIFIC YIELD _ BEGINNING TIME FINAL TIME _ TIME INCREMENT = TIME OF CUT OFF = INNING D I S TRN CE _ FINAL DISTANCE _ TRNCE INCREMENT = DEPTH = WIDTH = LENGTH _ ANGLE _ STREAM DISTANCE - MOUND PROFILE STREAM DISCHARGE DAYS DAYS DAYS DAYS FT FT FT FT FT FT EiGREE FEET PRESS RETURN TO CONTINUE ■ RECHARGE RATE = 94 FT/DAY TRAWSMISSIVITY = 3500 SQ.FT/DAY SPECIFIC YIELD = .21 BEGINNING TIME = 5 DAYS FINAL TIME = 40 DAYS TIME INCREMENT = 5 DAYS TIME OF CUT OFF = 40 DAYS BEGINNING DISTANCE = 0 FT FINAL DISTANCE = 300 FT DISTANCE INCREMENT = 50 FT DEPTH = 6.5 FT WIDTH = 177 FT LENGTH = 178 FT ANGLE = 0 DEGREES STREAM DISTANCE = 200 FEET MOUND PROFILE YES STREAM DISCHARGE YES TIME DISTANCE HEIGHT (DAYS) (FT) (FT) 5 0 2.239 5 50 1.955 5 50 2.166 5 100 1.291 5 100 1.638 5 150 0.605 5 150 1.203 200 0000 5 200 0.903 5 250 0.686 5 300 0.616 10 0 2.371 10 50 2.058 10 50 2.325 10 100 1.362 10 100 1.907 10 150 0.641 10 150 1.490 10 200 0.000 10 200 1.199. 10 250 0.923 10 300 0.816 15 0 2.420 15 50 2.095 :. 15 50 '2.384 15 100 1.387 15 100 1.976 15 150 0.653 15 150 1.567 15 200 0.000 15 200 1.282 15 250 1.072 15 300 0.-909 20 0 2.445 20 50 .2.114 20 50 2.414 20 100 1.400 20 100 2.011 20 150 0.660 20 150 1.607 20 200 0.000 20 200 1.327 20 250 1.121 20 300 Q.961 ... 0 50 50 100 100 150 150 200 200 250 300 0 50 50 100 100 150 150 200 200 250 300 0 50 50 100 100 150 150 200 200 250 300 0 50 50 100 100 150 150 200 200 250 300 DISCHARGE TO STREAM 2.460 2.126 2.433 1.408 2.033 0.664 1.633 0.000 1.355 1.152 0.995 2.470 2.133 2.446 1.413 2.048 0.666 1.650 0.000 1.375 1. 173 1.017 2.477 2.139 2.455 1.416 2.059 0.668 1.662 0.000 1.389 1.188 t 034 2:483 2.143 2.462 1.419 2.067 0.670 1.672 0.000 1.399 1.200 1.047 DISTANCE HEAD DISCHARGE/ ALONG AT UNIT STREAM 1 FOOT LENGTH (FT) (FT) (S2.FT./DAY% 5 DAYS 0 0.0118 41.4 44 0.0113 39.5 89 0.0098 34.4 177 0.0061 21.5 354 0.0020 6.9 708 0.0003 1.1 1416 0.0000 0.0 TOTAL DISCHARGE _ +2.04964E+04 CUBIC FT./DAY 10 DAYS 44 0.0120 42.0 89 0.0105 36.9 177 0.0068 23.9 '354 0.0025 8.9 708 0.0000 0.0 TOTAL DISCHARGE _ +2.16096E+04 CUBIC FT./DAY 15 DAYS 0 0.0128 44.9 44 0.0123 42.9 89 0.0108 37.7 177 0.0071 24.7 354 0.0027 9.6 708 0.0006 2.3 1416 0.0000 0.0 TOTAL DISCHARGE _ +2.48766E+04 CUBIC FT./DAY 20 DAYS _ 0 0 .012 9:_:= ,, _.,r 45.3 :: 44 0.0124 43.4 89 -A . 0 10 9 38_. 2 -177 0.0072 25.2 _.., ._ 354 0.0029 10.0 708 0.0007 2.6 1416 '0 0.1 _ _2832 0.0000 0.0 TOTAL DISCHARGE _ +2.58534E+04 CUBIC FT./DAY 25 -`DAYS 0 0.0130 45.6 44 0.0125 43.6 89 0.0110 =38.4 177 0.0073 -25.4 354 0.0029 10.3 - 708 0.0008 2.8 1416 0.0001 0.3 2832 0.0000 0.0 TOTAL DISCHARGE _ +2.67631E+04 CUBIC FT./DAY 30 DAYS 0 0.0131 45.8 44 0.0125 43.8 89 0.0110 38.6 177 0.0073 25.6 354 0.0030 10.4 708 0.0008 2.9 1416 0.0001 0.4 2832 0.0000 0.0 TOTAL DISCHARGE = +2.74076E+04 CUBIC FT./DAY 35 DAYS 0 0.0131 45.9 44 0.0126 44.0 89 0.0111 38.8 177 0.0074 25.7 '354 0.0030 10.6 708 0.0009 3.0 1416 0.0000 0.0 TOTAL DISCHARGE = +2.67028E+04 CUBIC FT./DAY 40 DAYS 0 0.0131 46.0 44 0.0126. 44.1 89 0.0111 38.9 177 0.0074 25.8 354 0.0030 10.7 708 0.0009 3.1 1416 0.0001 0.2 2832 0.0000 0.0 TOTAL DISCHARGE = +2.73125E+04 CUBIC FT./DAY 9 BASIN 7 i� S T R E H TIME DISTANCE. HEIGHT (DAYS) (FT) (FT) 40 2-100 1 PRESS RETURN TO CONTINUE? g SEAL m a U) H �EEEIH MM2041-4 zp-4zxl-4 MOM nzt-I MM bozo =C:D MMZ (OlEd-P-1 01-41-40 dzzomo z II II II II II II II II II II II II II II II H z mmhjGl-&l-LlmulwGlArlALrl- WE ® tv m w u m m m Ht mm tz RECHARGE RATE = 94. FT/DAY �TRANSMISSIVITY = 3500 SQ.FT/DAY SPECIFIC YIELD = .21 BEGINNING TIME = 5 DAYS FINAL TIME = 40 DAYS TIME INCREMENT = 5 DAYS TIME OF CUT OFF = 40 DAYS BEGINNING DISTANCE = 0 FT FINAL DISTANCE = 300 FT DISTANCE INCREMENT = 50 FT DEPTH = 6.5 FT WIDTH = 177 FT LENGTH = 178 FT ANGLE = 0 DEGREES STREAM DISTANCE = 200 FEET MOUND PROFILE YES STREAM DISCHARGE YES TIME DISTANCE HEIGHT (DAYS) (FT) (FT) 5 0 2.239 5 50 1.955 5 50 2.166 5 100 1.291 5 100 1.638 5 150 0.605 5 150 1.203 5 200 0.000 5 200 0.903 5 250 0.686 5 300 0.616 10 0 2.371 10 50 2.058 10 50 2.325 10 100 1.362 10 100 1.907 10 150 0.641 10 150 1.490 10 200 0.000 10 200 1.199 10 250 0.983 10 300 0.816 15 0 2.420 15 50 2.095 _. 15 50 2.384 15 100 1.387 15 100 1.976 15 150 0.653 15 150 1.567 15 200 0.000 15 200 1.282 15 250 1.072 15 300 0.909 20 0 2.445 20 50 .2.114 20 50 2.414 20 100 1.400 20 100 2.011 20 150 0.660 20 150 1.607 20 200 0.000 20 200 1.327 20 250 1.121 20 300 0,961 25 0 2.460 25 50 2.126 25 50 2.433 2 100 1.408 25 100 2.033 25 150 0.664 25 -150 1.633 25 200 0.000 25 200 1.355 25 250 1.152 25 300 0.995 30 0 2.470 30 50 -2.133 30 50 2.446 30 100 1.413 30 100 2.048 30 150 0.666 30 150 1.650 30 200 0.000 30 200 1.375 30 250 1.173 30 300 1.017 35 0 2.477 35 50 . 2. 139 35 50 2.455 35 100 1.416 35 100 2.059 35 150 0.668 35 150 1.662 35 200 0.000 35 200 1.389 35 250 1.188 35 300 1.034 40 0 2.483 40_ 50 2.143 40 50 2.462 40 100 1.419 40 100 2.067 40 150 0.670 40 150 1.672 40 200 0.000 40 200 1.399 40 250 1.200 40 300 1.047 DISCHARGE TO STREAM DISTANCE HEAD DISCHARGE/ ALONG AT UNIT STREAM 1 FOOT LENGTH (FT) (FT) (SQ.FT./DAY) 5 DAYS 0 0.0118 41.4 44 0.0113 39.5 89 0.0098 34.4 177 0.0061 21.5 354 0.0020 6:9 708 0.0003 1.1 1416 0.0000 0.0 TOTAL DISCHARGE = +2.04964E+04 CUBIC FT./DAY 10 DAYS 44 0.0120 42.0 89 0.0105 36.9 177 0.0068 23.9 ;. 354 0.0025 8.9 708 0.0000 0.0 TOTAL DISCHARGE _ +2.16096E+04 CUBIC FT./DAY.: 15 DAYS 0 0.0128 44.9 44 .-..0.0123 42.9 89 0.01.08 37.7 177 0.0071 24.7 354 0.0027 9.6 708 0.0006 2.3 1416 0.0000 0.0 TOTAL DISCHARGE _ +2.48766E+04 CUBIC FT./DAY 20 DAYS J 0 _.0-.0129 45.3 --44-�0.0124 43.4 89 0.0109 38-. 2 177 0.0072 25.2 354 0.0029 10.0 :{ 708 " 0.0007 2.6 1416 '-------0.0000 _----- , 0. 1 :.:2832 0.0000 :0.0` TOTAL DISCHARGE _ +2.58534E+04 CUBIC FT./DAY 25 DAYS 0 0.0130 45.6 44 0.0125 -_43.6 - 89 ":. 0.0110 _:38.4 - 177 0.0073 :. _ 25.4 354 0.0029:__ _. :.10.3 708 0.0008 2.8 1416 0.0001 0.3 2832 0.0000 0.0 TOTAL DISCHARGE _ +2.67631E+04 CUBIC FT./DAY 30 DAYS 0 0.0131 45.8 44 0.0125 43.8 89 0.0110 38.6 177 0.0073 25.6 354 0.0030 10.4 708 0.0008 2.9 1416 0.0001 0.4 2832 0.0000 0.0 TOTAL DISCHARGE = +2.74076E+04 CUBIC FT./DAY 35 DAYS 0 0.0131 45.9 44 0.0126 44.0 89 0.0111 38.8 177 0.0074 25.7 -Y354 0.0030 10.6 708 0.0009 3.0 1416 0.0000 0.0 TOTAL DISCHARGE = +2.67028E+04 CUBIC FT./DAY 40 DAYS 0 0.0131 46.0 44 0.0126 44.1 89 0.0111 38.9 177 0.0074 25.8 354 0.0030 10.7 708 0.0009 3.1 1416 0.0001 0.2 2832 0.0000 0.0 TOTAL DISCHARGE = +2.73125E+04 CUBIC FT./DAY