Loading...
HomeMy WebLinkAbout20130918 Ver 6_Approval Letter_20150721��� ���� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 2l, 2015 Mr. Colin Mellor, Group Leader Project Development and Environmental Analysis North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1598 Donald R. van der Vaart Secretary Subject: Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act for proposed Greensboro Eastern Loop from US 70 Relocation to SR 2303 (Lawndale Drive), Guilford County, Division 7. WBS Element No 34821.1.1, TIP Nos. U-2525B and U-2525C. NCDWR Project No. 20130918 ver.6. Dear Mr. Hancock: Attached hereto is a modification of Certification No. 3978 (ver. Transportation (NCDOT) originally dated February 6, 2014 (ver. 2014 (ver. 2), October 15, 2014 (ver. 3), December 1 l, 2014 (ver If we can be of further assistance, do not hesitate to contact us. Attachments 6) issued to The North Carolina Department of 1) with subsequent modifications dated June 24, . 4) and March 18, 2015 (ver. 5.) Sincerely, �6 , S. Zimmerm n, Director Division of Water Resources Electronic copy only distribution: Dave Bailey, US Army Corps of Engineers, Raleigh Field Office Jerry Parker, Division 7 Environmental Officer Carla Dagnino, NC Department of Transportation Dr. Cynthia Van Der Wiele, US Environmental Protection Agency Gary Jordan, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resources Commission Jason Eliiott, NCDOT, Natural Environment Section Beth Harmon, Ecosystem Enhancement Program Dave Wanucha, NC Division of Water Resources Winston Salem Regional Office File Copy 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer• Moditication to the 40l Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act THIS CERTIFTCATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Resources (NCDWR) Regulations in 15 NCAC 2H .0500. This certification authorizes the NCDOT to impact an additiona1314 feet of jurisdictional streams in Guilford County. The project shall be constructed pursuant to the modification dated June 26,�2015 and additional electronic information received on July 7, 2015. The authorized impacts are as described below: Stream Im acts in the Ca e Fear River Basin Permanent Fill in Perennial Stream New Stream (linear ft) Temporary Fill in Impacts Site Perennial Stream Requiring (linear ft) Mitigation Bank (linear ft) Fill Stabilization Original approved impacts at 212 97 29 - Site 10 New impacts with this approval at _ +35 -14 35 Site 10 Site l0 Sub Total 212 132 15 - Original approved impacts at 236 - 29 - Site 20A New impacts with this approval at _ �9 -29 79 Site 20A Site 20A Sub Total 236 79 0 - Original approved impacts at , 191 21 27 - Site 31 New impacts with this approval at +2g6 - - 286 Site 31 Site 31 Sub Total 477 21 27 - Original approved impacts at 151 28 25 - Site 32A New impacts with this approval at +2g _28 _ 0 Site 32A—pipe extension Site 32A Sub Total 179 0 25 , -� Revised Totals t,104 232 67 400* Total Stream Impacts for Moditication: 428 feet permanent impacts; 15 feet temporary impacts. *Only 3141inear feet ojpermanent impacts will require mitigation because the US Army Corps of Engineers (USACE) requires a 2:1 mitigation ratio for 3141inear feet (at Sites 31 and 32A). As such, this supersedes NCDWR's mitigation requirements for 400 linear feet at 1:1, thereby providing greater benefit. The application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will-not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your modified application dated June 26, 2015 and subsequent information received via email correspondences dated July 7, 2015. All the authorized activities and conditions of certification associated with the original Water Quality Certification dated February 6, 2014 and subsequent modifications dated June 24, 2014, October 15, 2014, December 1.1, 2014 and March 18; 2015 still apply, except where superseded by this certification. Should your project change, you are required to notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certifcation and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future)'exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 02B .0268. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. , Condition(s) of Certification: 1. This modification is applicable only to the additional proposed activities as outlined above. All of the authorized activities and conditions of certification associated with the original Water Quality Certification dated February 6, 2014 and subsequent modifications dated June 24, 2014, October 15, 2014, December ? 1, 20? 4 and i�larch 18, 2015 still app�y �:}�cept where supereded b;� this certification. 2. Com�pznsatory mitigation far 3141inear feet af impact to streams is requirz�. We understa�id that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Division of Mitigation Service (DMS) (formerly NCEEP), and that the DMS has agreed to implement the mitigation for the project. The DMS has indicated in a letter dated June 16, 2015 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with the DMS Mitigation Banking Instrument signed July 28, 2010. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federa1404 and/or Coastal Area Management Act Permit. �This Certification shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for o�cial state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-431-3000, Facsimile: (919)-431-3100 A copy of the petition must also be served on DENR as follows: Mr. Sam Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This the 21 st day of July 2015 DIVISION OF WATER RESOURCES � � S. Jay Zimmerman, irector Division of Water Resources WQC No. 3978 ��� ���� NCDENR � North Carolina Department of Environment and Natural Resources Pat McCrory Governor IvCDWR Project No.: Applicant: Project IVame: _ Date of Issuance of 401 Water Quality CertiCcation: County: Donald van tler Vaart Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. [t is not necessary to send certificates from all of these. Applicant's Certification l, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification [, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer in the State ofNorth Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer