HomeMy WebLinkAboutNCG210168_DMR Upload Review_20230816 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 8/8/2023 9:07:47 AM(DMR Submittal)
Submit by Brittany.Cook 8/16/2023 10:50:48 AM(DMR Submittal Review)
• The task was assigned to DEMLR SW Admin for DMRs 8/8/2023 9:07:48 AM
• Brittany.Cook assigned the task to Brittany.Cook 8/16/2023 10:47:05 AM
[rftDQ
DMR Submittal from 8/8/2023
Permit and Facility Information:
..............................................................................................................................................
Permit Number* Enter COC or Individual Permit Number
NCG210168
Must begin with NCS or NCG
Facility Name:* Dudley Plywood Plant
Owner/Operator Georgia Pacific Wood Products LLC
Name:*
County:* Wayne
Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the
Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS
information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments.
Reason for not yet If applicable:
reporting data Submitted Feb 2023
through eDMR for
this permit:
Monitoring Period Information:
..............................................................................................................................................................................................................................................................................................................................................................................................
Monitoring Period What is the YEAR of the sample date(s)?
Year:* 2023
DMR Upload* Click the upload button or drag and drop files here to attach document.
DMR signed.pdf 871.12KB
Only PDFs are accepted.
Comments: Lab results were received on July 25,2023.Outfall 002 exceeded benchmark
parameter for TSS.Tier One response actions have begun.Stormwater
investigation was performed on 8/2/2023 and documentation filed with the SWPPP.
Initial actions include adding haybales to the edge of the roadway that is closest to
the ditch leading to the outfall,adding rip rap to ditch,and performing qualitative
analysis for the 3 inlets to the ditch area to identify if further BMP's are needed.This
letter and attached DMR will serve as the exceedance notification per Table 3 in
Condition E-6.
* VA By checking the box and signing box below, I certify that:
• I have given true,accurate,and complete information on this form;
• I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66,
Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same
way as a written signature;AND
o I intend to electronically sign and submit this DMR Upload form.
Full Name:* Elizabeth Meyer
Name of person submitting this form
Email Address:* elizabeth.meyer1 @gapac.com
Phone Number:* 9105477080
Signature: �yy
Date:* 08/08/2023
Review
Review Date: 08/16/2023
Confirm Permit No.* Correct the permit ID number if needed.
NCG210168
Confirm DMR Year* 2023
Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above.
Can submittal be Yes
accepted?* No(Explain why below)
Do Central Office No
staff need to be Yes
alerted?*
Do Regional Office No
staff need to be Yes
alerted?
Type of Permit* General
Ensures DMR(s)filed correctly.