Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019-02355 NWP 29 and 18 Tearsheet.pdf
U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-02355 County:Wake U.S.G.S. Quad:NC-Green Level GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Lennar Corporation Attn: Stephen Dorn Address: 1100 Perimeter Park Drive,Suite 112 Morrisville,NC 27560 E-mail: stephen.dorn(a,lennar.com Size(acres) —29.48 Nearest Town Cary Nearest Waterway UT to Morris Branch River Basin Cape Fear USGS HUC 03030002 Coordinates 35.826847, -78.878595 Location description: The proiect area is located on the west side of NC Highway 55,approximately 0.1 mile north of its intersection with Carpenter Fire Station Road,in Cary,Wake County,North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.027 acre (410 linear feet)of stream channel(0.026 acre [395 linear feet] of which is considered a loss of waters)and 0.338 acre of riparian non-riverine wetlands,and the temporary discharge of fill material into 0.106 acre of riparian non-riverine wetlands, necessary for the construction of access and infrastructure for the Lennar Apollo 55 multi-family residential development. Applicable Law(s): ®Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Nationwide Permit 29.Residential Developments/Nationwide Permit 18.Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 7/21/2023 (received via email 7/25/2023), additional information received via email on 8/1/2023,and the enclosed plans"Apollo 55" "Development Plans for Lennar",Drawing Numbers 1 through 6 dated 7/14/2023 and"Apollo" "Groundwater Monitoring Locations" dated February 2023.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C.Division of Coastal Management. Page 1 of 2 SAW-2019-02355 This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits.If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory program,please contact David E.Bailey at 919 817-2436 or David.E.Bailey2na,usace.army.mil. Corps Regulatory Official: Date: 8/16/2023 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public.To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at hgps://regulatory.ops.usace.g.M.miFcustomer-service-survey. Copy furnished: Ward Marotti,Spangler Environmental,Inc.,wardgsnanglerenvironmental.com Charlie Yokely,Lennar,Charlie.Yokley@lennar.com Zachary Thomas,NCDEQ-DWR,zachary.thomas(cr�,deq.nc.gov Page 2 of 2 SAW-2019-02355 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2. Stream SD must be monitored in accordance with the following plan: Three pressure transducers must be installed prior to construction (per the enclosed plan entitled "Apollo" "Groundwater Monitoring Locations" dated February 2023),including • one ambient (air pressure), • one adjacent to the stream bank immediately downstream of Impact#3 (hydrologic, to document impact to base flows,if any), and • one within Stream SA between Impact#5 and its confluence with Stream SB (reference). They, along with photo monitoring stations, must be visited (photographs taken and data downloaded) monthly for five years. Annual monitoring reports showing these photographs and data must be submitted to the Corps no later than December 31s' of each monitoring year. If at the end of the monitoring period the monitoring results indicate that more than natural variations in the feature's hydrology have resulted from project construction, compensatory mitigation (i.e. purchasing stream credits) will be required at a 1:1 ratio for indirect impacts (reduction in aquatic function) in the reach of Stream SD between Impact 4 and its confluence with Stream SB. 3. Following construction, temporary wetland impact areas must be restored to natural grades, seeded with a regionally appropriate native wetland seed mix, and matted with natural fiber matting. 4. Suitable habitat for tricolored bat(Perimyotis subflavus) may be present at the site. On September 149 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act(ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to September 15, 2023. Work associated with the aforementioned activities not completed by September 15, 2023, must cease and the permittee must contact Rachel Capito of the Corps' at (919) 440-1823 or Rachel.A.Capito@usace.army.mil to determine if additional coordination with the United States Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to continuing work. 5. Please note that future impacts and/or phases of the Lennar Apollo 55 residential development and related activities associated with Corps Action ID: SAW-2019-02355 may be considered part of a single and complete project; these impacts may be considered cumulative with impacts permitted during earlier phases with respect to compensatory mitigation and Nationwide Permit thresholds. Current cumulative impacts to aquatic resources considered a permanent loss of waters for the Lennar Apollo 55 single and complete project include 0.026 acre (395 linear feet) of stream channel and 0.338 acre of wetlands, or 0.364 acre of total potential waters of the US. Corps Regulatory Official: Date: 8/16/2023 Expiration Date of Verification: 3/14/2026 U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: Lennar Corporation,Attn:Stephen Dorn Action ID: SAW-2019-02355 Project Name:Apollo 55/Lennar/NC Highway 55/Cary/multi-family residential County:Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8- digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin:03030002,Cape Fear River Basin Stream Impacts(linear feet) Wetland Impacts(acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 410 0.338 *If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030002,Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 805 0.677 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site,also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Form Date July 7,2020 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form,the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case-by-case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions:The Applicant provided a letter from NCDMS,dated 8/1/2023,confirming they are willing and able to accept the applicant's compensatory mitigation responsibility. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive,Suite 105, Wake Forest, NC 27587(or by email to SAWMIT@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive,Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil 8/16/2023 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mi1. Form Date July 7, 2020 O N N � N .J O 00 M IMPACT EXHIBITS o U L x a o m L O 0 � E Z Q Y T a L W � � CL U APOLLO 55 d Z Q Q � W � CARY, NORTH CAROLINA, WAKE COUNTY W CARY PROJECT NO . 21 =DP =5659 Q � 2T � J Tti o °CC6 Q Q z Ld CCRIMMON PKWY a Z J Z LV (SR 3127) a J Q O 2Q SITE A E D O o 14 U 13 12 11 10 Og O O O6 rn SITE DATA TABLE N U V/ 1. PROJECT NAME: APOLLO 55 Z Z 2. SITE ADDRESSES: 4144, 4124 & 4120 HOWARD ROAD Q 4281 & 4195 NC 55 HIGHWAY % CARP ENfi - 3 v7 a 3. TOTAL AREA IN SITE: 29.50 (PARCELS 1-5) / ) G APHI ALE V7 4. CURRENT ZONING: R40 soo o zso i oo zoo `0 0 z W 5. ZONING OVERLAY DISTRICTS: ALSTON REGIONAL MIXED USE IMPACT TOTALS Z J 0 Z > JORDAN LAKE WATERSHED PROTECTION rn 0 PARCEL ID. NUMBERS: SEE TABLE IN FEET ) FEATURE TYPE OF IMPACT NWP # AREA (SF) AREA (ACRES) LENGTH (FT) FILL VOLUME (CY) Ita O J6. U 1 inch = 500 ft 00 7. REAL ESTATE IDENTIFICATION NUMBER: SEE TABLE WETLAND & STREAMS PERMANENT 29 N/A 0.3528 256 N/A Q 04 W 8. PROPOSED USE: SINGLE-FAMILY ATTACHED (TOWNHOUSE) VICINITY MAP W �� WETLANDS TEMPORARY 29 N/A 0.1068 N/A N/A 9. PROPOSED UNITS: PROPOSED: 79 SCALE: 1 =500 STREAM PERMANENT 18 N/A 0.0125 154 3.72 3 10. PROPOSED IMPERVIOUS SURFACE: 333,788 SF (7.7 AC.) o IMPERVIOUS: 7.70 AC / 29.5 AC = 26.1% ZONE 3 BUFFER PERMANENT N/A 31,563 N/A N/A N/A o 11. LOT INFORMATION: NEW LOT A - 9.417 AC. (410,185 SF) It o NEW LOT B (OPEN SPACE) - 2.56 AC. (111,337 SF) OWNER DEVELOPER ENGINEER ZONE 2 BUFFER PERMANENT N/A 1,580 N/A N/A N/A NEW LOT C (OPEN SPACE) - 6.77 AC. (294,885 SF) 0 NEW LOT E (OPEN SPACE) - 0.18 AC (7,999 SF) APOLLO USA LLC LENNAR CAROLINAS, LLC ADVANCED CIVIL DESIGN, INC. NEW LOT F (OPEN SPACE) - 0.58 AC (25,125 SF) 101 LATTNER COURT, SUITE 100 1100 Perimeter Park Drive, SUITE 112 51 KILMAYNE DRIVE, SUITE 102 ZONE 1 BUFFER PERMANENT N/A 415 N/A N/A N/A o NEW LOT G (OPEN SPACE) - 0.48 AC (20,975 SF) MORRISVILLE, NC 27560 MORRISVILLE, NC 27560 CARY, NC 27511 0 12. DISTURBED AREA: 17.6 ACRES 919.465.5903 919.481.6290 13. METHOD OF WATERSHED PROTECTION: HIGH DENSITY DEVELOPMENT PROPOSED. THE PROJECT WILL MEET THE REQUIREMENTS RELATIVE TO BEST MANAGEMENT PRACTICES AND ENGINEERED STORMWATER CONTROL STRUCTURES AS OUTLINED IN THE N TOWN OF CARY LDO (CHAPTER 4, PART 4.6, LDO). THE PROJECT WILL STREAM BUFFER AND WETLAND IMPACTS o UTILIZE TWO WET DETENTION PONDS. ' ' SYMBOL FEATURE IMPACT # TYPE OF IMPACT NWP # AREA (SF) AREA (ACRES) LENGTH (FT) FILL VOLUME (CY) WETLAND 1A PERMANENT 29 N/A 0.0054 N/A N/A 17 co INDEX OF DRAWINGS WETLAND 16 TEMPORARY 29 N/A 0.0178 N/A N/A U COVER SHEET 1 STREAM 2 PERMANENT 29 N/A 0.0144 256 N/A IMPACT EXHIBITS SHEET 2 STREAM 3 PERMANENT 18 N/A 0.0115 139 3.72 D m IMPACT EXHIBITS SHEET 3 a STREAM 4 PERMANENT 18 N/A 0.001 15 0.0 ADJACENT PROPERTY OWNERS PROFILES SHEET 4 > - WETLAND 5 TEMPORARY 29 N/A 0.0397 N/A N/A NAME PIN ZONING USE CROSS SECTIONS SHEET 5 WMCI RALEIGH VII LLC 0735466240 PDD MAJOR APARTMENT WETLAND 6 PERMANENT 29 N/A 0.0023 N/A N/A UNIVERSITY OF NORTH CAROLINA HEALTH CARE SYSTEM 0735566467 PDD MAJOR VACANT CROSS SECTIONS SHEET 6 Li UNIVERSITY OF NORTH CAROLINA HEALTH CARE SYSTEM 0735660696 PDD MAJOR COMMERCIAL WETLAND 7 TEMPORARY 29 N/A 0.0139 N/A N/A ' PS NC III LP LIMITED PARTNERSHIP 0735668393 ORD COMMERCIAL E CAPITAL RUFTY 55 LLC 0735752613 ORD VACANT WETLAND 8 PERMANENT 29 N/A 0.3307 N/A N/A JAMAL AND KAWKAB MOSABBEH 0735753312 GC-CU VACANT WETLAND 9 TEMPORARY 29 N/A 0.0354 N/A N/A T WARREN HILL 0735659365 GC RESIDENTIAL o $ VETERINARY REFERRAL CENTER LLC 0735654158 01-CU COMMERCIAL C ZONE 3 BUFFER 10 PERMANENT N/A 1,495 N/A N/A N/A O ZHFA INVESTMENT TRUST 0735651357 R40 RESIDENTIAL m �o THOMAS AND DEBRA DINATALE 0735558397 R40 VACANT ZONE 2 BUFFER 11 PERMANENT N/A 1,580 N/A N/A N/A X >> PAULA AND WILLIAM BARNEY 0735557338 R40 VACANT o L`' i2 HAL AND LINDA BROWN 0735554336 R40 VACANT ZONE 1 BUFFER 12 PERMANENT N/A 415 N/A N/A N/A o / 3 @ HAL AND LINDA BROWN 10735551377 R40 VACANT ZONE 3 BUFFER 13 PERMANENT N/A 1,545 N/A N/A N/A 0 14 JOYCE DAVIS 0735550441 JR40 RESIDENTIAL PROPERTY OWNERS ZONE 3 BUFFER 14 PERMANENT N/A 265 N/A N/A N/A Date: 07/14/2023 NAME PIN ZONING USE Scale: 1"=500' ZONE 3 BUFFER 15 PERMANENT N/A 1,041 N/A N/A N/A Drawn B Checked B o OA APOLLO USA LLC 0735553829 R40 VACANT L y: y: O APOLLO USA LLC 0735557887 R40 RESIDENTIAL ZONE 3 BUFFER 16 PERMANENT N/A 10,247 N/A N/A N/A JRR CMR 3: © APOLLO USA LLC 0735661054 R40 VACANT @ APOLLO USA LLC 10735651636 JR40 I RESIDENTIAL ZONE 3 BUFFER 17 PERMANENT N/A 7,312 N/A N/A N/A Project Number: 0) O APOLLO USA LLC 10735655882 JR40 IVACANT ZONE 3 BUFFER 18 PERMANENT N/A 6,452 N/A N/A N/A 20-0001-1149 I o Drawing Number: o ZONE 3 BUFFER 19 PERMANENT N/A 3,206 N/A N/A N/A I 116 N O 017 -- EX. SIDEWALK N o r- /_ 36 _ O Oh N 2-- In UNIVERSITY OF NORTH CAROLINA ;', '" UNIVERSITY OF NORTH CAROLINA I gl'u';I a HEALTH CARE SYSTEM 3s I'J%i;; I) i SILENT CREEK DRIVE ' �, HEALTH CARE SYSTEM °= 6 - PIN: 0735566467 2 (PRIVATE R/W) N. 7 660 96 cn _------ ------ __ D.B. 17941 _PG. 2474 _- %i;;'`i` r- D.B.I 1794135 PG.62474 ; o rn 361 -- - 2 - 36,\\'? %i;`Ir ��_—_ — - DB M. 2019 PG. 2139 a o, rn -----351------- - ------ 2019 --- --- - ----ZONING• PDD MA10R '- ,;�6 \ /i E ZONING: MAJOR v L o o ' ,, ;%i I''1, ,_-'' °. - /// _ CURRENT US COMMERCIAL } --- ------ --- --- �s use CURRENT USE: VACANT 36 - % - 359- �\ 11 // ;L X `•360 SIDEWALK ---- _r350_ �S SS6 S, 8 --------- 359------------- bl ',y\ \\ /�� it 0 Z 4I „ _ a - --' -- s�� 841.10' N89'44'46"E 89.41' SO'31'S5"E % Q ' — -- - Y T Ld , _ - 35 35 359 360 36 36p 359 __ _ I .- 4. 2 --- 3 3 _ 355 ' ------ z - - OPEN SPAC G - 1 OPEN SPACE F 1 350 17b—� 78 `�s -"� - 24 E 289.76 Q ' I 349 20 975 SF s - _ _ ----_- S87 OS C7 0.58 AC. ---- --- � II 'I 1 2 z4 '1 �A _ �I;I I I I 25,125 SF --- --- 347� - ------ - I o /co ' ' NO STREAM IMPACTS ` --- - I --- - - - ---- - - --- h� % ' 343-' ,'' , , � / I i i - I ❑ /' II'I - 1 I �' ' / / / '' % , ,I 349 ❑ ❑❑'' _ --- %' � /' � %I "342-_ / ' o ; II 1 % i ° ' 1'i � i ' 1 ' ' i i EX. REAM o ---- ---- - ' TOP F BANK % / � i ILI Ilk ef - - 1 -1 �k�• / ' ' ' / I i ' ` /I --- ' ' 1 ' J�$ % ` Y Y Y I.Y I 1 I / / '�°c 17 ORBIT STREET -55b ��' .. I I yy 0 1Q Q ���' 11+ I 1 U ' I - - - - ' vY W W I ` I ` .� f 1� � , �- -�- ____ __ �Y IV `I, 'Y / / i , / 12`,00 OQ 7 354 El I %l ' II I 'I I—•` ''' ' ' 1 1 `I `, � � U' Y Y L � / i / i %l i I I' i tP 1 2. � r I 1 r I- - , / / / I 1 , J I , 1 r I �, I W 1 / / � I 1El " W I , , I ` � � � � � I / / , / / I ` I ' 41 3u, s 52, % I I, 6� % % ! M J O 10 A9 "I I 1 I `, I '2 y �L �Y J, ' 1 r / I i '' l i � ` '- 1 Gy, I rr7 I :J r % II , r _ I , I 1\ II&. "- l r % � M ` ; / a WMCI RALEIGH VII LLC t — PIN: 0735466240 I I I I D.B. 15035 PG. 2694 M E I I I I , I I 1 m o io O M B.M. 2008 PG. 1029 M M I � � � � A � I � I 1 I I I 1 I � A � V /' � / � � I I 1 � ' 1 1 I II I I I , ,'I 1 I II V h M ro � I I , ZONING: PDD MAJOR { I , y % I In M 1 CURRENT USE: APARTMENT , 11 ❑ �j�4j 26 'I 40 -356 - - I- -- 54 -.II-' I 1 63 NEW LOT A I I , I I I ' I I I \ 1 1 , , ♦ . ' ,I 1 / I I ' ' - M 1 I I I I I I 1 1 � V' I 9.417 AC. 9 - - -- -- -- ' ' ' ' �. ' f5 ,'' i ♦ _ �' i F _ 55 ----------- - C , ' I I / I I �p �'9 � 'll /1 N . � � . , I I 1 I 'I �Jt _ 4_ ��\• /'M ' M i I II I' I ' 1 I ,1 4109185 ,1 0 V Q - , ' I 1 1 J --- - ' ' J/ I 1 ' I 1 '1 , U -------- IMPACT B `' - 36>_ N I / I I o N4 WETLAND -- 16 ' I I I I _ 352__ '' w I 36g_- - - ; 8 31. . 4 56 ";- TEMPORARY _ ---- r� II I I 3 hLO ,�w ❑ - - Z g6\\\ 346 - ���� NWP#29 -''-- 3s5__ - - - ---------- °' � I - - ---- - ---- - - 1 _ ; AREA: 0.0178 AC ` - -- -------- - ---- -- - '- i I I �' �'' 7,1 ' `Y . `1' i I 1 I 1 I I ,'1 \ ``` 3 _ --_ r N 29 43 7 5 1 1 U I I Yz w --- ----- -- - --' 3 0 W .�` CT #1A `363-_ ------__ Cl) w -- ----------- ------- -- --- - -- ,y�'5,' 3� r 4 /3 - ---- -------- ------ N ,I % WETLAND ° I 4 9 32 33 ' -- Z % PERMANENT / -- - - - ------- - 2- _ z0. _ 3 n_ _ 3__ - _ NWP 29 _ _ a �9 AREA: 0.0054 AC ---- ----- 9 (..) cc _ _ ---------------- z J W o Z W ; _ 35g _-- - 111 I I I I -_ _ I I / , 1 , 26 --, � ,' ,' , 25 �- `, �. —_ 21 3R3 � - -- --- ----- � a '� � � � � 'I 'I `, '-"! ' ��_------ _ --�-_--�_ ----_-__-- � � J � U. � 20 - c z 3� z� 2 - _ 36 35 _ _ ," I I - '3S8 ---_ _ _ ------ - -- ,, 4 i�__ , , ' CIO � , , I I I I , � W T J Q 00 O -, ■.- N� `I --.'' -------------- W 5a '' , Q Jam. L ---•v------ - -J' h ' ' I i ' I, _355`- --_ -- �-358 > G - Wf,r/fir' •^ ,33 _ l i ', \---' _ 4C. 354 -- -357-___-- �' — li ko 4 ' P 4' A� r 15 15 ,-�1" 75, ,''I / 353- `` --------------------------- OD -'356--_ - --__ _ 3 352 -- o 3 $ 34 I o 4�3 3. ��9 ----- 62,' IMPACT #21 ----- _ ----- -- ------ N N N l33 - - STREAM o,'' % 339 .3Q9 � ------------ _ 3 Moc o0 o PERMANENT _ 3J3o _ - ----- ------=- -_ --------- _----------------- 342 _ NWP#29 .� 334'--- ---- - - - - 35.` 35 - AREA 0 0144 AC so 0 1 334 4> a -- --- --- - -- 2 - - _ 1 = ----- E _ ��9 3:3-'-334 _ - -------------------__,I I II 1 I ', ; I '` _ ., �. ._.I "�I �., -3 __- L-IN ,r � .I , E �E� -' ,- - GTH 256 LF 0 Ht ' , ' /' 1 I, ❑ \, __ - _ _ \ ' \ II . I �I L ` 5 J,, ' 4' a�'S `I`' ' I / OPEN A . - 3s -34s-___ - o5�b V/AN Sari i' - ' - _ - 79 - _ I -- - 23 34 14 13 L -339-- — - i ' l'' 1 ^� I % ' ' 44 iir o• _ I 1 ' 34 I I ; I 1 CN , . 9 --33 --- - _ , �, , , , 'i'r ,' ' ' I 1 I I - 393 8 _ 7 45 3 \ ��I'i' • , i00, ' 30 I I 53 I , 1 ,' ,o , , I I of I 1� 00 1 LUNAR WALK DRIVE , , o , , , 1 , 16 0 1 17 'oo �� ;:;',�i 0 w G, w w - -cP v' �';'' 033 336 _--- 33) o I y ' 1500''g36 s; T of -cam+ �- -' g •r o %'' p2T 34 -- ------ - 5 3 - 2 . JOYCE DAVIS cA 9 O a PIN: 0735550441 ;/ ��' --- --- _ = --- 4 3 ----- -------- 37 URBAN —__-- --- 1 0' 0 CARY - ' I I I I� 38 0 TOWN OF 3 D.B. 11251 PG. 1645 .M „/ " ' ------ % % - - — --.TRANSITION --- --- ZONING: R40 - M ;=� T _ � - -�•� 1—% BUFFER CURRENT USE: FORESTRY ,o;� ,� - _ ---- ----- ------ -- --- - zz- w "- 111 � _ _ - 0] ll ---- - _ 337 3g' ` 3 0 IMPACT #19 �33s - SCM #1 --- --- - - - 40 41 _-- \ - ca BUFFER - ZONELO 338, -------33 --- --- --- 336 N PERMANENT --- 0 100' TOWN OF LO 330 - -- - 315_ 35 „'� ---- -- ---- 1 CARY URBAN '`� AREA = 3,206 SF - __-- _ _ _ _ 313 - _ _-- 3��'' 334 1 t _ - - - - 31,.,1 _ 3 3 - x S TRANSITION BUFFER `�� ----- S0 3 - 333 ---------- 3 - 334- , I , - ' ,-- ,. IMPACT 3 ,vF� - _ E 33 I , ONE 3 ' � IMPACT #18 ' �BUFFER Z '' zoN SA ' t --- -325. - - - --- -- - - N ST APERMANENT �3� EW LOT B - 3 a _SA ,n tik �' 2� -\ PERMANENT 33 34 AREA = 6,452 SF -_--- ___ -_- 329--_-_ ,, �' '330' 500 YEAR FLOODLINE \ ----_ ;_ ��S ^ - ---- ��� .��� �ti -- - `3' -/OPEN SPACE - --- - --- ---- -- ____ -- `' 329 Qw 100 YEAR FLOODLINE �/ A =� --- -- 2j _ 3� \ �g' NWP#18 �� ��_ --------- - - ,_--- a � W�� _ 0 I I _ - NE �, 0.0115 AC i '' ------ --- - ------ -3za- W m -: - - � S 3 z Zo '`� 2 i - 32s - _ 2.5 C■ _ - - - 32 a Z -- r' -------- ----------- cr`S `�, � 44 ry _ -� I �� /32 � LENGTH 139 LF ----------- - ,, '� '%I' �` �Q- ,_ _ ----- ----- 2 j " 1 �3 __ _ __ ---------� ---- �"�` � _ ''' _ 3 '' - � �� �� /32 ��FILL VOLUME = 3.72 CY --- -- -- - r,�,,,- e ---- � - . -- - -- _ --------- !ti 8 111 ,337 SF 323 --- a ,N EW LOT B ZONE 2 330--- ----- I I ' I --------- - % 1 ---------- - _ I , _ 9 - - � ,�� _ I \ ----- - - ---- - oNE 2 ---- 32�' �- s, _ - ,`__, ; 6.770 AC.Ln ----- _ Z - ---------- �; _ `�' IMPACT #17 _ ZONE 2 o N y61• 4" DIP TO MAINTAIN 3 �. MICRO PLUNGE POOL ' �--'`/ 1)a "EX. STREAM �, - ONE 3 w ----------------- -- ---- - --- 0 IMPACT _ '3 2 325 = - 04.4 '" /�' �`` ' 294 884 SF -ZONE 1 BUFFER Z - 6 Z TOP OF BANK \ - ��-�o — -� , EXISTING EASEMENT 4py 3242�STREAM HYDROLOGY�� ��,�BOTTOM 322 4,49„�I ,_" RQ RI�I ---------- S85*51 �\\\'a / w �� �y 3 - SEE SHEET 4 FOR 5'4- __- W p► TE _ v _ _ 83j• s. - ��� �. Gam, 23 -- - S� -- - O V A - S� -- S85 5 W ';,\ -=-- --- - AREA 312 SF R R --- - -- - 160.11 \< - •- co ,� - DETAIL p - � " - ____ _ _I, o EX. STREAM _` y ZON ------ ------- O - 500 YEODLINE ��' 22_ - ----- --- _ �Q�� G 283 " P5�;=,;;; N62'2617 W _-- --===--'� �I ---------- - o TOP OF BANK -_ -_ �G ^' q - �. - , " O CJ P �' _ - _-- --- - - , 320' ---- S89'S9 57 W - --- l6 '`9? SIN _ - _ 32.00'-------_'" - �- '- -==_--__ - -= N - 23 ,_ _ # _ - -- _� -- 8"' _-- ------ S _ ---- Scale 1 -40 " EX. STREAM ';; _ ----- --- ' " - %/ 9' jV _ --,-' ST ----------- %� ------ - N7g• „ -- - . r > IMPACT 4 o TOP OF BANK `„" N89 37 30 \ _ - 1 EA ' \ - -••_• •••••___.•_•.- _�•:__ - W 85.70 s _ g S75 50 51 W:-- PERMANENT - W �'' Drawn B Checked B ODc __- -__>=_ 100 YEAR FLOODLINE _ _ _ --' ;_-"",, JRR CMR 9 — — --\\ - - - - - -- - - - '- -3 AREA - 0.001 AC FLOODWAY \ i\ FLOODWAY 6, — -- -- -- ---- ---- sA�6-LENGTH = 15 LF I I THOMAS AND DEBRA DINATALE�- GRAPHIC SCALE i � - -.32 PAULA AND WILLIAM BARNEY ) -__-- Project Number: c� o�; — S 5 - / PIN: 0735651357 / ---- Z p— i 40 0 20 40 80 160 O '' �HAL AND LINDA BROWN A�� SP FILL VOLUME - 0 CY PIN: 0735557338 I rn ''� �, SA ' --=- D 8151 PG 13 0 I D.B. 8522 PG. 1115 �5j PIN: 0735551377 \ \ '.32 ' 3 4�SA < - _ _ -- _ BZ 0 I ZONING: R40 % 20-0001-1149 D.B. 11251 PG. 1645 �p� 3' SA�2 -s` - '-- - --- - - -- ZONING: 40 ,--- �� ------------- CURRENT USE: VACANT "'/ pc I S _---_-- --- _ CURRENT I USE:RVACANT � l ';,T,', �j ZONING: R40 I HAL AND LINDA BROWN _ --- _ _ _ �' �� o CURRENT USE: VACANT , PIN: 0735554336 ____�_ --- Drawing umber. o - --__ -- _,'� ----------- �� �� I ( IN FEET ) n N -------- I D.B. 11251 PG. 1645 - -- - _ - o --- ol 100 YEAR FLOODLINE ZONING: R40 — - ``- _ �/ 100 YEAR FLOODLINE y 1 inch - 40 ft. 216 �� j \ \ 500 YEAR FLOODLINE CURRENT USE: VACANT — �/ 500 YEAR FLOODLINE ' N O\\ ``\ \\ \ \ \ \ No r O NN AROLINA (q EM Ei 74 N n \ \ rn rn 39 OR T6 \ �\ \ \ \ o U a o RCIAL UNIVERSITY OF NORTH CAROLINA m �\ \ I11 \ \ } o t HEALTH CARE SYSTEM \ \ PIN: 0735566467 \� \ ✓ � E z D.B. 17941 PG. 2474 ' B.M. 2019 PG 2139 W ,n a ZONING: PDD MAJOR \\ 1 I 1 I I CURRENT USE': VACANT ��` � \\ 1 \\/ z 289 S87-0524"E 289.76' S87 04 58 E 363.5 ' 2 \ M W O � \ \ \\\ \ 1 U\ / I -00'\ 1 \'1 ` ___________________ \ U 'Ile �,``_ \ lJ 79 ` an\``\ , \\ Al ', \ 59 -.001 \`� , \ \ Q'• w 1 %,4' .� .� .� - ` - \ ,\IMPACT #6 \\ \ r 36s i. o % W - ` `\ WETLAND \ \ \ \ o Q ;PERMANENT 1 I I 1 Ln I I NWP#29 M M ;.� i`. AREA: 0.0023 AC \ \\. \/ / a J ^ to M I ' 1 \` \�,\ O .f\\\`'`�. \\ \ \\\ \� `- / z W M raj �/, In ,O10 , I I II I I ' '/ \ \ \\`.\ \ . d ^ co M ; I I� IV � � y y, \PACT 7 36/ \\\\ \ \ J O I'I y WETLAND 1 1 ---- ; 41 -- ,Y `Y `Y y TEMPORARY NEW LOT A NWP 29 / AREA:I I 1 I III \ \ 0.0139 AC I I 197 ' ---------' II ; \ \ i T A --- 3579059 O - 357 059 SF 370-' kk \v ---------- ' ' ' ' ' ' / ' ' II ' \ AC. ----- % IMPACT 5 80 \ \\ #I � I --- ---- WETLAND \ 5 SF TEMPORARY \ \\ 3 ---- - , NWP#29 '1 �\ '•3Ss g ° '�\\ �`, // � o 36�_ --- -368------ AREA: 0.0397 AC 3s) \ \\ ��� �, \\ W , , , , / / / I I 1 1 1 ----------------------- 366 364 - ,,,� `` �� WETLAND \\ \ N IMPACT8 ` 3 i -, 63 I /Z 1 / PERMANENT �'`,A A z Z Cn--------------- -------364 _''/ / \b °f} .v-% �.�• .�/ .v 1 NWP#29 � \\ \ �S9 \\`,>r \ `� i Q �� AREA: 0.3307 AC J H 363--------------- / / rn - 1r ,Y � \\j � �^\v 1� M s PS NC III LP LIMITED PARTNERSHIP = _ 362 W u J �/ "� ° ', �/� �/ ;�/ �/'� �/ ;�/ .v ' ', 1 ,� '`W \ \ \\`, PIN: 0735668393 �n � Q /� ♦� I �, , �, I,� �, 1 � M\\ \� D.B. 16712 PG. 2500 `� O --- B 34 -'-- ------------------361 --- u 1 ' ���"P'� v `, � \� Av` 'A M 2015 PG 18 z CW � Z W _ rn 6� -C - - ��° 56 _ "� \��, �\ _ 50\ „`` CURRENT COMMERCIAL rn a -- ------------ 3__- - ChB=S24'12 23 E J � W � 35a _-'' W _ �a° ` � J 1 ------ ----- -- 359 - - 35 y 57 � R=5655.00' \ °N° Q '�0 8-04'3w" \ \ \. W -3sa----- 3g �a --'-- �� IMPACT #9 \ ��\\\ \ '`. - ,\° > / �, y y ---------- -- rn - -- -�►-357__ --------- --- �p r y w yl yM WETLAND ( ., a W A-36 -- ------ 53 `JAG - M / �' ```�s TEMPORARY a _-__ _'3s6- 352 --- \ 11 /� ``3S ��\ ---- _ I NWP#29 , ---------- -_ - -- 3g1 D 3�� ---- -- L� �s �` ,�s. �/ ~'-`=� _ - .AREA: 0.0345 AC \ �/ \Q \� - _ _ ---- - N 1 04 0 1 \\\ -�� ------------------- =-- �N, -------- 5 -- - - --- - `\ "--------- - E --------- M --- -_ __ - - -__ Vim• '---' "------- - � --- / - ,'�� � / ; �� =__-_--'- 00. N 3 /' - - ,' O / - _ _ 350'---- - - - \ / / /il i% -s' b'" \ --352--- -- - �` �`I\ -- ,, / - ------ -- _ _ - - _ /- SCM #2 ;;'fs t - --,'' 2I` \\ A N (WET RETENTION POND) -- - - --- i „ _- _,3 0 0 -- " - -- -- ----- - -- _ �� / IMPACT #10 3 NEW LOT C --- --- "- --- _ _ I, -- ' I BUFFER — ZONE 3 N �/' el/ p� \� ---- - ------ IMPACT #14 ;'1 PERMANENT \\ r ONE 3 ` 35 95 F 53 - - -- - OPEN SPACE ---- - - SF ,\ �k5 BUFFER Z AREA 1,4 - - -\ - ------ -- - - ---- PERMANENT _ \\ \\ AREA = 265 SF I'`. 34s \ \\ \\\ ' - 6.77 AC. --- -- 3�5 - ----- - - - _ - -- - - - -- ----- / �/ 65 '' ,'' ~; ---- --�� _ ------ -- 294 885 SF - _- _ - 3� ___ �,'/ ; I ',�1� ', �. \,, ':L '` - -�_,_ � \` ` �\ IMPACT 11� \ \;`;` ��\^. 7 3 _ 4 ONE 2 -- -� o --- -- -- _ _ — n `\ __ -- 3 \ _ 6' CAPITAL RUFTY 55 LLC , BUFFER Z \,,;,';, � 1"\ , I 4 '\' PERMANENT ��`'`;" w - --- �j5" - - -341/ ;ui 3RS. - AREA = 1,580 SF ----- ----' PIN: 0735752613 __ IMPACT � � �- --------- 5 'yll; I'''.' AQ ZONE 3 - \ , , \ ,, PAC #1 �- �, \ \'�y`,`�`; D B 12822 PG 371 m -- _ �° -- - ------- 100' TOWN OF CARY - BUFFER — ZONE 3 �R� ------ \ \\ B.M. ZON` _ - 2015 G. 1 --- ---- - � URBAN TRANSITION BUFFER� -- 340, ____ II II;\, I `\ �x ,, , � \ \� � \\� \\ \��`,"`\ M P 8 -,- \, \\` '`• - _ ---, -------- III I ;II ? ` \ ``\`\\°�'_----- - - -- - 340 --- PERMANENT ;I„I 3 - �� ----- 339"--- _ - -------- -- - -- -- -'-' — pl,,li A �' -- RD IMPACT #12 CURRENTIUSE:OVACANT ---''' _ --- ----- - 339 AREA — 1,041 SF ;'Is - BUFFER NE 1 \ -----338 --- ___--- _ --�-- �_. ' - ,-'� __--- I -�— •, -� _ __---- BU ER — ZONE ---- - ----337— _-_------_-- ----------- �� --- ',''' �` PERMANENT - --'---- -----336 '--------- ----- - `S -'- -------' „ -ZONE 2------------- - _ - - - - -- c -------- 33> � / / ---- - AREA 415 SF \ . Ld U �. \ �- �- � - \ i ', \� , 0 71 _ — - '`\ ---- - \\\ \� . �`\'. GRAPHIC SCALE -_ - -- =33 �� - - Q S� S/ -___------_� ----- ---- -' -- _ --- 'J %' 40 0 13 20 40 80 160 _ \\ _ - -- -_-- - F — NE 3 =--- --- _-' - 100 YEAR FLOODLINE ----_ ---___--_--__ % ZONE # , . I _ � ----------------- _ 334 .\` / '- _ _ - __-'_ -- _ ` i BUFFER Z --- 500 YEAR FLOODLINE - •ti ,�. n;, ' --- - ====--------- - = % /I %1 PERMANENT ------ - ---- -\s32--- ------ e(�/.�9 r'' ---- _=j i' i ___ --= _ _ " ';' ,.i \ AREA = 1,545 SF \ - -�-- _ - -// -=7• 3_ --- �- F� ,,1,��0g . _ __-_ ' \ \` 1` \\ \9 IN FEET ) 70 ------ --331- --- M �� EX. STREAM _-- -____ F;;;' ;` \ - --� �� /� --- - _ - _ \I, \� 1 inch = 40 ft. _ _ - -- ------------ TOP OF BANK --"- _- \\ �\ ss ;'; / m PACT #17 IMPACT #16_ 1 ,_-- ___\::L„ '' �� ZONE 1 _ X FFER — ZONE 3 - - -------/---- -- 0 ` BUFFER — ZONE 3 33 _ % RMANENT .. _-- ✓PERMANENT --- --- EA — 7,312 SF �= AREA — 10,247 SF _ — o --- - ----------- �� ��`„v 1 FLOODWAY s /';� --- ��� ZONE 2 � \\ \� _ _ _ __ __ _ - 11 - - _ _ 1 -_ -- �S2 20 36 W ;'__--____ --;,< --- ------------------------------------=------- - �I l I -- ; ,_--__- -- - ,,�-- A '\ _ - -- _-- _== �I -- ----------=--=- --- __'__ = - - 'e, o/ \ Date: 07 14 2023 ---- _ - S59 01 03 W- 18.96 1 „�� -_ __ ------ --1 ----===_-z,�: .N " --- --__ �� \ S ZONE 5 E • -- --- _ 1~'----=--------------- - _ _59 36=W=--- • __-__=======__�___==_---' A\ \ ' Scale: 1"-40' 45 32 ' �, -_ __ ' ------ _ ---- - ---- ---- --- ��� a� \ w V A 489 39 ,v1v� s � a UST ---------- 214.3g' --- - ___-- - ---- --- - ---- "W 232.83' Drawn By: Checked By lb 85 ,- ,`'` ---- --- N88 4930 i M N % \\ \\ \ \\''' \',,'1 1',' — — ----- / 100 YEAR FLOODLINE ------ ;,} p' _ �� \ \ \ ;\11 JRR CMR Project Number: HILL LA z NTIAL I I �\ _ \ \ — \ I % 1 rn — \s 1 ZHFA INVESTMENT TRUST ' —� _ / �� —� PIN:A0735659365 s PIN: 0735651357 \ �� --', �x \ �\\ \\ \ ; I 500 YEAR FLOODLINE o, D.B. 2410 PG. 518 ,1\,`,`,'\ 20-0001-1149 ' D.B. 16853 PG. 1085 i VETERINARY REFERRAL CENTER LLC\ ZONING: GC _ _ i \ \ \\ Drawing Number: B.M. 1973 PG. 329 PIN: 0735654158 CURRENT USE: RESIDENTIAL \ O R40 ZONING: / O — _ _ _ _ D.B. 15836 PG. 2235 \ ��� OI I CURRENT USE: RESIDENTIAL B.M. 2016 PG. 1862 \\ I \\ \ N ZONING: 01-CU / 6 1_� CURRENT USE: COMMERCIAL \ \ �\ \\ \ O � i \ ,` In'1 N : O I- w EX. 24" RCP I I N uO w w C, I tr�11 I I EX. 4" PVC a� N ( . w w X I I -11 �, ap v) w I EX, 24" RCP _ --_ ____- Oi of w -- w •� v O U51 a o w w 3 II I I " II m C,) Ld¢�a Y ° E zPROP. 20' PUBLIC wI � �I U I1�I I I DRAINAGE EASEMENT I :1 Icol I I30 W N 00 �l � U 59 79 10' = o LO Q z= v EX. SIDEWALK� EX. DRAINAGE EMENT° (DB 11412, PG 66) W _ I I = 0 I I w w w 1 w W w w W) U3: I I I I I U I IWOTUS w PROP. 3' TOWN OF CARY c) " � � W w w STREET LIGHT EASEMENT w I ` Z W I I 'zin I Ca Y v l v w w w 3' a0 I H J Of �I OD I PROP. 20' PRIVATE w \ w w w a DRAINAGE EASEMENT w W, w w V I I I w w PROP. 20 PUBLIC cp v� A& n_�� yi�j� v w w DRAINAGE EASEMENT w 1 II Q� It V. I � I N w w I I ` II I ul 1V w w 61 " 1 + N w w w 1� RCP I EX. VARIOUS UNDERGROUND F� O r EX. BUILDING j + w I ` UTILITIES, CONTRACTOR TO QI = ( I _. N w w N 1$" RCP62 FIELD VERIFY VERTICAL AND I Ex. 15" DIP O w " 5$ I HORIZONTAL EXISTING _PROP. R W ►= w PROP. SIDEWALK 0 LOCATIONS I I I CONNECT TO EX. DOMESTIC 16 _ — n a " 20' w EASEMENT 8 C� III , "Al I q WATERLINE BY MECHANICAL ALK FH & - DI 107 LF 16" SWS I JOINT FULL BODY TAPPING PIPE OUTLET 56 VALVE FH & I DRY BORE AND c* ��= v SLEEVE & VALVE — 0_ JACK �.•o � � L_ - - - - - - J L=111.1�.00 VALVE N 12 DIP WL 3 PROP. 15'X25' o li ♦♦/^� BOTTOM CIF 55 —(0 \�� \ 27 _ TEMPORARY o Q V♦ CHANNEL PROP. R W _ 4 � — CROSSING BY — CONSTRUCTION Ld L a 1 SSMH-8 (4' DIA.) � I i 8 8� II BORE & IJACK a 0 EASE2g 0000 BOREMENT& JACKR w z D EP�tH STA:24+46.72 ;o 29+17 0- RIM=351.92 > > I II I II `O 70 Z J PROP. 10 PROP. 15'X25' x OPEN PIT FOR WATERLINE a J O INV.=342.10 OUT (W) GREENWAY y OPEN PIT FOR I c�> W CONNECTION. PAVEMENT, a 2.25 * D5 ` / / w w w w 20' ` ~ I BORE & JACK I� �� CURB, AND SIDEWALK DAMAGE A/ SHALL BE REMOVED AND RIPRAP w w I II I N REPLACED. w PROP. 20w' PRIVATHINCCEI 57 I II.x I I I(mDPROP. GREENWAY DRAINAGE EAMENT >d U �I-1 2" GRAVEL EASEMENT LENGTH OR GEOTEXTILE o'- / 1 . w w Ex. WOTUS w —cr D I I I I w w w EX. GRASS MEDIAN PLUNGE POOL f o - / ` w w w ww EX. SLOPE EASEMENT a 10, I PROP. 110' SIDEWALK I it I I D 3 DEPTH. 1 PIPE DIA J w (DB 11412, PG 2266) ` I, I �I ICI p SIDE: 2 PIPE DIA I 10' ` wEXW 14""/ DIP FORCE MAIN I a. �I IWI m c� Iw LENGTH: 4 PIPE DIA (APPROXIMATE LOCATION) I I nI o 11 WI ICI U wl .0 LUNAR WALK DRIVE PLAN - — . PROP. 30" CURB & GUTTERPUA4p ON ff I II II 4 PIPE 1" = 40' � III I � CONCRETE I � u ,''�� I � v X PIA- ---t -------r------------ -------------I-------------r-------------I-------------I-------------T------------- -------------I-------------r------------T------- 365 L0 I I I I I I I I I I I I I I I I I I I I I I N Cl) I I I I I I I I I I I z SEE INTERSECTION DETAILS I � Z I I I I I I I I 1 I I T I I I I I I I ON SHEET Ct9.2 1 U 1 I a Q I I I I I I I I I z I I / ' PR U A ,IAA/ LL �/� I I I I I I I I I I I 360 1. THE = Y/ r U) -------r------------ -------------I-------------r-------------t-------------I-------------r--- --------�-------------I--- --------- ---- ------- W I I I I I I I I I I *EX. 6" PVC SIZE ECLAIMED WL GRA L0 O W Z J 1 I I 1 1 1 I I 1 I 356.76 ADJ z 0 LL OOTLET PLUNGE POOL i i i i � � I Ex. , 6 ST � * RE � J 0 � Z O I 356.26 " 2 CO a W 1 I I EX. 16 DIP WL � J I 1 1 1 I I 357.45 AC - O AT ROADDiGRADE I I 1 I I SP N Q J a 1 1 1 1 I 355 AN W ------- ------------ -------------I--------- --- ---------- ------------I---------- - - - - ------------I------N ------- -- } ------- 3. Co I I I i E . 8" GAS Sin I * i CONTRACTOR TO FIELD CO W Of EX. 14" DIP FM i VERIFY VERTICAL AND RE Q I I I I • I 353.76 I HORIZONTAL EXISTING LOCATIONS BEFORE 4. DE 36557 5 365 37059 79 EX1370 I i i 0 3 INSTALLATION NA = - ----------1---------- - - -- -- ----1- - I I I I I I I I UTI N I I I I — I I I I I I I I I I ---II ------- 350 ------------- ------------------ ---------- ------ ------ ---------- M to CONTRACTOR TO NOTIFY TOWN R E N o I I I 1 too I i — I ' ►� ' ' ' i i 107 LF 2 1 SV�S OF CARY UTILITY DEPARTMENT IN I I r7 1 M 1 15 RCP I I 1 I 1 1 1 DRY BORE AND JACK ADVANCE WITH FIELD LOCATION I I I II I II I 347.361 I 1 1 1 1. AL OF THE EXISTING FORCEMAIN AND I I I I 1 � i 1 .1 I i i i i TIME OF JACK AND BORE RE 360 1 __ 360 365 ____l__ 365 I _ vE I I I i HATCHED AREA TO BE I PROPOSED I I ______-� t_I_______ _--- 2. AL I I I *�k NOTE: CONTRACTOR TO CONFIRM IF 345 N I BACKFILLED AND COMPACTED I GROUND 1 1 .0= o N o f 1 I 1 , EXISTING 6 RECLAIMED WATERLINE IS IN o I I I 1 r` I I v I I CONFLICT PRIOR TO INSTALLATION. IF IN 3. RE N TO A MINIMUM OF 2-FT ABOVE 1 1 00� I 4(6 N I I I HATCHED AREA TO ESE I STORM PIPE, 1 �,*rn I 1 1 1 1 CONFLICT, PORTION OF EXISTING 6" PRIOR TO STO M I RAISE TO 1 1 I 00 +� -* 1 1 " 1 , BACK FILLED AND COMPACTED I RECLAIMED WATERLINE CAN BE ABANDONED 1 PIPE SEWER INSTALLATION I FINISHED GRADE I i i I .M � i i 36 RCP i I TO � MINIMUM OF 21FT ABOVE I PER TOWN OF CARY STANDARDS AND I I I I I I i II I i 344.06 Q i i i i SPECIFICATIONS IN ORDER TO AVOID 355 355 360 360 STORM PIPE, PRIOR TO STORM I I 1 I I 1 cn(n— z I 1 INSTALLING VERTICAL BENDS WHILE I �N� - I 1 1 I PIPE I SEWER INSTALLATION I ---- - - --- � -- - ---- ---- - -- 1 I I 1 1 I I 1 I CONNECTING TO EXISTING 16" WATERLINE. 45 II I I ----- -� --- ------- --- ---------I------------- ------------� ------------I----- ------- ------------ ------ ------------------- --------- --t------- v 1 I I I I I I I I I I I I I I PROPOSED I 1 1 I 1 1 I I I I I I I 45 0- I I EXISTING I 1 GROUND 1 GROUND 1 1 I I I 1 I I 1 I I I I I I I I I I I I I TE " I I I I I I I I I I I I I I I 12 WM I I I I I I I I I I I I 1 I m ___ - ------ I I I I I I I I I I I I I 350 350.12 1 1 350 I 355 1 355 I I 1 I 1 I I I I I -- - --- I I I I I I I I I I RED 3 I T I I I-- , I I I I I I I I 1 I 335 I 10-YR HGL 1 34.95 , EX. 30'- RCP 0 1.037. I I I I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I 1 I I 1 I I I I I I I I I I � r I 1 I I 1 I I I I I I I I I I I 1 I I I I I I I I I 4. IN I I I I I I I I I I 345 1 345 1 350 — 1- 3501 1 I 1 1 1 1 1 1 1 1 MA RE x SOI 1 1 I I I I I I I I I I w 1 I I I I I I I I I I I I330 1 --- ---r --- ------- --- ---------1-------------r------------� ------------1----- -------r------------------- ------1-------------r--------- --t------- GE 10-YR HGL I INV. IN:335 1 1 I 1 1 1 I 1 1 1 I TIRE 26.75' N 30" i $" GAS RCP 0 0.79% ' m ' ' ' ' m ' ' ' ' ' 5. AL '105.80 N 36 INV. OUT:3 1 0 " (APPROX. LOCATION) I I 1 1 1 I I I 1 1 I I I rn I I I I N I I I I I r-i RCP 0 1.89% r�i o t` �, W 6. AL 1 O N M I I 1 I I I I Q I I I I I T __ 0 I Q I I I I O) I I I I I THE 340 _ ►� 1 340 1 345 0 0 0 1_0 3451 M o h o I I I 1 1 I 1 o I + I M 1-trY r7 I M I , i IIt ,�,� , i i i o i � i i to 0325 II I I I --o ---o _-o �----- ..- Q I ------------ 'n-_---__--_-I---->'�------ ------------� ----- -- --------� -4-------- m 1 EXISTING GROUND 1 1 I HATCHED AREA TO BE BACKFILLED w W W w w w�: W i i i �w J J .. --------------------- = I I I AND COMPACTED TO A MINIMUM OF m 0i 0 0°0 °°ao I 1 1 1 1 1 1 I w _ 1 2-FT ABOVE STORM PIPE, PRIOR TO a"' '-'`O a�O a C' Z c'`'., i i i Q'O N 1 1 I STORM PIPE SEWER INSTALLATION I- F 00 F N N ' ' "' ' a I I I I I 1 I o: + v �� o: + � + 1 i M+ i � + i i + i o 1`IjN N �N wjN 2� I I 1 ca I �� I I N I I W I 335 ----------;---------- �-' _ 335 1 340 J ---� ----;—� -- 340 I �QQ � as z .. e — Q I I Q 0 I 0 I d cn er cn v in cn N I I W F I li N I I � I I I 0 3 I 3 = I = I JU) 320 Date: 07/14/2023 Z I I Z Q I Q I Scale: 1"=40' W I L►1 I I N M M ,� M U-, M rn M M M M co o I I I I N � rn � � � � � r` � � � In -7 rn 17 rn OR O I O � 1 0 I c.i nj cli rrj ,� 0 u-> 0a ^ uj Op of v; N Drawn By: Checked By: O I I O ^ I ^ I In In '� In to IA to In In O 1 0 N 1 1 M M r� M M M M 'v M r� M ►� M ►7 � '� M "� 4 JRR CMR I I I I + + + + + Project Number: STATION 0 1 As STATION 0 1 24+00 25+00 26+00 27+00 28+00 29+00 29+50 20-0001-1149 1 inch = 40 feet (H) T LUNAR WALK DRIVE PROFILE 1 inch = 4 feet (V) 0 0 Drawing Number: 0 o H: 1" 40' oV: 1" = 4' 0 20 40 so N 4 / 6 0 0 N N y Nap 'n ap cfl to C r,) - 13+00.00 14+50.00 16+00.00 300.00 300.00 360.00 350.00 0 0 a o mT 0 E z J i a/ 3t10.00 i 360.00 Q Y O W L I d' 1(') O 30 o 30 $ 30 ^ o o: N z 3eaoo n �' n 3aaoo Ar� seo 00 Oo p 0_ 35MOO a ______________ _________________ ______________!________� _S_______________!________________ _______________!_______________ ______ _______________L________________________________!_______________ ______ _J__ ______________ _____________ ______________ _____________ _____________ ___ ______ _____________ ______________ ____________ ______ _____________ _____________ J d� -_ - -- - H -- - - - --- --- --- -- m - = --- - o Z ol� to 31 rrj Of 0- 0. _I M w 3j W) � a�W Q C7 OH OH ; ,.� W W o` � Q' W n d W O_' Li 1 I I oo N 390 00 360 r7 1 ai_ O(O r0 QI (n N W O I I I 1 L w � (0 1 j }i in to ; w Z) � w TRETAINING W aL i W n 0. PR. 10' O M J O ; a '�` PR. 10' :WALL #3A Z PR. 5 w > W -GREENWAY RETAINING 340.00 > o oo s�oc0 w (n 5 u� cavil :GREENWAY 34aW --------------- ----------------y----- J-------------- -------------- '- ------------- ---------- - ----------------------- --------------- ----------------J---- ---------- ------------ ------------- ------------- ---------- --------- --- -------------- ------------- -------------- --------------L---------------%------- ---- ------------ '-uf-------------'- ------- -------- -- -------------SIDEWALK a W WALL #3A W 4 -;-- - - - - --- w - --- a -2.'0%_ a 4 2.0% - -2.0% O ; 2.0% \; `227,RE q PR. 5' d Gt PR. 10' :WALLIN#3A 1 ING a 2.0% w -2.0% o ; 2.0% \ -1�•69; RETAINING r - - - - ;- - ` TAINING MO.00 w ; w UJ ',GREENWAY 34aao �\ > ---------------=------------ -=- - ------ = = - - - - - -�-- = - - ------ - ----------------' - - - - -------- - ------------ -------------- ------------- ------------- ------------- ------------ ----- - -- - - --- - 6 --- -- LL B - --SIDEWALK;------------ - -- - - -- - - ;-- -- - - -- --- - YVALL3 - ui 11�--r11 - G; -- - --- - - 1- - - T _ - -2.0% dQ 2.0% -2.0% o ; 2.0% `�24q - - - i - - - - - - - - - - - - - - - - - - - - - - - - L) o3".00 ssaoo '- - - - - 1 _ - - - - `i RETAINING 330.00 1 \ 1 e s3aoo 2. 9� 1 , I 1 I I I 59 - - - -- -------------- - - -- -----------------,--------- r ---- --� - -- -- -- •-------- - - - T -r - - -- - _- _----- - - _ \ - ------ -------------------- --3 5 -- - - -- -------�- - - - - - -- 5 5 - - J --------- -------- WAL38 15 ST 1.1 STRUCTURAL' - -�- - _ 32.5 1 T �8" WM ZONE OF INFLUENCE \ - - 8" WM 331.48 1!1 STRUCTURAL 330.06 \ MODsso. 330.22 ZONE OF INFLUENCE , I 2 00 ST ,� �------ - - - -- - 1 1 1 - 327.54 �8" WM 1:1 STRUCTURAL L 1 1 " t8" SA ZONE OF INFLUENCE 8 SA 330.06 326.30 V 1 320.00 520.00 MOD 320.00 324.10 1 1 1 8" SA 24" ST J 325.71 ' 1 1 325.25 � 1 320.0o s2aao I I I 1 1 I I I I , I 1 I I I 1 I 1 I 1 I I I I I 1 I I I 1 , I I , 1 1 1 1 , , I , 0 1 1 1 1 1 I I 1 1 1 1 1 I I I 1 310.W 310.W 31&00 31&00 310.00 ; 310.00 Q 2 •50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.( -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10!00 20.00 30.00 40.00 50.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 a Of w Z ra � O O d •- 1* N O n N O O N N O M 0: M M M M (0 c0 (0 O z W 0 00O otD °° � � cG NOD u) c0 °° � `° M � co °i C9 NO rnn ``� N °° ca "' ao � c0 `nN N � oCO ^ 00 0` C9 °' M 00OD � � ECG c° O °' O '`� M � O � N `r' � J O (0 d 00 c0 u) 0) a0 rn Ln O � rn N r` 00 00 a� 00 00 00 r` d ootT 00I� 1� (6t0 oc0 u; (0 4r- rin N0) " SOD (6 ^ (6n vito 6co cn dr- rin riO N04 (,100 (Vr- N ^ N (0 ( ir- Nt0 �iI- Nn NO Nn o LL X 0: r) M r) M r� M ) M M r0 M r) M r) M M 04 r7 X r7 M ri M r) M r7 M r� M r� M r) M K) M r> N r7 04 X 0= t7 M r7 M r) M M M r0 M r•) M r� tM M M ►� M r7 N w rn M M M r7 M r) M r� M r� M r� M M r7 M w r7 M r) M r7 M r) M r) M M M r7 M v) M r7 M r7 M w a. r') M r7 M � M r) M r) M r) M ri M v) M "0 M r, M V 13+50.00 115+00.00 16+50.00 360.00 3MOO 350.00 M0.00 0 I I 1 I I I I I I 1 1 1 0 300.00 ' 360.00 , I I I I I v I 1 --- � n N D: N cD° 1 O rn o N 1 3 cC; 3 O rn 0 MOO saaoo ss000 sao 00 Y a. N s ; ; o c) cv �� d o_ � ; d � 3, � � Cn o_ � a0g ; ; OH z Z W N Q'►� W 66 O LA_ O Or l O O 300.00 D:I W' M Q r7 D: W 360.00 i I _______________�________________ _______________' _____ ____ �yI1� ___________ __________ ________ ______________ _____________ ______________ _____________ _ ________ ______________ ____________ ___________ __________ ________ __ ______________ _____________ ______________ ________ _____________ __________ ____________ _____________ __________ ______ ______________ _____________ FY W 0 Et o_ r n 0. RET�4INING J rtOi LU RETAINING ; p ; FO w PR. 10' WALL 3A w co w I 1 0. W/rILL 3A 1 I 1 ; Y z 3 w # � PR. w � � � v�i cn w # 34aao s4aoo s4--- s4aoo w w � ao = , I W - � -a-=r- - w - --:GREENWAY-- - - - - -'- - - �-- - - ->- -� �- ----�GREENWAY --- - - - -- - - -- - - �;- -- -r.•r- -� � - -- - - - - � - - - - - - - - - - as 2.0� w -2.0� 0 2.0% -24 aw ; �W, M d PR. 10' LO W 45 RETAINING > w 4.1 WAIL #3B 2.0% -2.0% 0 2.0% ; w NI J w U_ GREENWAY c) O W Z J - T _ \ 340.00 ; lWi W W 340.00 z O ----- -- = ------=--- - -- --- _-- - - ----- ---- -- -'- -- --- --- -- _ T - ----- - !- - -- -- - --- -----------------= --------------=----------------=--- - -- - --------- ---- -- ------------- -------------- ------------ - ---- - - - --- - --- ---------------- --- - - - ---- - -� _ _ -- - -- - - --- - -- - - - - - --- u" 1 _` , 1 ' ' C I ' I \ L ' 1:1 STRUCTURAL \\ RETAINING . -a LL 2.0%- -2.0% -2.0%- 0) J C Z \ _ _` - - - - ZONE OF INFLUENCE \\ WAL4 #36 - - - - - - - - - - - - - - L - - - - 1 - - - - -;- - - - - - - - - - - - - - - - - - _ - - - O 0- -4- W �/ 330.00 \ -14,$q, 330.00 33o.oa ; - - - - - - - - - - _ _ '\, 330.00 li O J I.f 1 1 1 ---------------,-------------- ---, ---- ---.-- --- -- -- - - -- -- - - - ---- -------- -- ------- --------- --- ---- --- -- -- -- ------ --- - - - - -- -- -- ---- -- -- -- -------------------------------- -------------- - - - ---- - - --- -- -- -- -- - - -- -------------------------- I I I 00 I I I _ 15" ST - - - ; N J 8 ' WM 331.67 8" M t W 330.06 330.06 -d moo � " 15" ST 3M.00 --------------- - - -- ---- -- -- -- - - ----------- - ------------- ------------- ------------- -------------- ------------- -- -- -------- ------------- ------------- - ------ -------------- ------------- ----------- - -------------- - ---------- - - - - - - ------------- ----------------------------- L ' - --- -------- -- --- ---- - - - - y- ---- - - - - --- - -'- - - - - --- Q " - 24" ST'- - y -�- --'-- 8 WM t 327.04 '1:1 STRUCTURAL 30" ST 332.58 333.06 Q ;ZONE OF INFLUENCE 8" SA 8 SA 325.36 1 3 .60 0 25 --00 -- 00 --00 s20.00 324.45 3 � I I I I 1 � 1 8 SA o 326.75 = o ' ' N 320.00 ' 320.00 1 1 1 1 1 I I 1 1 I I 1 1 1 1 1 1 N N 310.00 i 310.00 310.00 310.00 313.00 313.00 •50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50A -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30 00 40.00 50.00 OE � O (� f� r% ^ O C) N 0: to (7) M 00 00 _ 00 O) tM 0: N N O O) 0) N M M to Cn r7 of d r) N tL� O c0 t\ O N N M cv 00 r'l }, r) rh M 0 0: C9 N CA cD M r co OR � (D N N O) 0) M n N 00 0` C9 I� 00 rz 1* O d O N OD O O Q� Q) r) n U) 0) O d 00 N r, o r, � 00 O 't (O n CO 00 M O W O N 0i06 06r � n r: r cnn c>; n 6r- 4n r7O rh 4 (0 r� c0 ricer N � NCC o o aiCA aocV r; � � O� � O� r` � BOO � Op r; O 0oO r: � Ito X 0: rr) M r� M r� M r7M r) M r) tM r) M r) M r7M r7 X 0: rriM r) M r) M r') M r-) M r--) to r) NN NN x r) M r) M r71'M � M r7M r�, M r) M MM rf, M re) W 0- � M r0M r7M r- M r) M r) re) r) M r) M MM w a r� M r� M r-) M r) 0) r) M r'') M riM r) M r� M r� M w 0_ �, M r� M � M 'r M r� M to M r7M r) M r7M � M 0 I N O N LO 114+00.00 15+50.00 117+00.00 360.00 360.00 J 360.00 i 360.00 3MOO 300.00 1 1 1 I I I 1 , 1 1 vi pp p o s O N N O 3 0 300.00 0_1 o a 3%00ir ---------------!----------------=--------------------------------'---------------------------------'----------------'--------- =---------------!---------------- -------------- ------------- ------ ---------- ------------ ------------ ------------ -- ---- -- ----- -- - -------------- ------------- ------ --------- ------------ --- - -- -- - ------- ------------- ----------- - �I(Y - --- -- �IW --- -� - - -J- - -�IW =- --- - - --- 0.1 --- �- - -- -b1 - -- -SIN - ---- - x ix CLY CL o OH 0- (n rrjJ 31 Ma` 0_ �(L O � a OH O 330.00 N I W 3ti0.00 p' I d LL 330.00 I M �'1 �I W M00 --------------- ---------- - - - -------'-- ---------' ----------- --------------- ------------ - - -------------- ---------- - -------------- ------------- ----- -----------� -- - - ---------- ------- ------------- ------------ -------------- ------------- ------ ---------- ------------ ---------- ----- ------------- ------------ r M 1 Q M 1 Q T --- - --- - - - q -- 1-r.•r W pr - --- - - --- -r-Q: - - - -5 Q -- -� Q- - Q � T --- r.) _J 3 ,.) .. z 7 .� W Q Q' o Li x 00 ar� d O w J K) RETAINING w r o t O x w a w � � r r7 PR. 10 QI o ,� W A a r) Lt w W 340.00 TILL 3 340.00 PR. 5' o W 'c) > r. ++� w -�+ - - -- - - --- - - - - - --- J M �GREENWAY PR 5 a o_ SIDEWALK ; a w - - - - - - -SIDEWALK, w I _GREENWAY ; PR. 10' RETAINING �� o - - - - - _ _ ►� a W s4o.00 N 2.0% n Q -2.0% 2.0% -15.3q �� - � - - - - � - - - - - - _ - - w 2.0 1.0% c7 �w > - %2.0 aL .0 0 W 'GREENWAY 0 2 .0% -2. %� cn WA A 2 0 e WALL 3 \I d # 34aoo I I I 1 1 1 \ RETAINING 2.0% _ _ - - - - - - _ - _ - _a wo - w -2.0% O ; 2.0% \; `24.4q RETAINING \ `\\ WAL4 #3B _ �\ WALL #3B sso.00 \ ssaao 0 _ _ -- -------------------------------- --------------- ---------------- -------- --- - ----------- --- --------- ----- -------- --- --------------------------------r-------------- -- - ---- -- - -- ------- r--- - -- ---T- - - - -- - _ _ (`/�J' - r ---------------- 0T- - -r--------- 1---------------- ------ ---------------------------- --------------- - --------------r----------------1----------------�-- S --I----------------�-- / \\ _ 15" ST 1 �8" 15" ST 8 WM 15" ST mM.� � 331.56 329.89 � 334.93 � I I 1 1 I I 1 I 1 1 328.61 334.65 1 I I 1 1 --------------- --------- -- -L-------------- ' - --- --- •--- ---- -- ---------------'--------------- - - y - -- -- -- -- - -- -- - -- -- ---L- ---- --------'---------------- -------------- ---- --J- -' - -- - - y - - - - -'----- - --------------- ---------------- --------------- ---------------- ------------- -- ------------- ----------------�---- --------- y-------------- -------w ,8" WM 1:1 STRUCTURAL 11 STRUCTURAL o 330.06 ; ZONE OF INFLUENCE 8" SA ZONE OF INFLUENCE u, 1 325.95 s2--- s2o 00 " 3 1 I I 1 1 � IT I 1 --- -�- --- --- -- --- - - --- --- --- -;- -;--32 SAJO --- --- --- ---- - 24" ST ; ; 7• 8" SA 1 324.90 326.06 o M.00 3=00 32000 320.00 Date: 07/14/2023 1 Scale: 1"=10' U 1 1 I I 1 I I 1 1 I 1 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 a_ 31a00 315.00 310.00 310.00 31a00 31a00 Drawn By: Checked By: -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.i -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 JRR CMR 0 O) O 00 •- M M N O c0 M M M _ _ 0 O M OD O O Project Number: fTY rn 0 rn 0 N rn M N d O co M 0) fTY 0) 0 0 rn 00 rn rn o M rn O co .0 r` o N N s Z O v o d 00 NM coM oM �t 00 cV (0 O v rn o M � OO � � d O � O a �t � co � co 0! d n ON o � oN o ^ NO � O rnOR ai oo r r- ^ co ^ 6 r 4 00 4 C ri � OO r` n 0 0i to ai O 0i to ai (6 ai ca Qi CA c\I Ci g Ci g �i O 6 � N * �i � r�i O �i � Of o OD 20-0��1-1149 r) M r� M r7M r7M � M r7M r7M r7M r7 X NM NM NM NM NM NM NM NM NN NN X D_' a � � d M rM r�jMt r�) f rtM MM w 0_ r7M r7M � M r7M r-, M r) M r7M r7M MM r7 w d MM riM r7M r7M r) M r') M r`) M r`) M to r� M w 0_ r) M MM to M I o Drawing Number: 0 0 I N 5 / 6 O O n N N r t6 n N N 00 In c�IIry� n ry�+ �y �y�y 24+50.00 GSJ'� OD.VV Cr L a OD :4 00 3 -00 386.9f7 � U a o I I I I } L m T L I I I I I I I I I I I Q p U i LLJ E Z _______________J________________1_____.__________J___________ L________________I____________-__-J-_______________ _ _____________1________________I________________ ___-____________I________________ _______________r_______________-1________________ _______________J________________1___________ ____L_______________1________________I_________ ____ T J O d U 1 ______-_ ' ________ ' ___�__ I I i ; I 3----1 ----- -------------- -- 1; CSS7(Llpp 3Tk.�G ; i 37fl,f- J I � -` - ` - -'C3 -- - --- -- - -I-- � --- -- -- --d d i I I 10Lr I I 1 � II �IW II - 'I I {7 II qn_- --- -- - ---` --------- --"_-`'_---- -- --= ~-----`-- - ----- r --------- - ----- I `-----iI -`_"_'-- ----- - --- * H Ld W CLVI /i J li � W - `-- ` -- - r. rc) W - f7 (� - ' ` -` - '--` -- -- -- -- -`---- - --- - u' r RETAINING W L woo - ; - ` --` I -- - - - ' ----- -- PR. 5' -----;------ I- ` - - - -- `-� � -`---- ---- -- - �- - PR. 1� - --` ` ---�- RETAENI1dG WALL - - I , I I I I . I - W �r --- J-L - - SIDEWALK W ti UW9 GREENWAY I I LI I ' _UJ ~ ___ a.__ PR I ``� - - - -- w 4J PR. 1+? OREENWAY -- -- r - - a 2.07 --2,O �5 2. I � I I _ ---- ----- a I I I ___- --- - SIDEWALK�- -- ------ - - - -2 -2.17` - - -- .Q --- - - -- y ---- -- - -- --- - - -- - -- I - I I w LL o rr r \ U `-"--- -------- i----'- --------------------------------�I---------------- IfM1 '� .r? I I I W..•W I I I I I I I 1:1 STRUCTURAL \� 1:1 STRUCTURAL 1 WM ZONE OF INFLUENCE � ---- -- 3W.13 - - --- --- ---- - --- --- --- -- --- ---- ---- - - _ - - - -- - - - --- -- - - --- --------------------------- - -- ----------------'- -- _ _ - - I I I I I I I I I I I I I I I I 'I I 347.13 I I I I I I I i I I I I I I I I I 1 I I I I I 1 I I I I I I I I I I -- ________________ _-___-_ •---- ' I I I 340.Op ----------------' -----ti----- I I I I I I I I 1 I •• - - 0 a I I ! I I I I I I I I I I 0 I I I I I I I I I LAI Z I I I I 3• � I I I I I Q Z -50.00 -40.00 -30-C-0 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.06 -50.00 -40,00 30-00 -20.00 -10.00 0-OD 10.00 20.00 30.00 40.00 50.00 60-DO w Z _ ir r- hl I, � r- co � K) V} r� C4 I* n Q tY o CD � r•] 00 10} � rr} rf] 0 V 00 V} r1 n ,0 V) a W J °� 0p } 4 4 'r; �v 00 M o rn 01 �- ,.r; C4 ,; r N �I C4 ni r r t, ¢ to 't Sri rrj: to ,� d ,� L6 � 0 � a) 6 � a Ir u7 LL7 � Ln LO ,n 10 � v3 0 0 IF: In rn in in 0 ,�, V) ,� � � � ¢ I�} -t L 5 � W) � u7 � 117 � W � V) zt W) 'T d w a r� N' v) M re) 1r] r� Fr} r'7 F"J f6 M M hr5 H} Y+? M] rri K} w ICL ram} 1+ r'-i � V) 1� N f'] P-) fn re! r� I+r} r� M� r'i 1) a 25�+50.05 26+50.00 'iBU_bb 3sD db O U I I I I I I I I I I I I I I I I I I I J a 370.00 O MOD ----------------- ' _ ________1_________ ____ ______________ _________ •. S�yyr I --- I /� ■ I I I , 0 I I 1 1 I r I 1 'i �lyAY'■ � I I 1•�• I I � � I I I I � � I I ----'--------- J .- -- -- ---------- 11 .37- OO----------- ------- �31 �] CPr i I� i i i -JfG40 N --- --- --- i - ------------ -- --- --- i h7 - --- - - ----'-- --- ------'- -- -- - - - - ---- -'- --- --- -- i�LI 0H I i � I I I � ' � ' � I I I 1 I � � � 1 IX ILJCL ,rpm 1 Lf) W I z Z I------ ' 4 ------- ------------r---------- T ' ---------I I ; !Z ; 360.DGMOO p --- r i - III i i----------- LO--T---------------I---` T •• Q L a '^ JLn --- -- 1.,7------------- w -- -----------ro-- U J Z I I ' LL PR. 5 - - - -- - -- - J - - --- - -- -- - -- ' 5� - --- - w r RETf41NII�Ea WALL 3 III SIDEWALK - - GfiEENWAY 3�c1_oo PR. -- - ----r-- "' L PR. 1C1' I 3�6OG7 = O -- - -- -- --- --- ---------- "� w 2,Q ----- ¢ ------ 1 5 ----------------'----------- -- -------------- -- -- -- --------- --�- -- - ---- ------- -------- ----------------------- -2.4 - a - - - ---- ---+ RETAINING 1 _ - -2.0 S'ICE'u4ALK w T� t;REEbVY�AY `n O Z U ¢ - - - - - -- - - �'~ ` � � r1- - - -- - -- - WALL T a � w I - T - -12.0 C� 2.0% -2:0 o 2.0 c) J W Z W JSO.OD ; - - i i ; MIN l i * i LL - ---- -------- - Z0) 0 O I I I I f I I I I I I I T 'i I f I ' ' I I I I I ----------- I I I I I 1 .T%00 • a O J I I I ssa.oD r - - --- -- - in ------ - - ---- - 00 -- - 348.Y3 f 12" a O - - ---- --- r 351.a6 1:1 STRUCTURAL W - 70NE OF INFLUENCE \ J ------ --------- ' ' '➢D ---------------I----------------------------�----------------- - I I I I � -----------� 1 I I ----- ----------i ---------------J-----------------------�-- ---- ------------- --- � I LU 1:1 STRUCTURAL - ' - --'----------------�_�-----�------�=--�------�---�---------�---�----•-�---------------- �---I 1 I I I I ZONE OF INFLUENCE _________-______________________-_______________ ----------------_________________________________ _____________________________-________________________________ ________________________________ --------------------------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 330.04 ' I I I I I i I I I I - I I � � � T � 1 T --I- T ---I------ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I N I I I I I I I 'I 3�3.G!D I I I I I 523.'DO 'J3A.QID I I I I I MOO -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 64.00 � U E C� �o pp cv "� r a (D 0) 'n r) r i V) c� 00 , Q N N c�[ F) M 0 v� 1C} u) m It 0) r4 Q1 to �. j L9 r i y c� irj � r r 7 c c 1 cv r 7 [y � C\6 � Cti! � StiG {tiI CO � {(? � I() �Q rl3 1(} Ll} {�'. l�1 IC} Lj} to l(] 0 l("y � lr! � � LL� V) l� 0 ktj �} �j Ln 0 Ili lI! L� lr] EY k � Tt t 4L} e� � d' Il� � to LLr � F`J r'] VI Y"} K} 1 tr] •'r P`1 F'] r']' ''r} r`] M' M' f`'1 11.I � M � N7 K} �7 to N] K} �} R� �? �+") r-1 rr1 �} P'} V) F'7 K) O I M N O N 7 25+50.0� 27+00.00 3W-00 30R00 WAD 3woo N I I I I I I I I I I I I I I I I I I I I I I I I I .� I I I I I I I I I I 1 I I I J I i w I I ----- -- --------------- I I I C14 ---- "---- ' --------------- -""---"------- --------------- --------------------""--- n- III ■ ---------------!--------- ----------------- PO- S'til I I U 370.00 ' --__ I ' 370.013 3M-00 ' 3t � 37D,00 ----------------- -- CL. ----- L --I ---- -----------------"----- ----- I T----------------'--- ------ ----� ----------------I----------1 ------------- CID C) __ __ W T W ______________ }� I Ij3L !A I ✓. .�y I ry I I I SS•L I I I D- i I N i 1 1 rlJ yL.�n�y �y T , I �y I > I "-' I --------�---- F) •J.LMW-- ----' ---------- -- ' T-------------- ° ----- ---------Id -- ----------- -� 1 --- -- - ------- - -- -- ------ ---- - - -----i --- -- T i-- W r * -- _J --- -- - - J w w z un M1 a RETAI INC WALL � rry � R�TAINING MALL 300,00 W ^- - T�41h�1A10 _V9+b.LL , - -- --- -- -II 3uaoo UO-00 SIDEWALK 5' : W w ( PR. 10' MOO I I I I I I I - Rt+�INll40 -' ALZ --- PR g - ------- --i --- -- a W ----- y----- ---- --F i-- W -------- - } P R., 1Q` ----- ---- r-__ r ---------+- -------- --[ - ;- ----------- - ------ - w --------- --------- WALK----------;--- --y - --� u1 --- . I � � I I a w � � GREEN+NAY ---, ---------------y--- E SIDEWALK J am. GREENWAYly M1O� -2.a a 2.�3." -2,07 2-0% , ________________'__-___ _____ I______ �- __ _ w _ ___YY 0_ __________S___L.V10________I________________ I _____________ __________ i I I ~\ p -- 0 - - \ - -- ---- - r-- --- - --- -- - ---- --- --- --- -'- --- -- --- ' -- - --- -- - -'-- ------ - -- '--- - -- -- - -- --- - ---'- ------ - U -- 2.0 ----a -- r O ,----- 'f T------- ---1------- -- T-------- r---------------1 T-------------"-"I I I I I I I O ---- - - - rT -- - h --- ---- 3iR.118 ------------- _ i i i ~N. 35[x�. / - - fl --- - -- r 1:1 STRUCTURAL 1.1 STRUCTURA --- - I ZONE OF INFLIJENCE O - - rr i - - - - - - - - � --- - 1:1 STRUCTURAL`-` - - - - - 12'• WM , � - - - - - � - :� - � - �- - I � I I I I 12* WM ZONE OF INFLUENCE � , � - , I I I , m R Ll _ �y '[ ZONE OF INFLUENCE �T1.�.J� I t - �,I- 34c'Y.1 aJ � ------------, I I I I _ 1_ � --- LUENCE-------- - - � �. - ___________________________ ____ ______________J__ -__________ _L___________ ________________A._______�-�__� L=______________J_____ I________________ ________________I___ J________________1________________L---------------J----------------A--------------------------------J_---------------J_________._______ N-. X Ld 1:1 STRUCTURAL o ZONE OF INFLUENCE I a. �jW00 I I I I I I ; N*00 (n •� I , I --- ----------------�----------------I ----------------------------- ' - ' ' ----------------------- � � I � I t � � 1 � I I I I I I I I Q I , I I I I I I I I I I Date: 07/14/2023 ,____-__- - -__, T- r , T T -__T__- ___-__________-_ _______________T__- T__- i •r -__ ---------------1- T_- -___r____- T--------------------------------- Scale:cae V 1 S 1"=10' C1. 330.Db I I I I I 336.00 39�a8 I I I I I 33�00 raven y: Checked By: - °"s -40= -30,04 -20,0C -10-00 0,00 10-00 20.00 O.QP 4a.oa 50.00 �C-CG -50,00 -40-00 -a0,00 -20-CO -10-00 0,00 10-00 20,DO 39100 40,00 50.00 60-00 JRR CMR i kn � w OD � p� �, C4 �y V) C4 V4 an 0 Project Number: U et 0 4n a a4 Oct a: 00 OD Lr� O �h � � sca � r l c� 0 r 20-0001-1149 rn LL7 tv co r~ a: w ►r7 r� In �D �; „ rr� rFf tt ¢ r�] rr ,r; u i ca Foci r- cow L~, e E#� to r- od 1� 06 r-, } I+ 47 -tIn ¢ 40 eri} � 0 � W) � 0 � 10 I � 1r � U) ¢ in sr to -I � �fiU[7 stto ti} 0 -• 0 -1In � 0 I W LL r'7 M r''S 1 ] frJ pr} M') rrl N� M P'I tr• 1'� r'7 1'�} N7 ! f''S W h? M r1 1'r"} f'] �7 to 1r} r•"3 Ff5 h-} i�7 r'7 1�} r''} 1rj M �'} o Drawing Number: O O 1 0 616 ❑ 70 140 210 280 I x...• _�' 1 i — '81'. i] ���- �k Ij �V A 1.. SCALE IN FEET �. Y+` '+t� •I II .. :n,` r:�t F si� .3� 2 � _ a. j r 1 � k I. NEW .i _ 'f 1ijj1 -• t - W LOT IFDTUR NEL1f LOT A 8 D9 A OPh1ENT} •+ �`1 ,LE I - ,o Cl+1 �� S FU TU RE DEVELOrMEN ..-.. - 1 I �I I..�C. ` a67,969 SF E.1 w �9 ¢:•.I r r '1 I' I ++ . G d , _ 4 A 59 sF ...y '4' .i: �� i, _1 t' Y'r% �- ' + .;'7.fi [ .•'� Z � � � .. �� .`.I T... _- IyIyyy - ,r d s ter' I•�', � • [ �� n NEW LOB• ---...�- .�N� ..l ,'� �� [4PEN SPACE)~ •••'- JJJJJJ - f� ■ � i NEW LO . OPEN BPAC . S ...,ti T-96 AC. 9Tx,337 SF ru,oa.s-i+s cr �`.7 r - �- i NEW LOT 8. 6.7711 AC. ".fir.•�' ••� �� r . �` "r a•re. '"1� uwo nwk rao. �hp r�r.: -'•" •294,E84 SF.'•".'S�a w�ur a �r -•— _ '- ., .o.�n n.�s.�.� s�.y. �'`�. 4 i'/r�fl�f` 'lam tl _���` `l .ti o.��.�• ��w rt:ru � spy hSEe1�- �'r ...4��°ae„•4r. �.e .'y wa�r er if--..' f,- ...• _+rir..-iusar s-�..:� `-=�J 9 i�F �+.+--7t� jv 3'nW'J1-�f WL�./U,�MY r'. � � 1-.—.v-:��.- I}A• - ...�.�.:N a•. � I % ' � _::-� _�. 1 - CR.7F}!'C 9C.�1LE sw LEGEN❑ Groundwater Monitoring Location ALL LOCATIONS ARE APPROXIMATE Source:Esri,Maxar,Earthstar Geographics,and the GIS User Community ADDRESS! HOWARD R©. & NC HwY, 55 29,5 ACRES CITY.STATE: CARY, NC PROJECT#: 20191014 APO LLO SOURCE' IMPACT MAPS PROVIDED BY CLIENT 0001•1149 DATE. FEBRUARY 2023 : 433881-ANDROAD AP NAME GROUNDWATER MONITORING (91SPANGLER LINA SPAN GALERENVIRONMENTALLEIGH,NORTH O.COM ENVIRONMENTAL, INC. (919)875-4288 LOCATIONS Action ID Number: SAW-2019-02355 County: Wake Permittee: Lennar Corporation, Attn: Stephen Dorn Project Name: Apollo 55 /Lennar/NC Highway 55 / Cary/ multi-family residential Date Verification Issued: 8/16/2023 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A. Determination of Jurisdiction: 1. ❑ There are waters on the above-described project area that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC § 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403).This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above-described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification,provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters within the above-described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification,provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ® The jurisdictional areas within the above-described project area have been identified under a previous action.Please reference jurisdictional determination issued 8/13/2020. Action ID: SAW-2019-02355. B. Basis For Determination: See the preliminary jurisdictional determination form dated 8/13/2020 C. Remarks: Note that Wetland WA was previously determined to be non-jurisdictional per an Approved Jurisdictional Determination(AJD)processed under the Navigable Waters Protection Rule(NWPR).However,the Corps may no longer finalize any regulatory action that relies on a NWPR AJD to document geographic jurisdiction.As such,for the purposes of this NWP 29/18 verification,Wetland WA is treated as a potential water of the US(via delineation concurrence)to allow verification to proceed.