Loading...
HomeMy WebLinkAboutSW4221202_Add Info_20230316 "STATE aFA' °E ROY COOPER 5 A Governor ELIZABETH S.BISER L,z. Secretary DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality March 16, 2023 BREC, PA Attn: Justin Church, PE 1520 Meadowview Drive Wilkesboro, NC 28697 AND Teramore Development Attn: Joe Strickland, Agent 214 Klumac Street, Suite 101 Salisbury, NC 28144 Subject: Request for Additional Information Stormwater Permit No. SW4221202 Dollar General - Lexington Davidson County Dear Mr. Church and Mr. Strickland: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on December 19, 2022. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. General MDC 3 —Please show the vegetated side slope of the SCM in the plan view. 2. Sand Filter MDC 6—Please specify that the sand media be ASTM C33 or equivalent on the plans. 3. Off-site Areas—Per 15A NCAC 02H .1003(3)(b) any off-site areas that drain to the SCM must be accounted for at their full build-out potential. This can be accomplished by having the property owners enter int a legal agreement limiting the amount of BUA and drainage area directed from the off-site property to the SCM or by assuming that the off- site area is 100% BUA (its full build-out potential). Please see note following these comments for more information. It is recommended to bypass this off-site drainage area around the proposed SCM. If that is not possible, accounting for the off-site area as 100% BUA should not be an issue since the SCM appears to be oversized (the provided design D E Q�� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLINA _ uepn ,t 0 B,im m W a,ar\ r 919.707.9200 volume of the SCM is greater than the minimum required design volume for the SCM and should be able to account for the off-site "BUA"). Please revise as needed. 4. Sediment Chamber/Sand Chamber Volumes—Please ensure that the 3" stone aggregate layer placed at the top of the sand layer is accounted for in the volume sizing of the sand chamber. The provided calculations do not take into account the volume of the stones that reduces (slightly) the volume provided in the sand chamber. Similarly, the volume of the sand chamber should not include the volume provided upstream of the weir (@ 788.25') separating the sediment chamber from the sand chamber. The volume provided in this portion of the vault should be included in the sediment chamber volume not the sand chamber volume (this results in sediment and sand chamber volumes that are more equivalent, which is required per Sand Filter MDC 2). 5. Please correct the following issues with the Application: a. Section IV, 10— See earlier comment with regard to off-site BUA, revise as needed. 6. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 7—Please include this value in accordance with 15A NCAC 02H .1003(4) & .1017(10). It is noted that there are no surface waters located on-site, however we ask that this value be included. Lines 8-10 can be left as-is since there are no surface waters associated with this project. b. Drainage Areas Page: i. Entire Site Column: 1. The entire site column is an accounting of the entire project area (similar to how the drainage area column is an accounting of the entire area draining to the SCM). When asked for the "drainage area" of the entire site, please enter the project area. Please note that any BUA that is located within the project area but not draining to the SCM should be included in this column (in addition to the BUA that is located within the project area and draining to the SCM). 2. Line 18—This item should reflect the value in Section IV, 8 of the Application (the %BUA for the entire site). NOTE: Since this site has existing BUA, the calculation method shown in 15A NCAC 02H .1003(1)(b) can be used to calculate this value. 3. Lines 19-21 —These items are not needed for the entire site column. ii. Sand Filter DA Column: 1. Line 11 —See earlier comment with regard to off-site BUA, revise as needed. 2. Line 20—The design volume of a sand filter is the volume that can be stored above the bottom of the sediment chamber/top of the sand layer(@788.0') and below the lowest bypass invert(weir @ 790.0'). It is equal to the sum of Lines 23 & 30 on the Sand Filter Page. c. Sand Filter Page: i. Line 2—This value may need to be revised to account for the off-site BUA. Please revise as needed. NOTE: This value is different than the design volume and is based on the drainage area to the SCM. ii. Line 19—Please elaborate in the additional information section (Line 43) that this design is a hybrid, in that there are portions of the design that are both open bottomed and closed bottomed. iii. Lines 23 & 30— See earlier comment with regard to the SCM chamber volumes. Revise as needed. iv. Line 29—The weir separating the sediment chamber from the sand chamber appears to be located at elevation 788.25'. v. Line 32—Please ensure that the portion of the vault upstream of the weir (@ 788.25') is not included in the sand chamber surface area. 7. Electronic Files—Please upload the electronic files for this project, as instructed via email sent on 12/20/2023, to our electronic repository (link in following comment). Electronic files are required per 15A NCAC 02H .1042(2). 8. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https:,[/edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 ii. For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. While it is not required, it is recommended that the off-site drainage from upstream properties be diverted around the SCM since the Applicant cannot maintain control over the development of property that they do not own. If the Applicant elects to account for off-site drainage, it must either be accounted for as 100% BUA (its full build out potential, or there must be a recorded legal agreement in place between the Applicant and the Owner of the upstream property in which the Owner of the upstream property agrees to record a deed restriction limiting the minimum/maximum amount of BUA on the upstream property that will be treated in the Applicant's SCM, the locations and sizes of access and drainage easements, how construction and/or ongoing maintenance costs will be handled, maintenance responsibility, a list of legal recourses available to each party should one party fail to hold up their end of the agreement, and any other related legal issues. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 15, 2023, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW4221202 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or(919) 707-3646. Sincerely, Jim Farkas State Stormwater Engineer DEMLR Post-Construction Stormwater Program cc: Winston-Salem Regional Office