HomeMy WebLinkAboutNC0064726_Inspection_20150630 AVA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
Governor Secretary
June 30, 2015
Town of East Bend IVEDID�NRIW�
Attn: Larry W.Adams, Mayor REL?�
108 West Main Street JUL U 601
East Bend, NC 27018
water Quality
SUBJECT: Compliance Evaluation Inspection Perm+ttino Sectlor'
East Bend Industrial Park Wastewater Treatment Plant
NPDES Permit: NC0064726
Yadkin County
Dear Mr. Adams:
Ron Boone of the Winston Salem Regional Office (WSRO) of the North Carolina Division of Water Resources
(DWR or the Division) conducted a compliance evaluation inspection of the East Bend Industrial Park Wastewater
Treatment Plant on June 16, 2015. The assistance and cooperation of Mark Matthews, Operator in Responsible Charge
(ORC), was greatly appreciated. An inspection report is attached for your records and the inspection findings are
summarized below.
The East Bend Industrial Park Wastewater Treatment Plant is located at the south end of Salem Trail, in East
Bend, Yadkin County, North Carolina, at approximate coordinates 36.211336°, -80.494283°. The Town of East Bend is
authorized to operate this 0.01 million-gallon-per-day (MGD) wastewater treatment plant, which consists of extended
aeration, settling, sludge holding, UV disinfection, and backup chlorination and dechlorination, and discharge treated
effluent from outfall 001 of said treatment works into an unnamed tributary to the Yadkin River, this section of which is
currently classified as Class WS-IV waters and is located in the Yadkin Pee-Dee River Basin.
SITE REVIEW
Mr. Boone reviewed the entire plant with Mr. Matthews. Everything was in good condition and well
maintained. Mr. Boone noted no discrepancies.
DOCUMENTATION REVIEW
Mr. Matthews had all required paperwork on hand. This includes discharge monitoring reports, laboratory
reports, chains of custody, operation and maintenance logs, operator visitation logs, laboratory certifications, etc. Mr.
Boone noted no discrepancies in his review of the paperwork.
There were no other discrepancies noted. Mr. Matthews is doing a good job operating and maintaining the
plant. Please keep up the good work in ensuring the plant is properly operated and maintained and meeting all the terms
and conditions of the permit. Please remember that violations of the permit are subject to enforcement actions not to
exceed $25,000 per day, per violation.
450 West Hanes Mill Road,Suite#300,Winston-Salem,North Carolina 27105
Phone:336-776-9800 l Internet:www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer—Made in part by recycled paper
If you have any questions regarding the inspection or this letter, please do not hesitate to contact Mr. Boone or
me at 336-776-9800. Thank you for your cooperation in this matter.
Sincerely,
.s.WC,/they
W. Corey Basinger
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments:
1. BIMS Inspection Report
CC: Central Files
NPDES Unit
WSRO/SWP Files
Town of East Bend
Attn: Mark Matthews, Operator in Responsible Charge
108 West Main Street
East Bend, NC 27018
United States Environmental Protection Agency Form Approved
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(he.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 E 2 [ I 3 I NC0064726 111 121 15/06/16 117 18 19 LI 201
211 11111 III 1111111111111111111111 11111111I1I r
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved--
671 1 70I LJ J
I 71 I � 72 LtiJ 1 731 1 174 751 1 1 1 1 1 180
Section B:FacilityData
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 10:00AM 15/06/16 14/06/01
East Bend Industrial Park WWTP
Exit Time/Date Permit Expiration Date
NC Hwy67E
11:00AM 15/06/16 18/12/31
East Bend NC 27018
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Mark C Matthews/ORC/336-679-3138/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Mark Matthews,108 W Main St East Bend NC 270181/336-699-4481/
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
▪ Permit w Flow Measurement • Operations&Maintenance • Records/Reports
►� Self-Monitoring Program MI Sludge Handling Disposal 1111 Facility Site Review • Effluent/Receiving Waters
a Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone WSRO WQ//336-776-9690/ I 2A I
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
•
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPOES yr/mo/day Inspection Type 1
31 NC0084726 I11 121 15/06/16 117 18 i
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and cheddists as necessary)
Please refer to the attached inspection summary letter.
Pages 2
Permit: NC0064726 Owner-Facility: East Bend Industrial Park WWTP
Inspection Date: 06/16/2015 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? • 0 0 0
Is the inspector granted access to all areas for inspection? • 0 0 0
Comment: None
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available,complete and current? • 0 0 0
Are all records maintained for 3 years(lab. reg. required 5 years)? • • 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
Is the chain-of-custody complete? • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs 111
Are DMRs complete:do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? 0 0 • 0
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator 0 • 0 0
on each shift?
Is the ORC visitation log available and current? • 0 0 0
Is the ORC certified at grade equal to or higher than the facility classification? • ❑ 0 0
Is the backup operator certified at one grade less or greater than the facility classification? • 0 0 0
Is a copy of the current NPDES permit available on site? • 0 0 0
Facility has copy of previous year's Annual Report on file for review? 0 0 • 0
Comment: None
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? • 0 0 0
Are all other parameters(excluding field parameters)performed by a certified lab? • 0 0 0
Page# 3
Permit NC0064726 Owner-Facility: East Bend Industrial Park WWTP
Inspection Date: 06/16/2015 Inspection Type: Compliance Evaluation
Laboratory Yes No NA NE
#Is the facility using a contract lab? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 0 U
Celsius)?
Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? 0 0 0 •
Incubator(BOD)set to 20.0 degrees Celsius+/-1.0 degrees? 0 0 0 •
Comment: None
Influent Sampling Yes No NA NE
#Is composite sampling flow proportional? 0 0 • 0
Is sample collected above side streams? • 0 0 0
Is proper volume collected? U 0 0 ❑
Is the tubing clean? 0 0 • ❑
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 • 0
Celsius)?
Is sampling performed according to the permit? U 0 0 0
Comment: None
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? 0 0 • 0
Is sample collected below all treatment units? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? 0 0 ■ 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 I 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency, sampling type • 0 0 0
representative)?
Comment: None
Upstream/Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit(frequency,sampling type,and U 0 0 0
sampling location)?
Comment: None
Bar Screens Yes No NA NE
Type of bar screen
Page# 4
Permit NC0064726 Owner-Facility: East Bend Industrial Park VVwTP
Inspection Date: 06/16/2015 Inspection Type: Compliance Evaluation
Bar Screens Yes No NA NE
a.Manual
b.Mechanical 0
Are the bars adequately screening debris? • 0 0 0
Is the screen free of excessive debris? • 0 0 0
Is disposal of screening in compliance? • 0 0 0
Is the unit in good condition? • 0 0 0
Comment: None
Equalization Basins Yes No NA NE
Is the basin aerated? • 0 0 0
Is the basin free of bypass lines or structures to the natural environment? • 0 0 0
Is the basin free of excessive grease? • 0 0 0
Are all pumps present? • 0 0 0
Are all pumps operable? • 0 0 0
Are float controls operable? • 0 0 0
Are audible and visual alarms operable? • 0 0 0
#Is basin size/volume adequate? • 0 0 0
Comment: None
Aeration Basins Yes No NA NE
Mode of operation Ext.Air
Type of aeration system Diffused
Is the basin free of dead spots? • 0 0 0
Are surface aerators and mixers operational? 0 0 • ❑
Are the diffusers operational? • 0 0 0
Is the foam the proper color for the treatment process? • 0 0 0
Does the foam cover less than 25%of the basin's surface? • 0 0 0
Is the DO level acceptable? 0 0 0 U
Is the DO level acceptable?(1.0 to 3.0 mg/I) 0 0 0 U
Comment: None
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? • 0 0 0
Page# 5
Permit: NC0064726 Owner-Facility: East Bend Industrial Park WWTP
Inspection Date: 06/16/2015 Inspection Type: Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the site free of excessive buildup of solids in center well of circular clarifier? 0 0 • 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 0 0
Is scum removal adequate? 111 0 0 ❑
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? 0 0 • 0
Is the return rate acceptable(low turbulence)? • 0 0 ❑
Is the overflow clear of excessive solids/pin floc? • 0 0 0
Is the sludge blanket level acceptable?(Approximately%of the sidewall depth) 0 0 0 III
Comment: None
Pumps-RAS-WAS Yes No NA NE
Are pumps in place? • 0 0 0
Are pumps operational? • 0 0 0
Are there adequate spare parts and supplies on site? • 0 0 0
Comment: None
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site? • 0 0 0
Are UV bulbs clean? • 0 0 ❑
Is UV intensity adequate? • 0 0 0
Is transmittance at or above designed level? IN ❑ 0 0
Is there a backup system on site? • 0 0 0
Is effluent clear and free of solids? • 0 0 0
Comment: None
Flow Measurement-Effluent Yes No NA NE
#Is flow meter used for reporting? • 0 0 0
Is flow meter calibrated annually? • 0 0 0
Is the flow meter operational? • 0 0 0
(If units are separated)Does the chart recorder match the flow meter? • 0 ❑ ❑
Comment: None
Page# 6
Permit: NC0064726 Owner-Facility: East Bend Industrial Park VWVTP
Inspection Date: 06/16/2015 Inspection Type: Compliance Evaluation
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • 0 0 0
Are the receiving water free of foam other than trace amounts and other debris? • 0 0 0
If effluent (diffuser pipes are required) are they operating properly? 0 0 II 0
Comment: None
Aerobic Digester Yes No NA NE
Is the capacity adequate? • 0 0 0
Is the mixing adequate? • 0 0 0
Is the site free of excessive foaming in the tank? • 0 0 0
#Is the odor acceptable? • 0 0 0
#Is tankage available for properly waste sludge? • ❑ 0 0
Comment: None
Operations&Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • 0 0 0
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable • 0 0 0
Solids, pH, DO, Sludge Judge,and other that are applicable?
Comment: None
Page# 7