HomeMy WebLinkAboutNCC203194_Annual Fee NOD Letter (2023 Fee)_20230816 ��r o
ROY COOPER
Cavernor
ELIZABETH S.BISER 4`d a
Setret�ry
DOUGLAS R.ANSEL NORTH CAROLINA
lntrnm Urre~ Environmental Qualify
8/16/2023
A Squared LLC
Attn:AJ Stillatano
51 Kilmayne Dr Suite 100
Cary, NC 27511
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC203194-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The
annual fee was billed on 7/1/2023 and was due on 8/1/2023.The annual fee applies to the following construction site:
Grove Ave Subdivision
738 Grove Avenue, Raleigh, NC
Wake County
Certificate of Coverage No. NCC203194
NC Reference No. NCG01-2020-3194
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@deq.nc.gov.
Sincerely,
William E.Vinson,Jr.
Chief of Program Operations
Division of Energy, Mineral,and Land Resources
D_E QJ Nmth Carolina Dgmrtmen of Environmental Quallty I Division of Energy.Mineral and Land Resou—s
512 North Salisbury Street 11612 Mail Ser%ic Cerdw I Rakgh.North Carolirw V091612
919.707.9200