HomeMy WebLinkAboutNC0085812_Expansion Alternatives_202308070 M co 0 co Hazen June 13, 2023 Technical Memorandum To: Union County Water (UCW) From: Zachary Kemak, Hazen Mike Parker, Hazen Reviewed by: Jim Struve, Hazen Grassy Branch Water Reclamation Facility Expansion Alternatives 1. Introduction The Grassy Branch Water Reclamation Facility (WRF) Expansion project will expand the treatment capacity of the WRF from 50,000 gallons per day (gpd) to 120,000 gpd. The two alternatives evaluated in this technical memorandum (TM) include summary of unit processes and cost comparison of: (1) installation of a parallel 70,000 gpd package train with flow equalization, sludge storage, aeration tanks, and clarifiers while maintaining the existing 50,000 gpd package train in its current configuration, and (2) installation of packaged 120,000 gpd aeration tanks and clarifiers while reconfiguring the existing package plant basins to operate as flow equalization volume. Both alternatives will include new influent pumping, chemical storage and feed, blowers, cloth disk filters, UV disinfection, effluent outfall piping, electrical service and switchgear, instrumentation & controls, and general site work. The contents of this TM are organized into the following sections: Section 2: Design Parameters Section 3: Alternatives Comparison Section 4: Cost Summary Section 5: Operational Considerations Hazen and Sawyer • 9101 Southern Pine Blvd, Suite 250 • Charlotte, NC 28273 • 704.357.3150 Hazen 2. Design Parameters 2.1 Background June 13, 2023 Union County Water (UCW) operates the facility under the National Pollutant Discharge Elimination System (NPDES) Permit number NC0085812. Effective May 1, 2022, UCW was issued updated effluent limits to the Grassy Branch WRF related to an application for a Special Order by Consent (SOC) to expand the facility from 50,000 gpd to 120,000 gpd. Table 2-1 summarizes the final effluent permit limits for five-day biochemical oxygen demand (BOD5), total suspended solids (TSS), ammonia (NH3-N), and fecal coliform (FC). Table 2-1: Final Effluent Permit Limits Parameter Monthly Average Weekly Average BOD5, mg/L (April 1 through October 31) 5.0 7.5 BOD5, mg/L (November 1 through March 31) 10.0 15.0 TSS, mg/L 30.0 45.0 NH3-N, mg/L (April 1 through October 31) 2.0 6.0 NH3-N, mg/L (November 1 through March 31) 4.0 12.0 Fecal Coliform, geometric mean/100mL 200 400 2.2 Influent Design Flows Influent design flows were developed by Hazen in the Grassy Branch WRF Process Evaluation TM (July 2019). Table 2-2 summarizes the proposed design Annual Average (AA), Maximum Month (MM), Maximum 7-day, and Maximum Day (MD) flows and peaking factors. Table 2-3 summarizes the proposed design annual average and maximum month concentrations and loads. The proposed design influent concentrations were selected based on historical data and typical values for medium strength domestic wastewater. Equipment proposals were requested based upon the design flow parameters listed in the two tables below. Secondary proposals were requested based upon the flow scenario with adequate equalization storage volume to limit peak flow through Grassy Branch WRF to "2Q", or 240,000 gpd. Union County Water (UCW) Page 2 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen Table 2-2: Proposed Influent Design Flows and Peaking Factors Parameter Flow, gpd Peaking Factors Annual Average 67,120 ---- Maximum Month 120,000 1.8 Maximum 7-day 201,000 3.0 Maximum Day 469,000 7.0 Table 2-3: Proposed Influent Design Concentrations and Loads June 13, 2023 Parameter AA Concentration, mg/L AA Load, Ibs/day MM Concentration, mg/L MM Load, Ibs/day TSS 250 140 300 167 BODS 250 140 300 167 TKN 40 22 48 27 NH3-N 26 15 31 17 TP 5.0 2.8 6.0 3.3 Union County Water (UCW) Page 3 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 3. Alternatives Comparison The following two design scenarios were examined: Alternative 1: Installation of a parallel 70,000 gpd package train with flow equalization, sludge storage, aeration tanks, and clarifiers while maintaining the existing 50,000 gpd package train in its current configuration. Alternative 2: Installation of package 120,000 gpd aeration tanks and clarifiers. Upon initial review of options for Alternative 2, the new package train is proposed to include a dedicated sludge holding tank which will allow the entire existing package train volume to be used as flow equalization storage volume. Flow equalization volume is commonly provided with package treatment plants as approximately 30% of the working volume of the aeration tanks, as noted under the Section 3.3 Alternative 1 discussion. Alternative 2 provides the opportunity for much higher volume based on using the existing basins. Both alternatives will incorporate the following new common facilities: • Influent Pumps & Pump Station • Lime Storage & Feed Pumps • Process Blowers • Cloth Disk Filter • UV Disinfection • Effluent Outfall & Piping • Electrical Service & Switchgear • Instrumentation & Controls • General Site Work 3.1 Site Layout Appendix A includes a Parcel Map and the FEMA Floodplain Map associated with the facility. A flow schematic of the existing facilities at Grassy Branch WRF is shown in Figure 3-1. Both alternatives will require extensive site grading to provide a level surface for the proposed facility expansion. The area due south of the existing treatment train where the proposed basins will be located is within the 100-year floodplain. USGS topographic maps denote a secondary stream feeding into Grassy Branch from the pond southwest of the WRF property. All work will likely be within the riparian buffers designated by Union County ordinance 70.030. The existing Union Power Cooperative power distribution utility pole for the site will need to be relocated to accommodate the proposed facility expansion. The existing 150-foot Duke Energy Transmission right-of-way corridor will restrict the available footprint for expansion on the southern portion of the property. Union County Water (UCW) Page 4 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 Temporary construction easements (TCEs) will need to be obtained from both Duke Energy and the adjacent property owner to construct the new facilities, perform site grading, and provide an adequate construction access corridor. A preliminary meeting was held with Mr. Will Johnson from Duke Energy on May 8, 2023 to discuss the proposed easements within the right-of-way, and Mr. Johnson noted that the proposed TCEs seem amenable and he will continue assisting us as we develop site plans with proposed easements. Preliminary TCEs are shown in Figure 3-2. The facility's potable water well will need to be decommissioned due to the proposed facility expansion. 3.2 Common Facilities Influent Pump Station Three 5-horsepower (HP) submersible pumps that will operate in two (2) duty and one (1) standby configuration are recommended to manage the wide range of flows resulting from the seasonal low flow condition and the approximate "4Q" seasonal high peak flow condition. The following design conditions were identified for influent pump selection: • Max Month Flow — 84 gpm at 30-feet TDH (C = 110) • Max Day Flow — 326 gpm at 40-feet TDH (C = 110) Variable frequency drives (VFDs) will be installed to manage variable flows. Submersible pump selections have been requested from Flygt. UCW uses Flygt pumps at their other wastewater treatment facilities and could streamline maintenance by maintaining a single pump manufacturer. Other pump manufacturers can be considered if UCW has additional preferences. Upon review of standard circular manhole dimensions and the proposed pump dimensions, the proposed three pumps will fit inside the existing 72-inch diameter manhole. The valve vault would require complete demolition and replacement, and new wall penetrations and guide rails would be set in the existing manhole. This work will require complete bypass pumping from an upstream manhole during construction. An alternative is to provide a new manhole adjacent to the existing manhole to facilitate construction without bypass pumping. The Section 4 Cost Summary includes a new manhole for project scoping; however, this will be further evaluated during design. Influent Screening The WRF currently relies on a manual bar rack located inside the package plant distribution box. The introduction of a new fine screen sized to meet the increased influent flows listed in Section 2 would increase the plant's screening reliability. A fine screen, such as the Lakeside Raptor Micro Strainer, could serve as a centralized screening facility for the WRF for Alternative 2. An initial selection would consist of the following features: Union County Water (UCW) Page 5 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 • 326 gpm capacity • Footprint: 17-feet x 3-feet • 2-HP Drive • Water Requirement: 15 gpm at 60 psi • 316 stainless steel construction • Weather protection package included The perforated screen opening can be selected to meet the desired screenings capture. '/4-inch openings are projected to generate approximately 3 cubic yards per month of screenings. The proposed screen includes a wash water system to rinse organics from the screenings in the conveyor section of the screen, however some organics carryover can be expected. Therefore, a wider opening (e.g. 'h-inch opening) may be selected to reduce screenings capture by approximately 50% and reduce organics carryover. Alternative 1 is scoped herein with a screen for each package train due to the complexity of piping from a single screen to both sets of aeration tanks. Cloth Disk Filter A single cloth disk filter system would replace the existing mixed media filter system at the WRF. Initial pricing and selection of cloth disk filter was based on the Kruger system, which is used at other UCW wastewater treatment facilities. The initial selection from Kruger consists of the following features: • 326 gpm capacity • Footprint: 100-square feet • Number of Discs: 2 • Backwash Requirement: 14 gpm Under Alternative 2, greater equalization storage volume may result in adequate volume to limit peak flow through the plant to "2Q", or 240,000 gpd. Per conversations with Kruger, this could allow the system selection to remove one of the two required disk filters (approximately $10,000 per disk filter). Given the minimal cost savings and the built-in system redundancy of having multiple disk filters, it is recommended to install the higher capacity unit. Facility layout and design will include a valved bypass pipe around the filter. Ultraviolet (UV) Disinfection A new UV Disinfection system will be required to meet the updated capacity requirements. The new system would allow for one duty and one standby unit (i.e. banks) to meet the peak day flow. The selection consists of the following features: Union County Water (UCW) Page 6 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 • 326 gpm capacity • Footprint: 24-feet x 3-feet • Number of Banks: 2 • Number of Lamps per Bank: 16 • UV Transmittance @ 253.7 nm: 65% (to be validated during design) • Can be installed in Series or Parallel The initial pricing and selection of a UV disinfection system was based on a TrojanUV system, which is used at other UCW wastewater facilities. Under Alternative 2, greater equalization storage volume may result in adequate volume to limit peak flow through the plant to "2Q", or 240,000 gpd. Per conversations with TrojanUV, this could adjust the system selection to eight (8) lamps per bank. The smaller flow compatible unit would result in a $20,000 reduction in capital costs. Given the minimal cost savings and reliability at higher flows, it is recommended to install the higher capacity unit. Miscellaneous Work The following describes miscellaneous work that will be required for both design alternatives: • New process piping will be installed to accommodate all related facility expansion work. For both alternatives, flow will be split between the existing treatment train and the proposed treatment train using valves and magnetic flow meters. • A new effluent outfall will be constructed adjacent to the existing outfall on Crooked Creek. • Lime, for supplementary alkalinity addition, will be pumped to the influent splitter box for each alternative. Currently lime is fed into the equalization portion of the package treatment plant. Operators have reported lime buildup at the feed point within the equalization tank. • Only the existing equalization and sludge holding tanks were repaired and recoated in the most recent upgrade project. The remaining interior tank coatings have reached the end of their useful service life and these tanks will need to be recoated. The existing interior aeration basin coatings (both alternatives) and clarifier coatings (Alternative 1 only) should be completely removed by sandblasting and the interior surfaces recoated with a high solids epoxy system specifically designated for wastewater immersion. After sandblasting, the cleaned steel surfaces should be inspected for damage and surface loss. Any damaged areas of steel walls, floors, welds or stiffeners should be repaired or replaced prior to recoating. • The existing mixed media filters and UV disinfection facilities will be demolished. • A new potable water line that will serve the facility to be installed and fed from the water main on Old Fish Road. • Electrical system including utility service, generator, automatic transfer switch, switchgear, and VFDs. Union County Water (UCW) Page 7 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 • Systems integration of all new facility improvements. 3.3 Alternative 1 Along with the proposed improvements described in Section 3.2, Alternative 1 will incorporate a new 70,000 gpd package treatment plant to operate in parallel to the existing 50,000 gpd package treatment train. A flow schematic for Alternative 1 is shown in Figure 3-3. Flow Equalization The existing package treatment plant has a flow equalization volume of 15,400 gallons (30% of treatment volume). The flow equalization tank has two dedicated 2-HP rotary lobe positive displacement (PD) blowers to supply process air to the system via coarse bubble diffusers. The proposed new package treatment plant would include a flow equalization chamber of approximately 23,100 gallons (33% of treatment volume) to provide a total equalization volume of 38,500 gallons. The proposed flow equalization tank would include a coarse bubble aeration system and three 5-HP rotary lobe PD blowers that would operate in two duty, one standby configuration. Equalized flow will be repumped to the influent distribution box of the package plant. Secondary Treatment The existing package treatment plant consists of two 25,000 gallon aeration basins and two 10-foot diameter secondary clarifiers. Waste activated sludge (WAS) from the secondary clarifiers is routed to a 9,000 gallon sludge holding tank. Aeration basins and sludge holding tanks utilize two 7.5-HP rotary lobe PD blowers to supply process air via coarse bubble diffusers. Currently plant staff must operate both blowers as duty blowers to meet the aeration demand. The proposed new package treatment plant would include two 35,000 gallon aeration basins and two 14- foot diameter secondary clarifiers. WAS from the proposed secondary clarifiers will be routed to a new 11,000 gallon sludge holding tank. The proposed aeration basins and sludge holding tanks would include a coarse bubble aeration system and three 10-HP rotary lobe PD blowers that would operate in a two duty, one standby configuration. The blowers would be configured to operate on VFDs to provide operation flexibility. The initial pricing and selection of a secondary treatment system was based on a Pro -Water Systems package treatment plant. The initial pricing and selection of aeration blowers was based on Aerzen rotary lobe PD blowers, which are used at other UCW wastewater facilities. 3.4 Alternative 2 Along with the proposed improvements described in Section 3.2, Alternative 2 will incorporate a new 120,000 gpd package treatment plant with new sludge storage volume. Union County Water (UCW) Page 8 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen Flow Equalization June 13, 2023 Under this alternative the two 25,000 gallon aeration tanks, the 9,000 gallon sludge holding tank, and the 15,400 gallon equalization tank in the existing package treatment plant would be consolidated to flow equalization volume thus creating a total flow equalization volume of 74,400 gallons (62% of treatment volume). The proposed flow equalization system is intended to leverage the existing blowers and diffusers. Equalized flow will be drained to the influent pump station manhole. Secondary Treatment The proposed new package treatment plant would include two 60,000 gallon aeration basins and two 16- feet diameter secondary clarifiers. WAS will be stored in a new sludge holding tank at the head of the proposed package treatment plant with a proposed volume of 19,000 gallons. This system would utilize the pressure from the return activated sludge (RAS) airlift system, like the currently installed package treatment plant, to transfer WAS from the secondary clarifiers to the sludge holding tank. A flow schematic for Alternative 2 is shown in Figure 3-4. UCW requested an option for WAS to be pumped to the sludge holding tank. This would require using RAS pumps in lieu of the standard airlift RAS conveyance provided with package plants. Section 4.1 provides an additive cost to include RAS pumps with WAS discharged using a modulating valve and flow meter. The proposed aeration basins would include a coarse bubble aeration system and three 15-HP rotary lobe PD blowers that would operate in a two duty, one standby configuration. The blowers would be configured to operate on VFDs to provide operation flexibility. A site layout of Alternative 2 is shown in Figure 3-5. The initial pricing and selections are based on Pro -Water Systems and Aerzen, similar to Alternative 1. The following work in the existing package treatment plant is recommended under Alternative 2: Interior walls of the existing package treatment plant will be partially removed to consolidate equalization volume. Holes will be cored into the dividing wall between the aeration tanks, sludge holding tank, and equalization tank to create a single equalization system. • The existing secondary clarifiers will be demolished. Union County Water (UCW) Page 9 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen 4. Cost Summary June 13, 2023 Table 4-1 summarizes the costs for the recommended expansion, supplemental alkalinity system, and existing system reconfigurations for each Design Scenario. Process and equipment proposals can be found in Appendix B. Table 4-1: Budgetary Capital Cost for Grassy Branch WRF Expansion and Repairs Parameter Alternative 1 Cost Alternative 2 Cost Steel Sandblasting, Repairs, and Recoating $500,000 $440,000 Influent Pumps and Manhole $200,000 $200,000 Influent Fine Screen $360,000 $180,000 Package Treatment Plant' $1,200,000 $1,300,000 Lime Chemical Feed System $50,000 $50,000 Cloth Disk Filters $360,000 $360,000 UV Disinfection System $130,000 $130,000 Outfall & Headwall $100,000 $100,000 Process Piping $120,000 $120,000 Sitework $350,000 $350,000 Electrical + Instrumentation & Controls $680,000 $650,000 Union Power Allowance $50,000 $50,000 Easement Acquisition & Easement Cost $10,000 $10,000 Subtotal1' $4,200,000 $4,000,000 Contingency (-10%) $400,000 $400,000 Subtotal $4,600,000 $4,400,000 Overhead and Profit (-25%) $1,100,000 $1,100,000 Subtotal $5,700,000 $5,500,000 Owner's Allowance (-5%) $300,000 $300,000 Construction Cost Estimate $6,000,000 $5,800,000 Engineering Services $1,300,000 $1,300,000 Total $7,300,000 $7,100,000 Notes: 1. Rounded up to the nearest $100,000 Union County Water (UCW) Page 10 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 4.1 Additional Cost Considerations In lieu of providing a package treatment plant system, the proposed aeration tanks and sludge holding tank may be designed and constructed as concrete tanks. This will require cast -in -place concrete walls, stainless steel air piping, and specified air diffuser grids. Additional construction cost is estimated to be $400,000 with additional engineering services of $50,000, thereby increasing the Project Total Cost by approximately $500,000 (for either alternative). In lieu of providing a conventional air lift RAS system with manual WAS outlet as typically provided with a package treatment plant system, RAS pumps with WAS control using an actuated valve and flow meter may be designed and constructed. This will include two or three RAS pumps, ductile iron piping, and control components. Additional construction cost is estimated to be $250,000 with additional engineering services of $20,000, thereby increasing the Project Total Cost by approximately $300,000 (for Alternative 2). Adding a restroom in the existing building can be evaluated and designed. Additional construction cost is estimated to be $75,000 with additional engineering services of $20,000, thereby increasing the Project Total Cost by approximately $100,000 (for either alternative). Union County Water (UCW) Page 11 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen June 13, 2023 5. Operational Considerations UCW may consider alternative configurations depending on how they choose to operate the selected alternatives, including the following: • Sole sourcing of certain equipment and systems could streamline operation and maintenance of UCW's wastewater treatment facilities. Package plants are available in two different options: (1) field assembled plants and (2) pre - manufactured plants. The existing package plant at Grassy Branch WRF is a field assembled plant. The existing package plant at Olde Sycamore WRF is a pre -manufactured plant. Pre - manufactured plants are limited to dimensions that allow for ground transport, whereas field assembled plants allow for basin dimensions to be optimized. Dimensions of field assembled plants and pre -manufactured plants for each alternative are available in Appendix B-3. Due to the limited available space for expansion, only the field assembled plants were considered in the development of the Section 4 Cost Summary. • Under Alternative 1, flow into each package treatment plant would be controlled by modulating valves and flowmeters. The modulating valves may create a restriction that could lead to nuisance valve clogging. A single screen channel upstream of the influent pump station may be considered as an alternate. • For both alternatives, the inclusion of an outlet connection at the proposed sludge holding tank for sludge hauling. • The proposed site plan should provide adequate access for sludge hauling and chemical delivery vehicles. Currently large transportation vehicles must back into the plant property. • Addition of a potable water service connection from Old Fish Road. Union County Water (UCW) Page 12 of 12 Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen Figures Figure 3-1: Existing Process Flow Schematic Figure 3-2: Proposed Temporary Construction Easement Plan Figure 3-3: Proposed Process Flow Schematic — Alternative 1 Figure 3-4: Proposed Process Flow Schematic — Alternative 2 Figure 3-5: Proposed Site Plan — Alternative 2 June 13, 2023 Union County Water (UCW) Grassy Branch Water Reclamation Facility Expansion Alternatives F-1 CROOKED CREEK 4" FM 4" DRAIN Q EQ BLOWERS LL ALK AIR SCOUR , BLOWER 0 INFLUENT 00 PUMP FFF STATION M MANUAL EFFLUENT BAR RACK SAMPLING BOX MIXED ULTRAVIOLET MEDIA DISINFECTION FILTERS AERATION TANKS CLARIFIERS PROCESS AERATION z BLOWERS Z Q Lu D co J m J- Z � U) N Q C� PROJECT M. PARKER DATE: MAY 2023 ENGINEER UNION COUNTY DESIGNED BY: z.KEMAK Hazen FIGURE 3-1 FiAZEN NO,, 30831-067 NORTH CAROLINA DRAWN BY: M. KARMANOCKY MECHANICAL CONTRACT NO.: CHECKEDBY J. STRUVE HAZEN AND SAWYER GRASSY BRANCH WRF EXISTING PROCESS FLOW SCHEMATIC DR WING 9101 SOUTHERN PINE BOULEVARD DO NOT USE FOR CHARLOTTE, NORTH CAROLINA28273 EXPANSION ALTERNATIVES M1 REV ISSUED FOR DATE BY CONSTRUCTION EQ PUMP WAS RAS 4" RAS/WAS EQ SH Sr { Oil 1 . - 4. • .. - �.. - ' l''' - ��.. ' .. � _ '' � � � � yr � � •�y,.i"ii .:� .y PARCEL NO.: 0812300780 - OWNER: EDWARDS, GEORGIA C J` ADDRESS: 1619 OLD FISH RD, MONROE, NC 28110 ='- — -_—z r R -�. '. r , �d� AL. CLIENT: FIGURE 3-2: TEMPORARY CONSTRUCTION EASEMENT PLAN PROJECT: LOCATION 0 40 80 160 240 320 400 MAP N Feet DATA: 1 inch = 125 feet DATE: / tiy. . +�".. `l+ '1K Union County Grassy Branch WRF Expansion Monroe, North Carolina Temporary Construction Easement Plan May 2023 Prepared By:ZEK NOTE: DUKE ENERGY TRANSMISSION LINE AND RIGHT-OF-WAY EXTENDS BEYOND WHAT IS SHOWN ON THIS MAP. EXACT LOCATION AND EXTENTS TO BE SURVEYED DURING DESIGN. 9 Legend Streams Reviewed By: MDP Duke Energy Transmission Line ;i 150-ft Duke Energy Right -of -Way Parcels Temporary Construction Easements Prepared by: Hazen 9101 Southern Pine Blvd. Suite 250 Charlotte, NC 28273 Phone: 704-357-3150 Firm NC License # C-0381 Prepared for: rs U N IONCOUNTY WATER H&S Proj. # 30831-067 CROOKED CREEK 4" FM EQ BLOWERS 4" DRAIN Q J J Q LL M H INFLUENT 00 PUMP STATION M FINE EFFLUENT SCREEN SAMPLING BOX ALK Q� AERATION TANKS CLARIFIERS IQ PROCESS AERATION BLOWERS ~ z w = D U EQ BLOWERS a z M I z < (V m Q C� FINE SCREEN ULTRAVIOLET ALK CLOTH DISINFECTION DISK FILTERS AERATION TANKS CLARIFIERS PROCESS AERATION BLOWERS PROJECT M. PARKER DATE: MAY 2023 ENGINEER UNION COUNTY DESIGNED BY: Z.KEMAK Hazen FIGURE 3-3 HAZENNo 30831-067 NORTH CAROLINA DRAWN BY: M. KARMANOCKY MECHANICAL CONTRACT NO.: PROPOSED PROCESS FLOW SCHEMATIC DRAWING CHECKED BY J. STRUVE HAZEN AND SAWYER GRASSY BRANCH WRF NUMBER: 9101 SOUTHERN PINE BOULEVARD ALTERNATIVE 1 DO NOT USE FOR CHARLOTTE, NORTH CAROLINA28273 EXPANSION ALTERNATIVES M2 REV ISSUED FOR DATE BY CONSTRUCTION EQ PUMP WAS RAS EQ SH EQ PUMP WAS RAS EQ SH CROOKED CREEK 4" FM EQ BLOWERS 4" DRAIN J J Q JL F— 0 INFLUENT 00 PUMP STATION M EFFLUENT SAMPLING BOX EQ TANK BLOWERS Y � Z W = D U J LL z Z z M � (N m Q C� FINE ULTRAVIOLET SCREEN DISINFECTION CLOTH ALK DISK FILTERS AERATION TANKS PROCESS AERATION CLARIFIERS BLOWERS PROJECT ENGINEER M. PARKER DO NOT USE FOR CONSTRUCTION Hazen HAZEN AND SAWYER 9101 SOUTHERN PINE BOULEVARD CHARLOTTE, NORTH CAROLINA28273 UNION COUNTY NORTH CAROLINA FIGURE 3-4 MECHANICAL PROPOSED PROCESS FLOW SCHEMATIC ALTERNATIVE 2 DATE: MAY 2023 DESIGNED BY: Z.KEMAK HAZENNo 30831-067 DRAWN BY: M. KARMANOCKY CONTRACT NO.: GRASSY BRANCH WRF EXPANSION ALTERNATIVES CHECKED BY J. STRUVE DRAWING NUMBER: M3 REV ISSUED FOR DATE BY EQ EQ EQ WAS RAS SH RAS/WAS s 9 Y 1 - ' ram' , e � .,, � �• -- -. 49 - 7 �G { PROPOSED FACILITIES: t 6 w - -w- 2_, _ ' 1 - INFLUENT PUMP STATION _ 4 5 t� f 2 - FINE SCREEN- 3 - PROCESS AERATION BLOWERS 3 4 - SLUDGE HOLDING / AERATION BASINS ' 5 - SECONDARY CLARIFIERS y y - 6 - CLOTH DISK FILTER 7 - ULTRAVIOLET DISINFECTIONOr 8 - EFFLUENT STRUCTURE �- } ,9 - OUTFALL STRUCTURE r' f 03 S Source: E-sri, M'axar, EarGhstar Geographies, and the GIS User Commun CLIENT: Union County Prepared by: Prepared for: FIGURE 3-5: PROPOSED SITE PLAN - ALTERNATIVE 2 PROJECT: Grassy Branch WRF Expansion LOCATION: Monroe, North Carolina flawn 0 15 30 60 90 120 150 MAP Site Plan 9101 Southern Pine Blvd. Suite 250 N Feet DATA: Ph Charlotte, NC 282 o U N IONCOUNTY 1 inch = 54 feet DATE: March 2023 Prepared By:ZEK Reviewed By: MDP Firm NC License # C-0381 WATER H&S Proj. # 30831-067 Hazen Appendix A: Site Information A-1: GIS Parcel Map A-2: FEMA Floodplain Map June 13, 2023 Union County Water (UCW) Grassy Branch Water Reclamation Facility Expansion Alternatives A-1 •� •�> �, w ; +.i' � � - - . ��', ' �- __ . 7r � -_sue � ' f { R - SY • �r _ .r .. t N _440 t. s l 0 GRASSY BRANCH WRF O -0 .. EXISTING POTABLE WATER WELL '�,, 4; • fi � — y • . ■ y�. M i i y � vN ID y i y Z - Source: E-sri, Max�ar, EarGhs'tar Geographies, and the GIS User Commun CLIENT: Union County Prepared by: Prepared for: EXISTING PARCEL MAP PROJECT: Grassy Branch WRF Expansion LOCATION: Monroe, North Carolina flawn 0 15 30 60 90 120 150 MAP Site Plan 9101 Southern Pine Blvd. Suite 250 N Feet DATA: Ph Charlotte, NC 282 o U N IONCOUNTY 1 inch = 54 feet DATE: March 2023 Prepared By:ZEK Reviewed By: MDP Firm NC License # C-0381 WATER H&S Proj. # 30831-067 zta ICI GRID NORTH ZONE X ,,-«; ZONE X .� Sp' MAP SCALE 1" = 500' (1 : 6,000) • 350 0 250 No TW 1,000 519 i C0 �` FEET S16 a METER `ZONE AE ZONE AE ," .� )OKI[I( �� 518 ,[/rnor lJrnnuh FFIR l o� 518 518 o F/s OZONE X r 519 Tell 520 oosIMM ` OF ZONE X UN ON CO 524 52,5a / .. -. na. 5 m,n.sw ..... ow.m. ay S�M D—FRI yW nag4/m.cre,nagx r ® PANEL 5%OJ FIRM a FLOOD INSURANCE RATE MAP NORTH CAROLINA ® m m PANEL 5550 i o�oc.,oa oa«m,owwaP roE..oaFa."nE� i ssmeMs �� cox � mad nw�.nnMtrm �m�nW�e9en en nd"Ke ,w W mm�m EFFECTIVEDATE MAP NUMBER a OCTOBER i6, 2008 3710555000J 10-- x N� a SwI Carolina Federal[ gncy Menagemem Age my Hazen Appendix B: Vendor Information B-1: Influent Pumps - Flygt B-2: Fine Screen - Lakeside B-3: Package Treatment Plant — Pro -Water Systems B-4: Process Aeration Blowers - Aerzen B-5: Cloth Disk Filters — Kruger B-6: Ultraviolet (UV) Disinfection System - TrojanUV June 13, 2023 Union County Water (UCW) Grassy Branch Water Reclamation Facility Expansion Alternatives Hazen Appendix B -1: Influent Pumps - F lygt NP 3085 SH 3-Adaptive 256 Patented self cleaning semi -open channel impeller, ideal for pumping in wastewater applications. Mod ularbased design with high adaptation grade. Technical specification Configuration Motor number N3085.060 15-09-2A L-W 4hp Impeller diameter 116 mm Pump information Impeller diameter 116 mm Discharge diameter 3 inch Inlet diameter 80 mm Maximum operating speed 3445 rpm Number of blades 2 Max. fluid temperature 40 °C Project Block Installation type P - Semi permanent, Wet Discharge diameter 3 inch FLYG'T a xylem brand Curves according to: Water, pure Water, pure [100%],39.2 °F,62.42 Ib/ft3,1.6891E-5 R 80 Head — — — — — 76 72 68 64 60 56 52 48 44 40 36 54.5 328 24 20 16 12 116mm 8 4 L-" 0 0 50 100 150 200 250 300 [US g.p.m.] Curve: ISO 9906 Configuration Material Impeller Hard -Iron TM Stator housing material Grey cast iron Created by Dan Joyce Created on 1/27/2023 Last update 1/27/2023 Rograra-rsion Dab version Usergroup(s) 66.0- 10959022(9u Id 36) 1W0231107MM Xyl—UM-INT NP 3085 SH 3-Adaptive 256 Technical specification Motor - General FLYG3' axylem brand Motor number Phases Rated speed Rated power N3085.060 15-09-2AL-W 3— 3445 rpm 4 hp 4hp ATEX approved Number of poles Rated current Stator variant No 2 4.9 A 12 Frequency Rated voltage Insulation class Type of Duty 60 Hz 460 V H 51 Version code 060 Motor - Technical Power factor- 1/1 Load Motor efficiency- 1/1 Load Total moment of inertia Starts per hour max. 0.92 82.2 % 0.152 lb ft2 30 Power factor -3/4Load Motor efficiency -3/4Load Starting current, direct starting 0.90 84.0 % 31 A Power factor -1/2Load Motor efficiency -1/2Load Starting current, star -delta 0.84 83.8% 10.3A Project Created by Dan Joyce Block Created on 1/27/2023 Last update 1/27/2023 Program version D---dd User group(s) 66.0- 10252022(Wild 36) 1520231107AIP1 Xylem:USA-INT NP 3085 SH 3-Adaptive 256 Performance curve FLYGT Duty point a xylem bi 8nd Flow Head 172 US g.p.m. 41.8 ft Curves according to: Water, purXater, pure [100%],39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/s lftl Head 2 , 1 80 76 72 68 64 60 5 52 48 44 41-8 ft 40 54.5 0 36 32 — -- 20 1 _ _... 12 i.. 256116mm 8- 4- 0 [%] Efficiency 54.1 50 Overall Efficiency 45 44.8 % 40 35 30 25 256116mm 20 256116mm 15 10 5 0 lhFl Power input P1 4.07 h 256116mm(P1) 3.5 a po 256 116mm (P2) 3.37 h 3.0 2.5 2.0 1.5 1.0 0.5 NPSHR-values 256116mm 2 24 22 20 18 17.5 ft .m. 16 172 US 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 [US g.p.m.1 Curve: ISO 9906 Dan Joyce Created on 1/27/2023 Last update 1/27/2023 Rogramversion Dab version Usergroup(s) 66.0- 10959022(Eb Id 36) 1W0231107MM Xyl—UM-INT NP 3085 SH 3-Adaptive 256 Duty Analysis IF a xylem brand Curves according to: Water, pure [100%] ; 39.2°F; 62.42lb/ft3; 1.6891E-5ft2/s Head 2 1 [ft] 80 76 72 68 64 60 56 52 48 44 41.8 ft 40 5°0 36 32 28 24 20 16 12 256 1 rrm[Ri rp 1] 256 116 [Pump 1+21 8 4 345 US g.p.m. 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 [US g.p.m.] Operating characteristics Pumps / Flow Head Shaft power Flow Head Shaft power Hydr.eff. Spec. Energy NPSHre Systems US p.p.m. ft hp US q.p.m. ft hp kWh/US MG ft 2 / 2 104 55.4 3.32 207 55.4 6.65 43.6 % 482 17.4 1 / 2 163 43.7 3.37 163 43.7 3.37 53.4 % 312 17.4 2 / 1 172 41.8 3.37 345 41.8 6.74 54.1 % 294 17.5 1 / 1 218 31.7 3.33 218 31.7 3.33 52.4 % 230 18.7 Project Created by Dan Joyce Block Created on 1/27/2023 Last update 1/27/2023 RN,am-rsbn Dab version Usergroup(s) 66.0 - 10959022 (e Id 36) 1W0231107MM Xyl—UM-INT NP 3085 SH 3-Adaptive 256 VFD Curve �G= a xylem bi 8nd Curves according to: Water, pure,39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/s [ft] 80 76 72 68 64 60 56 52 48 -A 44 40 36 32 28 24 20 16 12 8 4 0 [%] 40 30 20 10 0 [hp] 7.0 6.0 5.0 4.0 3.0 rrp [ft] 26 24 22 20 1 8 1 6 0 50 100 150 200 250 300 350 400 450 500 550 600 650 [US g.p.m.] Curve: ISO 9906 Project Created by Dan Joyce Block Created on 1/27/2023 Lastupdate 1/27/2023 25611 mm[Pu 1] 25611 [Pu 1+2] Efficiency y 25 116mm Pump 1 25 Pu 25 116mm Pump 1 25 11 Purr�i era I Ei Iclen + + in Sha pow er 256 1 m 1 +2] (P1) 256 IT 1+2](P2) 256 116mm [Pump 1] (P1) 256 116mm[Pump 1] (P2) 256116mm[Pump1] 25611 [Pu aues 1+2] R'ogram version Dab version User groups) 66.0-10252022(Bu itl 38) 1920231107A1 PI Xylem:U S4-INT NP 3085 SH 3-Adaptive 256 VFD Analysis [ft] 80 76 72 68 64 60 56 52 48 44 40 36 32 28 24 20 16 12 8 4 FLYG'T a xylem brand Curvpc arrnrdino to- Watpr nurp r1 n0a/1 - 39J°F- 67 d?lh/ft3- 1 _6Rg1 F-5ft2/c Head 1 7Z I \54.50o 256 1 41. 256 116 [Pump 1+2] 6mm [Ri Tp 1] g.p.m. 345 US 8 ft 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 [US g.p.m.] Operating Characteristics Pumps/ Frequency Flow Head Shaft power Flow Head Shaft power Hydr.eff. Specific energy NPSHre Systems US g.o.m. ft hp US g.p.m. ft hp kWh/US MG ft 2 / 2 60 Hz 104 55.4 3.32 207 55.4 6.65 43.6 % 482 17.4 1 / 2 60 Hz 163 43.7 3.37 163 43.7 3.37 53.4 % 312 17.4 2 / 1 60 Hz 172 41.8 3.37 345 41.8 6.74 54.1 % 294 17.5 1 / 1 60 Hz 218 31.7 3.33 218 31.7 3.33 52.4 % 230 18.7 Project Block Created by Dan Joyce Created on 1/27/2023 Last update 1/27/2023 Rogram-rsbn Dab version Usergroup(e) 66.0 - 10959022 (e Id 36) 1W0231107MM Xylem:US4-INT NP 3085 SH 3-Adaptive 256 Dimensional drawing FLYGT a xylem bi 8nd �-a 47,B his B 1� 154 s 9E I I I I zDE I I 1� 3 z Z rIN O 6 6 Z Z V YO It Ibs 150 8D PP M SH pK�, �a 1:20 200728 7332300 4m Project Created by Dan Joyce Block Created on 1/27/2023 Last update 1/27/2023 Rogra—rsbn Dab version Usergroup(s) 66.0 - 10959022 (B Id 36) 1W0231107MM )(yi..:UM-INT Hazen Appendix B-2: Fine Screen - Lakeside Raptor° Micro Straine Enw. /sw Single Operational Unit Screens, Compacts and Dewaters in One Process 1LK4 �v Raptor® Inclined Micro Strainer Removes Solids Efficiently The Lakeside Raptor® Micro Strainer is an efficient, proven screening technology for removal of inorganic solids that can be harmful to downstream equipment in municipal and industrial wastewater applications. Ideal for small treatment facilities, the Raptor® Micro Strainer utilizes a semicircular screenings basket to capture debris, such as plastics, hygienic articles and fibers. The Raptor® Micro Strainer features, including the screw conveyor, are all stainless steel construction (304 or 316) to handle the most severe conditions. At 35'to 45' angle of inclination, the Raptor® Micro Strainer provides high removal efficiency using a perforated plate or wedge wire basket with small openings ranging from 0.04 to 0.25 inches (1 to 6 mm). A central screw conveyor with a cleaning brush removes the captured solids from the screenings basket and transports the debris for disposal. As the solids are being conveyed, they are macerated to break down large fecal matter, and then washed using a two -stage screenings wash system to return organic material back to the wastewater stream. The washed screenings are compacted and dewatered prior to being discharged, thereby reducing the volume and weight to a dry solids content of 40 percent, ultimately reducing disposal cost. Raptor® Micro Strainer Raptor® Micro Strainer with Bagger with Weather Protection Yt� Superior design and construction • All stainless steel construction resists corrosion • Combines 4 processes in one unit (screens, washes, compacts and dewaters) • Dual spray wash system provides cleaner discharge screenings • Integrated compaction zone reduces volume and weight for reduced disposal cost • Enclosed transport tube and optional bagger attachment reduce odors • Hinged support to pivot screen out of channel for maintenance • Removable bearing bars promote longer brush life without disassembling the screen • Tank -mounted screens and explosion -proof designs are available • Optional weather protection system protects to 13' F below zero (minus 25' C) Round openings are available in sizes of 0.12 inch and larger Wedge wire screens are available in bar spacing of 0.12 inch and smaller Raptor® Vertical Micro Strainer for Applications with Limited Space The Lakeside Raptor® Vertical Micro Strainer is designed specifically to fit into limited access areas such as wet wells, submersible pump stations, and underground vaults. Similar to the inclined Raptor® Micro Strainer, it combines the functions of screening, compacting and conveying into a single unit. The Raptor® Vertical Micro Strainer incorporates a shafted screw with cleaning brush attached to the flights in the basket area to convey captured material for disposal. The split basket design provides easy access to the brush assembly. The screen basket is either perforated plate for wastewater applications or wedge wire for special/industrial applications. An optional slide rail system is available to allow easy removal of the screen from the wet well or vault. A quick connect flange is used to make sure the screen's head box lines up with the influent pipe connection. View of Slide Rail Raptot4 Vertical Micro and Head Box Strainer with Bagger Durability and performance • Shafted screw for most effective conveying Raptor® Vertical Dewatering/ .� • Accessible composite bearing bars Micro Strainer Compaction Zone • Split screenings basket for easy service • Optional slide rail system for screen removal • Discharge chute and optional bagger �' • Automated controls _ " Screw Conveyor Vertical applications you can rely on • Submersible pump stations and manholes • Tank -mounted packaged headworks ff • Package treatment systems Slide Rail • Industrial systems 11Z Influent Sewer "� W Head Box Connection _ Treatment equipment and process solutions from Lakeside Equipment Corporation Lakeside offers a wide range of equipment and systems for virtually all stages of wastewater treatment from influent through final discharge. Each process and equipment item that we supply is manufactured with one goal: to reliably improve the quality of our water resources in the most cost-effective way. We have been doing just that since 1928. Screw Pumps Grit Collection Open Screw Pumps SpiraGrit Enclosed Screw Pumps Aeroductor In -Line Grit Collector Raptor® Screening Raptor® Grit Washer Fine Screen Grit Classifier Micro Strainer H-PAC® Rotating Drum Screen Septage Acceptance Plant Clarification and Filtration Septage Complete Plant Spiraflo Clarifier Complete Plant Spiravac Clarifier Multi -Rake Bar Screen Full Surface Skimming Wash Press MicroStar® Filter Screen and Trash Rakes Biological Treatment Hydronic T Series CLR Process Hydronic K Series Magna Rotor Aerators & Accessories Hydronic Multifunctional Series Sequencing Batch Reactors Hydronic H Series Package Treatment Plants Catronic Series Submersible Mixers & Recirculation Pumps Monorail Series HY-TEC Screen CO-TEC Screen RO-TEC Screen Hauled Waste Receiving Systems Raptor® Septage Acceptance Plant Raptor' Septage Complete Plant Package Headworks Systems Raptor® Complete Plant H-PAC® Biological Treatment Systems CLR Process Package Treatment Plants Sequencing Batch Reactors .�_ LAKESIDE Tom Larsen �- - Budgetary Proposal a�EQUIPMENT CORPORATIDN 630/837 5640, ext. 229 January 27, 2023 wn�rr p� ,h�a:iaM s n�� rgls tjl@lakeside-equipment.com TO Hazen PROJECT Grassy Branch WRF EQUIPMENT UNIT CITY TOTAL Lakeside Raptor° Micro Strainer $103,200 1 $103,200 Model 12MS - 0.25 - 101 Due to the current volatility of stainless steel prices, budgetary cost of equipment may be subject to change. SPECIFICATION Unit Capacity: 1.14 mgd Maximum Headloss: 12 inches Inclination: 45 degrees Maximum Upstream Level: 20 inches Hole Diameter: 0.25 inch Nominal Basket Diameter: 10 inches Water Requirements: 15 gpm at 60 psi Transport Screw Diameter: 10 inches SCREEN AISI 304 stainless steel construction Structural support with anchorage Perforated plate screenings basket Screw conveyor with helical flights 2 hp drive unit 3-Zone wash system with solenoid valves Two (2) float switches EXCLUSIONS Grating across channel Handrail around perimeter of channel Screenings collection containers Piping, valves or fittings, unless noted otherwise Interconnecting conduit or wiring OPTIONAL ITEMS Extra screen transport tube length (per foot of extra vertical height) Explosion proof design package Weather protection system package Screenings bagger - individual or continuous type CONTROLPANEL NEMA 4X - 304 stainless steel main control panel No local control station Fusible disconnect switch with door handle Control power transformer Eaton E4 series intelligent relay controller Variable frequency drive with line reactor Selector switches Indicator lights Discharge chute Slide gates Manual bar screen Spare parts or special tools UNIT PRICE $900 $7,500 $16,900 $1,300 NOTES FOB: Chariton, Iowa Approvals: 6 to 8 weeks Freight: Freight allowed to jobsite Shipment after Approval: 22 to 28 weeks Start -Up Service: 2 days in 1 trip Weight per Screen: 1,400 Ibs Warranty: One (1) year Installation Time per Screen: 32 hours 1022 E. Devon Avenue • P.O. Box 8448 • Bartlett, Illinois 60103 phone: 630/837-5640 • fax: 630/837-5647 www.lakeside-equipment.com 8:35a 10/24/107 DXF » A» 3/4" NPT WATER SUPPLY FOR SPRAY WASH w/LOCAL SHUT-OFF VALVE - BY OTHERS i FLOW CD — — EMERGENCY BYPASS CHANNEL EMERGENCY BYPASS GATE "A" Y ENGINEER MANUAL BAR SCREEN PI AN Uh 51KAIGH I CHANNEL 12MS PART No A B C D E E G H STD -101 8'-5 1/2" 12'-4 1 /4" 7'-7 1 /4" 5-11 1 /2" 10'-2 3/4" 16'-7 1 /2" 7'-2 1 /2" 9'-3 5/8" SECTION "A -A" WASH WATER SOLENOID VALVES LOCAL NEMA 4/7/9 CONTROL STATION DUAL FLOAT SWITCHES TRANSPORT TUBE HEATER (OPTIONAL) DRIVE MOTOR I CONTROL INTERCONNECTION DIAGRAM ALL CONDUIT AND WIRE CONNECTIONS BETWEEN CONTROL PANEL AND SCREEN COMPONENTS BY OTHERS. EMERGENCY BYPASS GATE TOP ELEV. 2" ABOVE MAX. W.L. NOTES: 1) WHEN HEAT SYSTEM IS TO BE SUPPLIED, CHANNEL WIDTH TO BE 24" IF CHANNEL DEPTH IS GREATER THAN 3'-6". 2) CONTACT LAKESIDE FOR ANY ADDITIONAL REQUIREMENTS OR QUESTIONS. 3) KEEP TOP OF CENTER CHANNEL WALL AS LOW AS POSSIBLE TO ALLOW EASE OF CONSTRUCTION AND MAINTENANCE. 4) WATER SUPPLY LINES AND ELECTRICAL CONNECTIONS TO BE FLEXIBLE or QUICK DISCONNECT TYPE TO ALLOW UNIT TO PIVOT OUT OF CHANNEL. 5) BE SURE UPSTREAM PIPING IS NOT SURCHARGED AT MAX. W.L. 6) FOR PROPER APPLICATION OF THIS PRODUCT REFER TO RMI-95, LAKESIDE SCREEN GENERAL DESIGN NOTES. ,k\ /tMT WM-OM MVM BARRACK 9-27-07 s/x1c I ILAKESIDE DR. R.D. DATE3-1-95 RAPTOR'S QRDASED TO CURRENT STANDARD 112-18-06 G.F. SNn)ER cI. — 2501 2" MICRO STRAINER D-51152-S rK REVISIONS DATC DR. NKD. REVISIONS DATC DR. NKD. REVISIONS DATE DR. REVISIONS DATC DR. EQUIPMENT CORPORATION Cl�. 4-16-95 Hazen Appendix B-3: Package Treatment Plant Systems Pro -Water NOTE: CIRCULAR MECHANICAL CLARIFIER TO INCLUDE: 1, PAINTED MILD STEEL 4-INCH SLUDGE DRAW -OFF THREADED COUPLING CONNECTION 2. PAINTED MILD STEEL 3-INCH FLANGED SKIMMER CONNECTION 3. PAINTED MILD STEEL 8-INCH FLANGE INLET PIPE 4. PAINTED MILD STEEL 8-INCH FLANGED OUTLET PIPE 5. TWO (2) RAKE ARM ASSEMBLIES HOT DIPPED GALVANIZED 6. ONE (1) SKIMMER ARM ASSEMBLY HOT DIPPED GALVANIZED 7. ONE (1) SCUM COLLECTION BOX HOT DIPPED GALVANIZED 8. ONE (1) 4" CENTER SHAFT WITH 60" STILLING WELL STAINLESS STEEL 9. PAINTED STEEL BRIDGES WITH HOT DIPPED GALVANIZED BAR GRATING AND 1 4 INCH 2 LINE HANDRAIL WITH TOE PLATE 10. ONE SIDED 90 DEGREE SAW -TOOTH ALUMINUM WEIR PLATE, WEIRS 1 4 " DEEP 6 INCHES ON CENTER 24 11. FULL CIRCUMFERENCE BAFFLE WALL HOT DIPPED GALVANIZED COATING PREPARATION ON ALL A36 MILD STEEL BY: SANDBLAST SSPC-10 INTERIOR SURFACES SANDBLAST SSPC-6 EXTERIOR SURFACES COAT: TNEMEC N69 HI -BUILD EPDXYLINE 12-16 MILS DFT BASE COLORS ROTATING EQUIPMENT TO INCLUDE: WINSMITH GEAR DRIVE WITH SUPPORTING COMPONENTS TORQUE LIMITING MECHANISM BY SHEAR PIN BALDOR ELECTRIC MOTOR NEMA 4X CONTROL PANEL 24 CM-70 70 000 G P D 23,100 GALLON FLOW EQUALIZATION 11,000 GALLON SLUDGE DIGESTER 70,000 GALLON EXTENDED AERATION PLAN VIEW CM-120 1201000 G P D 28'0" 19,000 GALLON SLUDGE DIGESTER 8'10" 4'3" 120,000 GALLON EXTENDED AERATION 39'-1" 26' 0" 23,100 GALLON 70,000 GALLON PLAN VEW FLOW EQUALIZATION 11,000 GALLON EXTENDED AERATION SLUDGE DIGESTER A, PLAN VIW 1 2' 6" 0 SLUDGE AIRLIFT RETURI 14'-0" 8" ELEVATION 14'-0" 4'0" 3'-9 3'-6" 2 CONTR DRIVE UNIT PANEL WEIR TROUGH _ 1 > - 2 „ 2' O"di i -2" IGE TURN SKIMMERARM INVERT OFB PIPE. - WATER LE 8"0 OUTLET SCUM TROUGH Nil TROUGH 3.0 SCUM PIPE -CLARIFIER INLET PIPE I SCUM BAFFLE STILLING WELL ADJUSTMENT RODS RAKE ARMS SLUDGE BASIN W. L. CROSS-SECTION 9'-6„ TVDIrAI 1 ELEVATION SIDE STIFFENE BOTTOM STIFFENER 12'-0" 12'-0" 2 CONTR DRIVE UNIT PANEL 2'O" - 2" T T/ AGE ruRN WEIR TROUGH SKIMMER ARM WATER LEVEL 6"0 OUTLET SCUMTROUGH WEIR TROUGH 3 -0 SCUM PIPE e "O CLARIFIER INLET PIPE a SCUM BAFFLE STILLING WELL ADJUSTMENT RODS RAKE ARMS SLUDGE BASIN 8' 1 ELEVATION NOTE CONCEPT FOR TWO DIFFERENT FLOW SCENARIOS: 70,000 GALLONS PER DAY (GPD) 120,000 GALLONS PER DAY (GPD) LOOK AT: 70,000 GPD C-MODEL INCLUDE FLOW EQUALIZATION CHAMBER (23,100 GAL) SLUDGE DIGESTER (11,000 GAL) DUALIZED AERATION CHAMBER (70,000 GAL / 35,000 GAL PER TRAIN) TWO (2) CIRCULAR MECHANICAL CLARIFIER (19,670 GAL) 70,000 GPD FIELD ERECT INCLUDE: FLOW EQUALIZATION (23,100 GAL) SLUDGE DIGESTER (11,000 GAL) DUALIZED AERATION CHAMBER (70,000 GAL / 35,000 GAL PER TRAIN) TWO (2) CIRCULAR MECHANICAL CLARIFIER (26,580 GAL) 120,000 GPD C-MODEL SLUDGE DIGESTER (19,000 GAL) DUALIZED AERATION CHAMBER (120,000 GALLON / 60,000 GAL PER TRAIN) TWO (2) CIRCULAR MECHANICAL CLARIFIER (32,285 GALLONS) 120,000 GPD FIELD ERECT SLUDGE DIGESTER (19,000 GAL) DUALIZED AERATION CHAMBER (120,000 GAL / 60,000 GAL PER TRAIN) CIRCULAR MECHANICAL CLARIFIER (34,538 GAL) EACH MODEL WILL INCLUDE THE BASIC COMPONENTS: 1. RAS / WAS 4-INCH SLUDGE PIPE ASSEMBLY WITH DIVERSION VALVES 4 INCH LINES FOR AIR-LIFT ON RISER PIPE 2. SKIMMER / SCUM 3-INCH PIPE ASSEMBLY WITH NO VALVES 4 INCH LINES FOR AIR-LIFT ON RISER PIPE 3. STAINLESS FLOW CONTROL BOX WITH 1-INCH BAR SCREEN AND TWO 8-INCH DRAINS FOR DUALIZED FLOW, WHERE FLOW EQUALIZATION TANK IS APPLIED 4. ONE (1) FLANGED INLET STUB 8-INCH 5. FLOW EQUALIZATION PUMP RISER PIPES WITH GUIDE RAILS, WHERE FLOW EQUALIZATION IS APPLIED 6. TWO (2) EMERGENCY OVERFLOW BY-PASS PIPES 8-INCH 7. TWO (2) DECANT ASSEMBLIES 3-INCH 8. OUTLET BAFFLE AERATION BASIN TO CLARIFIER 9. DIFFUSER DROP ASSEMBLIES 1 4 INCH STAINLESS STEEL PLACED EVERY 6-FEET IN AERATION BASINS ONE ROW PER BASIN (2 BASINS PER TREATMENT PLANT) 10. EACH PLANT TO HAVE 6-INCH STAINLESS STEEL AIR HEADER PER AERATION TRAIN WITH EXTENSION TO SLUDGE DIGESTER AND STUB OUT FOR GROUND MOUNTED BLOWERS 11. EACH PLANT TO HAVE 3-INCH STAINLESS AIR HEADER PER FLOW EQUALIZATION TANK WITH STUB OUT FOR GROUND MOUNTED BLOWERS 12. EMERGENCY AIR BY-PASS LINE ONE PER PLANT, FLOW EQUALIZATION TO SLUDGE DIGESTER, WITH VALVES. 13. ACCESS BRIDGE WITH HOT DIPPED GALVANIZED GRATING 3-FEET WIDE WITH 2-LINE 1 4 INCH HOT DIPPED GALVANIZED HANDRAIL WITH TOE PLATE 14. EACH PLANT TO HAVE ONE HOT DIPPED GALVANIZED STAIR FOR ACCESS 1 2'- 6* 0 SLUDGE AIRLIFT RETURI FM- 120 120,000 G P D 120,000 GALLON 19,000 GALLON EXTENDED AERATION SLUDGE DIGESTER PLAN VIEW Pro -Water Systems, Inc, Process Equipment for Waste Water Treatment Pro -Water Model and Flow: 70K & 120K Concept Date: February 9, 2023 Scale: 3/ 16" = 1' DRAWING: CONCEPT PLAN Pro -Water Plant Serves: Pro -Water Plant Location: GRASSY BRANCH Pro -Water Representative: GARRY HAGER Dimensions: A: AS SHOWN B: C: D: E: H: L: M: Q: S: Plant Length: NOTE: VALVE PIPING PLACED FOR ACCESSIBILITY. A36 MILD STEEL SHALL BE SSPC-SP10 ALL INTERIOR SURFACES SSPC-SP6 ALL EXTERIOR SURFACES TWO COAT SYSTEM TNEMEC N69 12-16 FINAL DFT SOLID PIGMENTED COLORS ONLY 14'-0 IM ELEVATION -0 CONCEPT DRAWING FOR INITIAL PRICING ONLY Hazen Appendix B-4: Process Aeration Blowers — Amen AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 AERZEN Reference Number: ENV-355074.0 Re: Grassy Branch WRF To: Zachary Kemak Firm - Hazen and Sawyer email - Zkemak@hazenandsawyer.com nhnna - 704-941-6044 AERZEN Representative Info: Name - Shane Eckley e-mail - seckley@ew2.net phone - (704) 996-0894 OAERZEN AERZEN Proposal Prepared By: Name - James Marx email - james.marx@aerzen.com phone - (484) 798-7619 AERZEN Regional Manager: Name - Lukas Massier e-mail - lukas.massier@aerzen.com phone - (470) 716 4874 22-Mar-23 Grassy Branch Scenario 1 Blowers Model: GM 10 S DN 80 Performance Data: Design Design Min Min Intake volume, handled at intake condition cfm 336 112 45 Volume handled at normal condition scfm 300 100 40 Mass flow Ib/h 1,382 463 187 Density at inlet conditions Ib/cf 0.068 0.068 0.068 Relative humidity 4) 65% 65% 65% Intake pressure (abs.) psia 14.4 14.4 14.4 Outlet pressure (abs.) psia 19.9 19.9 19.9 Discharge pressure psig 5.5 5.5 5.5 Intake temperature °F 100 100 100 Discharge temperature °F 172 192 239 Main rotor speed rpm 4,004 1,718 1,036 Power consumption at coupling bHp 12 4 3 % of maximum % 83% 36% 22% Motor Rating HP 15 Motor Speed rpm 3,600 1,515 914 Full load motor efficiency % 91.0% Motor frame 254T Tolerance on flow & power ± 5 % Sound pressure level w/o enclosure dB(A) 88 `Measured in free field at 3ft. distance from the outline of the unit Sound pressure level w/ enclosure dB(A) 67 'does not include system piping noise (tol. ± 2 dB(A)). Weights & Dimensions: Discharge connection ANSI Flange Y Blower torso weight lbs. 760 Blower motor weight lbs. 236 Blower pkg weight lbs. 996 Envelope dim.* L x W x H in. 45 x 37 x 51 Cooling Fan shaft driven * non binding dimensions includes, inlet filter silencer, relief valve, check valve, and flex connector AERZEN USA CORPORATION 108 Independence Way AERZEN Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 GM10SDN80 Aerzen Generation 5 Delta Blower Package consists of the following components, assembled in our factory. Aerzen Rotary Lobe Blower GM Series • Narrow V-belt drive • V-belt drive guard • First fill of Delta Lube 06 oil • Service Accessories • Inlet filter -silencer, G4 per EN 779 (equivalent to MERV 7) • Discharge Silencer, Reactive type, integrated with base frame • Spring loaded pressure relief valve(s), sized for full flow • Set of vibration isolating mounts • Discharge manifold with externally accessible integrated check valve • Hinged motor support as automatic belt tensioning device • Sound enclosure, galvanized steel, fire retardant HDP foam construction • 3" ANSI Flanged discharge connection • Simplified ISO-1217, Annex B test report(s) • Submittal data, hard copy • O&M manual, hard copy • Factory set PRV to 10.9 psig • Blower Warranty 24/30 • Domestic packaging Drive motor • Motor 15 HP, 2-pole, NEMA, TEFC, 208-230/460 V / 60 Hz, NEMA Premium Efficiency,254T • Motor thermostats, one per phase @ 155 deg C • Motor shaft grounding ring • Motor Warranty 3-Yr Motor Instrumentation and Controls • 4 in. Encl. P1, P2, T2 Gauges & T2 Switch Spare Parts (per unit) • Set of 3 spare air filter(s) • Set of 3 spare belt set(s) • Set of 2 Delta Lube 06 - 1 gallon(s) Start Up & Services • 1 trip(s), 2 day(s) total installation, startup, & training Freight • Freight to jobsite AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 Pricing AERZEN Quantity: 3 Description Price Total 7 Quantity (3) Aerzen Blower package as described above c/o: Shane Eckley Price does not include any tax or VAT. Delivery Terms: CIP Aerzen USA Coateville, PA General Terms: This offer is subject to Aerzen Standard Terms and Conditions (AMUSA.08.22.001) Payment Terms: Net 30 days, 20% of order value from date of accepted purchase order. 30% of order value upon release for production for material procurement. 50% of order value from date of readiness to ship. Submittals: 4-6 weeks after receipt of purchase order Delivery Time: presently approximately 20 weeks after technical release by customer. Warranty: 24 months after start up, 30 months after delivery, whichever comes first. `Maintenance must be performed per the Instruction Manual using Aerzen spare parts. *Equipment not manufactured by Aerzen will carry the manufacturer's standard warranty. Quote Validity: All prices and lead times quoted are valid for 30 days from the date stated on the quotation. AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 AERZEN Reference Number: ENV-355074.0 Re: Grassy Branch WRF To: Zachary Kemak Firm - Hazen and Sawyer email - Zkemak@hazenandsawyer.com nhnna - 704-941-6044 AERZEN Representative Info: Name - Shane Eckley e-mail - seckley@ew2.net phone - (704) 996-0894 OAERZEN AERZEN Proposal Prepared By: Name - James Marx email - james.marx@aerzen.com phone - (484) 798-7619 AERZEN Regional Manager: Name - Lukas Massier e-mail - lukas.massier@aerzen.com phone - (470) 716 4874 Grassy Branch Scenario 2 Aeration Blowers Model: GM 7 L DN 80 22-Mar-23 Performance Data: Design Design Min min Intake volume, handled at intake condition cfm 196 65 30 Volume handled at normal condition scfm 175 58 27 Mass flow Ib/h 809 269 126 Density at inlet conditions Ib/cf 0.068 0.068 0.068 Relative humidity 4) 65% 65% 65% Intake pressure (abs.) psia 14.4 14.4 14.4 Outlet pressure (abs.) psia 19.9 19.9 19.9 Discharge pressure psig 5.5 5.5 5.5 Intake temperature °F 100 100 100 Discharge temperature °F 180 214 273 Main rotor speed rpm 3,465 1,658 1,181 Power consumption at coupling bHp 7 3 2 % of maximum % 72% 35% 25% Motor Rating HP 10 Motor Speed rpm 3,600 1,682 1,198 Full load motor efficiency % 90.2% Motor frame 215T Tolerance on flow & power ± 5 % Sound pressure level w/o enclosure dB(A) 87 `Measured in free field at 3ft. distance from the outline of the unit Sound pressure level w/ enclosure dB(A) 71 'does not include system piping noise (tol. ± 2 dB(A)). Weights & Dimensions: Discharge connection ANSI Flange Y Blower torso weight lbs. 695 Blower motor weight lbs. 163 Blower pkg weight lbs. 858 Envelope dim.* L x W x H in. 45 x 37 x 51 Cooling Fan shaft driven * non binding dimensions includes, inlet filter silencer, relief valve, check valve, and flex connector AERZEN USA CORPORATION 108 Independence Way AERZEN Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 GM7LDN80 Aerzen Generation 5 Delta Blower Package consists of the following components, assembled in our factory. Aerzen Rotary Lobe Blower GM Series • Narrow V-belt drive • V-belt drive guard • First fill of Delta Lube 06 oil • Service Accessories • Inlet filter -silencer, G4 per EN 779 (equivalent to MERV 7) • Discharge Silencer, Reactive type, integrated with base frame • Spring loaded pressure relief valve(s), sized for full flow • Set of vibration isolating mounts • Discharge manifold with externally accessible integrated check valve • Hinged motor support as automatic belt tensioning device • Sound enclosure, galvanized steel, fire retardant HDP foam construction • 3" ANSI Flanged discharge connection • Simplified ISO-1217, Annex B test report(s) • Submittal data, hard copy • O&M manual, hard copy • Factory set PRV to 10.9 psig • Blower Warranty 24/30 • Domestic packaging Drive motor • Motor 10 HP, 2-pole, NEMA, TEFC, 208-230/460 V / 60 Hz, NEMA Premium Efficiency,215T • Motor thermostats, one per phase @ 155 deg C • Motor shaft grounding ring • Motor Warranty 3-Yr Motor Instrumentation and Controls • 4 in. Encl. P1, P2, T2 Gauges & T2 Switch Spare Parts (per unit) • Set of 3 spare air filter(s) • Set of 3 spare belt set(s) • Set of 1 Delta Lube 06 - 1 gallon(s) Start Up & Services • 1 trip(s), 2 day(s) total installation, startup, & training Freight • Freight to jobsite AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 Pricing AERZEN Quantity: 3 Description Price Total 7 Quantity (3) Aerzen Blower package as described above c/o: Shane Eckley Price does not include any tax or VAT. Delivery Terms: CIP Aerzen USA Coateville, PA General Terms: This offer is subject to Aerzen Standard Terms and Conditions (AMUSA.08.22.001) Payment Terms: Net 30 days, 20% of order value from date of accepted purchase order. 30% of order value upon release for production for material procurement. 50% of order value from date of readiness to ship. Submittals: 4-6 weeks after receipt of purchase order Delivery Time: presently approximately 20 weeks after technical release by customer. Warranty: 24 months after start up, 30 months after delivery, whichever comes first. `Maintenance must be performed per the Instruction Manual using Aerzen spare parts. *Equipment not manufactured by Aerzen will carry the manufacturer's standard warranty. Quote Validity: All prices and lead times quoted are valid for 30 days from the date stated on the quotation. AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 AERZEN Reference Number: ENV-355074.0 Re: Grassy Branch WRF To: Zachary Kemak Firm - Hazen and Sawyer email - Zkemak@hazenandsawyer.com nhnna- 704-941-6044 AERZEN Representative Info: Name - Shane Eckley e-mail - seckley@ew2.net phone- (704)996-0894 OAERZEN 22-Mar-23 AERZEN Proposal Prepared By: Name - James Marx email - james.marx@aerzen.com phone - (484) 798-7619 AERZEN Regional Manager: Name - Lukas Massier e-mail - lukas.massier@aerzen.com phone - (470) 716 4874 Grassy Branch Scenario 2 EQ Blowers Model: GM 3 S DN 50 Performance Data: Design Intake volume, handled at intake condition cfm 90 Volume handled at normal condition scfm 80 Mass flow Ib/h 370 Density at inlet conditions Ib/cf 0.068 Relative humidity 4) 65% Intake pressure (abs.) psia 14.4 Outlet pressure (abs.) psia 19.9 Discharge pressure psig 5.5 Intake temperature °F 100 Discharge temperature °F 183 Main rotor speed rpm 3,394 Power consumption at coupling bHp 3 % of maximum % 71 % Motor Rating HP 5 Motor Speed rpm 3,600 Full load motor efficiency % 88.5% Motor frame 184T Tolerance on flow & power ± 5 % Sound pressure level w/o enclosure dB(A) 90 Sound pressure level w/ enclosure dB(A) 63 Min 17 15 71 0.068 65% 14.4 19.9 5.5 100 277 1,336 1 28% 1,382 *Measured in free field at 3ft. distance from the outline of the unit *does not include system piping noise (tol. ± 2 dB(A)). Weights & Dimensions: Discharge connection ANSI Flange Y Blower torso weight lbs. 415 Blower motor weight lbs. 100 Blower pkg weight lbs. 515 Envelope dim.* L x W x H in. 32 x 32 x 42 Cooling Fan shaft driven * non binding dimensions includes, inlet filter silencer, relief valve, check valve, and flex connector AERZEN USA CORPORATION 108 Independence Way AERZEN Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 GM3SDN50 Aerzen Generation 5 Delta Blower Package consists of the following components, assembled in our factory. Aerzen Rotary Lobe Blower GM Series • Narrow V-belt drive • V-belt drive guard • First fill of Delta Lube 06 oil • Service Accessories • Inlet filter -silencer, G4 per EN 779 (equivalent to MERV 7) • Discharge Silencer, Reactive type, integrated with base frame • Spring loaded pressure relief valve(s), sized for full flow • Set of vibration isolating mounts • Discharge manifold with externally accessible integrated check valve • Hinged motor support as automatic belt tensioning device • Sound enclosure, galvanized steel, fire retardant HDP foam construction • 3" ANSI Flanged discharge connection • Simplified ISO-1217, Annex B test report(s) • Submittal data, hard copy • O&M manual, hard copy • Factory set PRV to 10.9 psig • Blower Warranty 24/30 • Domestic packaging Drive motor • Motor 5 HP, 2-pole, NEMA, TEFC, 208-230/460 V / 60 Hz, NEMA Premium Efficiency,184T • Motor thermostats, one per phase @ 155 deg C • Motor shaft grounding ring • Motor Warranty 3-Yr Motor Instrumentation and Controls • 2.5 in. Encl. P1, P2 Gauges Spare Parts (per unit) • Set of 33 spare air filter(s) • Set of 3 spare belt set(s) • Set of 1 Delta Lube 06 - 1 gallon(s) Start Up & Services • 1 trip(s), 2 day(s) total installation, startup, & training Freight • Freight to jobsite AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 Pricing AERZEN Quantity: 3 Description Price Total 7 Quantity (3) Aerzen Blower package as described above c/o: Shane Eckley Price does not include any tax or VAT. Delivery Terms: CIP Aerzen USA Coateville, PA General Terms: This offer is subject to Aerzen Standard Terms and Conditions (AMUSA.08.22.001) Payment Terms: Net 30 days, 20% of order value from date of accepted purchase order. 30% of order value upon release for production for material procurement. 50% of order value from date of readiness to ship. Submittals: 4-6 weeks after receipt of purchase order Delivery Time: presently approximately 20 weeks after technical release by customer. Warranty: 24 months after start up, 30 months after delivery, whichever comes first. `Maintenance must be performed per the Instruction Manual using Aerzen spare parts. *Equipment not manufactured by Aerzen will carry the manufacturer's standard warranty. Quote Validity: All prices and lead times quoted are valid for 30 days from the date stated on the quotation. AERZEN USA CORPORATION 108 Independence Way AERZEN Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 Aerzen USA Corp Terms and Conditions of Sale New Equipment Packages AERZEN USA CORP (hereinafter called "Seller') agrees to sell equipment (hereinafter called the "Goods") to the Purchaser (hereinafter called the "Buyer") on the following terms and conditions of sale. Any alteration of these terms and conditions shall have no force or effect unless agreed to in writing by an officer of Seller or such other authorized signatory of Seller as designated in writing by Seller. The terms and conditions as set forth herein and our quotation or as modified by written agreement shall constitute the entire agreement (hereinafter called the "Agreement") between Seller and Buyer. A failure by either party to enforce any rights under this Agreement shall not be deemed to constitute a waiver of those or any other rights under this Agreement. These Terms and Conditions of Sale shall be deemed accepted by Buyer upon Seller's receipt of Purchase Order from Buyer. No condition stated by Buyer shall be binding upon Seller if in conflict with, inconsistent with, or in addition to the Terms and Conditions of Sale, unless expressly accepted in a writing signed by Seller. In the event of conflict or differences in the terms or conditions of Buyer's Purchase Order and the Terms and Conditions of Sale herein, the Terms and Conditions of Sale shall govern. 1. ORDERS: All orders are subject to acceptance and approval by Seller's credit department and are not binding until and unless so approved and accepted. Written acknowledgement of an order shall constitute acceptance and will thereby be a binding contract which cannot be modified or cancelled by Buyer without written consent of Seller. 2. PRICES AND PAYMENTS: All prices are quoted and payable in U.S. dollars, unless otherwise noted. Quoted prices shall remain valid for thirty days unless written communication is received by Seller prior to such time. Seller reserves the right to restrict or modify the terms of payment or to require payment prior to shipment if, in Seller's opinion, the Buyer's financial condition or other circumstances do not warrant shipment on the terms originally specified in the Agreement. Unless expressly agreed to in writing on a specific contract or order, pending satisfactory credit review, Seller standard payment terms are: (a) For orders under $100,000 the payment terms shall be Net 30 days from date of shipment, with no retainage held. (b) For orders over $100,000 the following terms shall apply, assuming satisfactory credit review: 20 % of order value from date of accepted purchase order. 30 % of order value upon release for production for material procurement. 50 % of order value at readiness to ship. (c) All invoices are to be paid Net 30 days. (d) In those cases where progress payments are required, all work on the order will cease if payment is not received in accordance with the payment schedule. (a) Payment retention will not be allowed. In the instance where an invoice is disputed, all undisputed portions remain payable within Net 30 days terms. (f) Interest at the rate of one and one-half percent (1 %%) per month or at the highest rate allowed by law, whichever is less, shall be charged to all overdue accounts. Buyer will reimburse Seller for all costs and expenses (including attorney's fees and the costs of bringing any action) incurred in collecting any amounts past due. 3. TAXES: The prices quoted do not include any taxes. Any sales tax, use tax, excise tax, goods, and service tax (GST), value added tax (VAT), customs tax, or other tax of any nature whatsoever imposed by any government authority on the transaction between Seller and Buyer (plus interest and penalties thereon, if any) shall be paid by the Buyer in addition to the prices quoted and invoiced. In the event that Seller is required to pay any such taxes, Buyer shall reimburse Seller on demand. At the time of an order, Buyer shall provide Seller with any tax exemption certificates or other documents acceptable to the taxing or customs authorities. 4. LIABILITY: Seller's liability with respect to the Goods sold hereunder shall be limited to the warranty provided in Section 10 of these Terms and Conditions and shall be limited to the contract price. In no event shall Seller be liable for special, indirect, incidental, consequential or punitive damages, or expenses incurred by Buyer, Buyer's customers or any third party, whether arising from breach of contract, warranty, negligence, strict liability in tort or other theories of law or equity, including, but not limited to, liquidated damages, loss of profits or revenue, loss of use, cost of capital, cost of substitutes, downtime, service interruption, or any other type of economic loss. 5. SHIPPING OR SERVICE DATE: Shipping or service dates are estimates and not a guarantee of a particular day of shipment or service. Seller shall not be liable in any way for any default or delay in shipping or service due to contingencies beyond its control which prevent or interfere with Seller making delivery or providing service on the date specified, including, but not limited to, war, restraints affecting shipping, delivery of materials or credit as a result of war or war restrictions, non -arrival, delay or failure to procure materials as a result of war or war restrictions, rationing of fuel, strikes, lockouts, fires, bombings, terrorism, accidents, floods, droughts, cyber-attacks, and any other contingency affecting Seller, its suppliers, or subcontractors: and Seller shall have the right to cancel a contract of sale or to extend the shipping or service date in the event that one or more of such contingencies prevents or delays shipment or service. 6. DELIVERY: a. Title and Risk of Loss: All products will be delivered EXW Aerzen, Coatesville, PA unless otherwise agreed by both parties in writing. In no event shall Seller be liable for any delay in delivery or assume any liability in connection with shipment, nor shall the carrier be deemed an agent of Seller. b. Acceptance of Products: Buyer shall inspect all products promptly upon receipt. All claims by Buyer, except only those provided for under Warranty clauses, which are not asserted in writing by Buyer within five (5) days of receipt are waived. c. Delays by Buyer: In the event that Goods cannot be shipped to Buyer when ready due to any cause not attributable to Seller, upon notice to Buyer, Seller may ship such Goods to storage. If such Goods are placed in storage, including storage at the facility where manufactured, the following conditions shall apply: (i) all risk of loss or damage shall thereupon pass to Buyer; (ii) title shall transfer to Buyer; (iii) any amounts otherwise payable to Seller upon delivery shall be payable upon presentation of Seller's invoice; (iv) the Goods shall be deemed as shipped and the warranty time period shall commence; (v) all expenses incurred by Seller, such as preparation for and placement into storage, handling, inspection, preservation, insurance, storage and removal charges, and any taxes shall be payable by Buyer; and (vi) when conditions permit and upon payment of all amounts due hereunder, Seller shall resume delivery of Goods to the originally agreed point of delivery. d. Delays in Inspection: In the event that Goods cannot be shipped to Buyer when ready due to delay of Buyer's in -person inspection, upon notice to Buyer, such delay shall constitute a waiver of Buyer's rights of in -person inspection and rejection and an acceptance by Buyer of an inspection report, as determined and compiled at Seller's sole discretion. Such acceptance shall be in addition to the remedies for Delays by Buyer outlined herein. e. Partial Shipment: Partial shipment of an order will not be made without Buyer's knowledge or consent. In the event a complete shipment cannot be made by the required date, Buyer will be promptly notified. If partial shipment with Buyers approval is made, excess freight charges, if any, will be billed to the Buyer. 7. CANCELLATION, POSTPONEMENT OR CHANGE ORDERS: Orders are not subject to Buyer's cancellation, postponement, or change in specifications, shipping schedules, or other conditions originally agreed upon without Seller's written consent and then only upon agreement to compensate Seller for any or all losses caused by such cancellation, postponement, or changes. Cancellation charges of between twenty percent (20%) and one hundred percent (100%) of the total price of the contract will be invoiced, as determined at Seller's sole discretion, depending on the status of completion plus Seller's non -recoverable costs attributed to the Buyers order. If Seller's manufacturing is delayed or postponed by Buyer, Seller shall be entitled to an equitable price adjustment. If Buyer delay extends for more than ninety (90) days and the parties have not agreed upon a revised basis for continuing the work at the end of the delay, including adjustment of the price, then upon written notice, Seller may terminate the order whereupon Buyer shall promptly pay Seller its cancellation charges as described herein. Seller may terminate the Agreement without liability to Buyer if (i) Buyer shall materially breach any of the terms and conditions of this Agreement and shall fail to cure such material breach within five (5) days after written notice from Seller; or (ii) Buyer shall become insolvent; or (iii) a petition under the Bankruptcy Act or any other insolvency law shall be filed by or against Buyer; or (iv) Buyer shall make assignment for the benefit of creditors; or (v) Buyer shall fail to make timely payment of any obligation owed by it to Seller; or (vi) in the event Seller reasonably believes that Buyer is unable to make full and prompt payment as required hereunder. Buyer agrees that it shall, no later than thirty (30) days following the effective date of termination of this Agreement, pay all monies owed to Seller at the time of any such termination regardless of any terms of payment that may have otherwise been granted to Buyer by Seller. Seller shall not by reason of its termination of this Agreement in accordance with the terms hereof, be liable to Buyer for compensation or reimbursement of any damages on account of loss of profits or prospective profits on anticipated sales, or on commitments in connection with the business or goodwill of Buyer or otherwise or for direct, indirect, punitive, special, consequential, or liquidated damages. 8. LIMITED WARRANTY: Unless otherwise stated in Seller's quotation, Seller warrants the products and parts that it manufactures will be free from defect in materials and workmanship for twenty-four (24) months from the date of start-up, but not to exceed thirty (30) months from the date of readiness to ship. Performance warranties (if any) are limited to those specifically included in Seller's proposal and identified as such. Goods (including accessories, components, and parts thereof) furnished by Seller but manufactured by others is not warranted by Seller and such Goods shall carry the warranty (if any) which the manufacturer has conveyed to Seller to the extent it can be passed on to the Buyer. Seller shall, upon prompt written notice by the Buyer, correct such non -conformities, at Seller's option, by either repair or replacement. All such defective Goods shall follow the RMA policy set forth in clause 10. and be sent at Buyer's expense directly to Seller's headquarters located at 108 Independence Way, Coatesville, PA, USA, 19320 or an Authorized Service Center. Shipment of repaired or replacement Goods will be at Seller's expense. Seller warrants any Goods repaired or replaced pursuant to the above warranty to be free from defects in materials and workmanship for the longer of: (a) a period of ninety (90) days after the start-up of such repaired or replaced Goods or (b) the period remaining on the warranty. Goods must be maintained per Seller's Operations and Maintenance manual, including proper maintenance documentation, for the warranty to remain valid. THE FOREGOING WARRANTIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES, WHETHER WRITTEN, ORAL, OR IMPLIED, INCLUDING ANY WARRANTY OF DCO C(1D��A�I(`C \ ADD(`LJA\ITADII — 1D CITAICCC C D A DAD-1 11 AD DI IDD— \I/l DCDDCCCAITATI/l AI h(1 1-71ll AI nD—ADDAK— 1­1 1 InIKIn DI 17 K-71 IRIITCII — AERZEN USA CORPORATION 108 Independence Way Coatesville, PA 19320 Tel. (610) 380-0244 ♦ Fax. (610) 380-0278 AERZEN STATEMENTS OF CAPACITY, SUITABILITY FOR USE, OR PERFORMANCE, WHETHER MADE BY SELLER, EMPLOYEES OR REPRESENTATIVE PERSONNEL, SHALL BE CONSIDERED TO BE A WARRANTY BY SELLER FOR ANY PURPOSE OR GIVE RISE TO ANY LIABILITY OF SELLER WHATSOEVER AND ALL SUCH IMPLIED WARRANTIES ARE HEREBY DISCLAIMED BY SELLER AND EXCLUDED FROM ANY CONTRACT RESULTNG OR ARISING FROM OR OTHERWISE EVIDENCED BY THIS AGREEMENT. Failure to notify Seller in writing within five (5) days of discovery of any unsatisfactory operation, improper maintenance or installation shall terminate this Warranty. The above warranties do not apply to products which are (a) repaired, modified or altered by any party other than Seller or Seller's Authorized Service Center; (b) subjected to unusual physical, thermal, or electrical stresses, corrosion or erosion, improper installation, improper grounding, improper maintenance, lack of lubrication, misuse, abuse, accident or negligence in use, improper storage, transportation or handling, or (c) considered a consumable item or an item requiring repair or replacement due to normal wear and tear. SELLER SHALL NOT BE LIABLE FOR SPECIAL OR CONSEQUENTIAL DAMAGES WHICH MAY ARISE UNDER THIS CONTRACT WHETHER SUCH LIABILITY IS IN CONTRACT, TORT (INCLUDING NEGLIGENCE) OR OTHERWISE, AND IN NO CASE SHALL SELLER'S LIABILITY EXCEED THE PRICE OF THE NONCONFORMING GOODS. 9. NONCONFORMING GOODS: Any rejection of nonconforming Goods must be made by the Buyer within five (5) days of delivery and Buyer must give written notice to Seller within that period. Such notice shall contain a description of the alleged non -conformity. Upon receipt of such notification, Seller will arrange for the return of the Goods, at Seller's expense, and upon confirmation of the nonconformity, Seller, at Seller's expense, will ship conforming Goods to Buyer. 10. RETURNS AND REPAIRS: When Goods are returned for repair, the Buyer must contact Seller's customer support department for shipping instructions and a Return Material Authorization (RMA). Buyer must ship product in original packaging or equivalent, with the RMA clearly marked on the outside of the package, freight prepaid. Seller shall not be responsible for any damage occurring in transit or obligated to accept products returned without RMA. Buyer bears all risk of loss or damage to the returned product until delivery at Seller's designated facility. Any return shipment received by Seller without an RMA or whose contents are not received in their original condition, may be reshipped by Seller freight collect to Buyer. The RMA supersedes any implied return authorization whether oral or in writing that does not include an RMA. 11. RETURNS FOR CREDIT: No returns for credit will be accepted unless Seller's written permission has been obtained in each case in advance, pursuant to clause 10. 12. APPLICABLE LAWS: This Agreement and the respective rights and obligations of the Buyer and Seller with regard hereto shall be governed by and construed according to the laws of the Commonwealth of Pennsylvania, without regard to the principles of conflicts of law thereof. 13. NOTICE: Any and all notices or other communications or deliveries required or permitted to be provided hereunder shall be in writing and shall be sent to Aerzen USA, 108 Independence Way, Coatesville, PA, 19320 14. ASSIGNMENT: Neither party may assign or transfer this Agreement without the prior written consent of the other party. 15. CONFIDENTIAL INFORMATION: Any design specifications, manufacturing drawings, technical data or other information or materials submitted to Buyer and identified by Seller as confidential are and shall remain the exclusive property of Seller. Buyer agrees to treat such information as confidential and shall not reproduce or disclose such information without the express prior written consent of Seller. 16. WAIVER OF SUBROGATION: Buyer agrees to waive any and all subrogation rights towards Seller. 17. DATA USE: The Goods may include data monitoring services. The data received by Seller may be used by Seller and certain third -party distributors and contractors for the sole purposes of increasing overall customer service and determining claims of warrantability. Seller will use commercially reasonable efforts to ensure that Buyer's data is kept confidential. Buyer may request discontinuance of data monitoring service at any time, subject to waiver of all and any remaining warranties. Hazen Appendix B-5: Cloth Disk Filters — Kruger Hydrotech Discfilter Preliminary Proposal Project: Grassy Branch WRF, NC DFS Client: Hazen & Sawyer Date: 1 /26/2023 RSM Contact: Jim Daugherty Phone: (919) 349-2280 Representative Contact: Spero Katsanos CONFIDENTIAL: The information or data contained in this proposal is proprietary to Kruger and should not be copied, reproduced, duplicated, or disclosed to any third party, in whole or part, without the prior written consent of Kruger. This restriction will not apply to any information or data that is available to the public generally. Kruger is pleased to propose the Hydrotech Discfilter system for this project. The system design is based on the information listed in the following tables and will be supplied according to Kruger design standards: Design Parameters Influent Source Secondary Clarification following Activated Sludge Peak Hour Flow 0.47 (327) MGD (gpm) Annual Average Day Flow 0.067 (96) MGD (gpm) Peak Influent TSS 45 mg/L Average Influent TSS 15 mg/L 'Monthly Average Effluent TSS 5 mg/L I HU Irlllu011L lD LIM rllUdlrUrl JYZAurn rrWsl uurlldlrl pdRILAUb ul sulllulum ta/t7 drlu strength to allow retention on the specified 10 um media surface in order for the performance criteria to be met. Discfilter Design Discfilter Model Number HSF2202-1 C Total Units (duty/standby) 1 (1/0) Total Filter Area Per Unit 120 ft Submerged Filter Area Per Unit 78 ft Disc Diameter 2.2 m Peak Hydraulic Loading Rate 4.17 gpm/ft Number of Discs Per Unit 2 Media Pore Size 10 Pm Chassis Material 304 SS Cover Material GRP Self -Enclosed Tank Material 304 SS SEW Drive Motor 1.5 HP Backwash Water Pump 2 HP Backwash Pump Rated Flow 14 gpm Influent Flange ANSI 8" Effluent Flange ANSI 8" Mobile Automated Cleaning System Optional Controls System Allen Bradley Unit Control Panel Enclosure Type NEMA 4X Instrumentation - Level Sensors One (1) lot Hydraulic loading rate does not include standby unit. Process and Design Engineering Kruger provides process engineering and design support for the system as follows: • Equipment specifications for equipment supplied by Kruger. • Technical instructions for operation and start-up of the system. • Equipment location drawings and installation plans. • Project specific O&M manuals. Field Services Kruger will furnish a Service Engineer at the time of start-up to inspect the installation of the completed system, place the system in initial operation, and to instruct operating personnel on the proper use of the equipment. Hubgrade Extended Services Kruger provides the Hubgrade Assist extended service plan as a standard benefit for all Hydrotech Discfilter customers. This valuable blend of on -site and remote support will ensure your filter remains operating in peak condition. Following is a short summary of the plan included. • Hubgrade Assist Advanced Plan - 1 year subscription • Annual operating data review/report by Veolia expert • Annual end -of -year filter inspection and maintenance • In -Situ panel cleaning service • Equipment inspection, lubrication and adjustment including change of gearbox oil, drive chain tension adjustment, bearing greasing and checks of all gaskets and seals • Instrument calibration check • Additional service rate discount while plan is active: 2% Veolia Water Technologies, Inc. dba Kruger 4001 Weston Parkway Cary, NC 27513 Tel: (919) 677-8310 www.veoliawatertech.com Estimated Pricing The estimated pricing for the Discfilter system, as defined herein, including process and design engineering, field services, and equipment supply is: $269, 840 Please note that the above pricing is expressly contingent upon the items in this proposal and are subject to Kruger Standard Terms of Sale detailed herein. Due to current market conditions for fabricated metal items (e.g. steel and aluminum) this price is subject to change based on actual fabricated metal prices at time of order placement. This pricing is FOB shipping point, with freight allowed to the job site. This pricing does not include any sales or use taxes. The price is valid for 60 days from the date of this Proposal. The proposed goods may be affected by the ongoing market fluctuations impacting material and shipping costs. Kruger reserves the right to re-evaluate the Proposal price prior to order acceptance.. The terms of payment are as follows: 10% on receipt of fully executed contract, 15% on submittal of shop drawings, and 75% on the delivery of equipment to the site. Payment shall not be contingent upon receipt of funds by the Contractor from the Owner, and there shall be no retention in payments due to Kruger. All payment terms are net 30 days from the date of invoice. Final payment shall not exceed 120 days from delivery of equipment. All other terms are per the Kruger Standard Terms of Sale. Estimated Schedule • Shop drawings: submitted within 6-8 weeks of receipt of an executed contract by all parties. • Equipment: delivered within 22-28 weeks of receipt of written approval of the shop drawings. • Operation & Maintenance Manuals: submitted within 90 days of receipt of approved shop drawings. Statement Regarding Competitive Transparency Veolia takes all issues surrounding probity and confidentiality very seriously in all of its dealings with competitors and stakeholders. In this spirit and for the sake of transparency, we inform you that the publicly traded parent company Veolia Environnement S.A., recently acquired a 29.9% interest in Suez S.A ("Suez') and launched a public bid for the remainder of Suez' share capital. Consistent with our commitment to competition law compliance, Veolia will continue to act entirely independent of Suez until all relevant antitrust approvals of Veolia's acquisition of Suez have been obtained and we will of course let you know if this would change before the end of the tender proceedings. Specifically, none of Veolia's representatives sit on the board of Suez, Veolia has no influence over the strategy or operations of Suez, and Veolia has no access to competitively sensitive information about Suez's operations. Accordingly, Veolia's ongoing project to acquire Suez will have no effect on our participation in, or response to, this tender. Veolia Water Technologies, Inc. dba Kruger 4001 Weston Parkway Cary, NC 27513 Tel: (919) 677-8310 www.veoliawatertech.com O VEQLIA Kruger Standard Terms of Sale 1. Applicable Terms. These terms govern the purchase and sale of the equipment and related services, if any (collectively, "Equipment"), referred to in Seller's purchase order, quotation, proposal or acknowledgment, as the case may be ("Seller's Documentation"). Whether these terms are included in an offer or an acceptance by Seller, such offer or acceptance is conditioned on Buyer's assent to these terms. Seller rejects all additional or different terms in any of Buyer's forms or documents. 2. Payment. Buyer shall pay Seller the full purchase price as set forth in Seller's Documentation. Unless Seller's Documentation provides otherwise, freight, storage, insurance and all taxes, duties or other governmental charges relating to the Equipment shall be paid by Buyer. If Seller is required to pay any such charges, Buyer shall immediately reimburse Seller. All payments are due within 30 days after receipt of invoice. Buyer shall be charged the lower of 1 '/2% interest per month or the maximum legal rate on all amounts not received by the due date and shall pay all of Seller's reasonable costs (including attorneys' fees) of collecting amounts due but unpaid. All orders are subject to credit approval. 3. Delivery. Delivery of the Equipment shall be in material compliance with the schedule in Seller's Documentation. Unless Seller's Documentation provides otherwise, Delivery terms are F.O.B. Seller's facility. 4. Ownership of Materials. All devices, designs (including drawings, plans and specifications), estimates, prices, notes, electronic data and other documents or information prepared or disclosed by Seller, and all related intellectual property rights, shall remain Seller's property. Seller grants Buyer a non-exclusive, non -transferable license to use any such material solely for Buyer's use of the Equipment. Buyer shall not disclose any such material to third parties without Seller's prior written consent. 5. Changes. Seller shall not implement any changes in the scope of work described in Seller's Documentation unless Buyer and Seller agree in writing to the details of the change and any resulting price, schedule or other contractual modifications. This includes any changes necessitated by a change in applicable law occurring after the effective date of any contract including these terms. 6. Warranty. Subject to the following sentence, Seller warrants to Buyer that the Equipment shall materially conform to the description in Seller's Documentation and shall be free from defects in material and workmanship. The foregoing warranty shall not apply to any Equipment that is specified or otherwise demanded by Buyer and is not manufactured or selected by Seller, as to which (i) Seller hereby assigns to Buyer, to the extent assignable, any warranties made to Seller and (ii) Seller shall have no other liability to Buyer under warranty, tort or any other legal theory. If Buyer gives Seller prompt written notice of breach of this warranty within 18 months from delivery or 1 year from beneficial use, whichever occurs first (the "Warranty Period"), Seller shall, at its sole option and as Buyer's sole remedy, repair or replace the subject parts or refund the purchase price therefore. If Seller determines that any claimed breach is not, in fact, covered by this warranty, Buyer shall pay Seller its then customary charges for any repair or replacement made by Seller. Seller's warranty is conditioned on Buyer's (a) operating and maintaining the Equipment in accordance with Seller's instructions, (b) not making any unauthorized repairs or alterations, and (c) not being in default of any payment obligation to Seller. Seller's warranty does not cover damage caused by chemical action or abrasive material, misuse or improper installation (unless installed by Seller). THE WARRANTIES SET FORTH IN THIS SECTION ARE SELLER'S SOLE AND EXCLUSIVE WARRANTIES AND ARE SUBJECT TO SECTION 10 BELOW. SELLER MAKES NO OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PURPOSE. 7. Indemnity. Seller shall indemnify, defend and hold Buyer harmless from any claim, cause of action or liability incurred by Buyer as a result of third party claims for personal injury, death or damage to tangible property, to the extent caused by Seller's negligence. Seller shall have the sole authority to direct the defense of and settle any indemnified claim. Seller's indemnification is conditioned on Buyer (a) promptly, within the Warranty Period, notifying Seller of any claim, and (b) providing reasonable cooperation in the defense of any claim. 8. Force Maieure. Neither Seller nor Buyer shall have any liability for any breach (except for breach of payment obligations) caused by extreme weather or other act of God, strike or other labor shortage or disturbance, fire, accident, war or civil disturbance, delay of carriers, failure of normal sources of supply, act of government or any other cause beyond such party's reasonable control. 9. Cancellation. If Buyer cancels or suspends its order for any reason other than Seller's breach, Buyer shall promptly pay Seller for work performed prior to cancellation or suspension and any other direct costs incurred by Seller as a result of such cancellation or suspension. 10. LIMITATION OF LIABILITY. NOTWITHSTANDING ANYTHING ELSE TO THE CONTRARY, SELLER SHALL NOT BE LIABLE FOR ANY CONSEQUENTIAL, INCIDENTAL, SPECIAL, PUNITIVE OR OTHER INDIRECT DAMAGES, AND SELLER'S TOTAL LIABILITY ARISING AT ANY TIME FROM THE SALE OR USE OF THE EQUIPMENT SHALL NOT EXCEED THE PURCHASE PRICE PAID FOR THE EQUIPMENT. THESE LIMITATIONS APPLY WHETHER THE LIABILITY IS BASED ON CONTRACT, TORT, STRICT LIABILITY OR ANY OTHER THEORY. 11. Miscellaneous. If these terms are issued in connection with a government contract, they shall be deemed to include those federal acquisition regulations that are required by law to be included. These terms, together with any quotation, purchase order or acknowledgement issued or signed by the Seller, comprise the complete and exclusive statement of the agreement between the parties (the "Agreement") and supersede any terms contained in Buyer's documents, unless separately signed by Seller. No part of the Agreement may be changed or cancelled except by a written document signed by Seller and Buyer. No course of dealing or performance, usage of trade or failure to enforce any term shall be used to modify the Agreement. If any of these terms is unenforceable, such term shall be limited only to the extent necessary to make it enforceable, and all other terms shall remain in full force and effect. Buyer may not assign or permit any other transfer of the Agreement without Seller's prior written consent. The Agreement shall be governed by the laws of the State of North Carolina without regard to its conflict of laws provisions. Water Technologies 1/2" THREADED ROD: ASTM F593 W/ B1.1 UNC THDS 1/2" FLAT WASHER: ASTM A240 304 SS. PLATE 1/2" LOCK WASHER 1/2" HEX NUT: ASTM F594 W/ B1.1 UNC THREADS 3 1 2 — 4 3-1/4" ° EMBED (MIN) ° \ \ ° F -� — 7' 6" [2286] SPRAY BAR 4-1/8" FOR CHEMICAL CLEANSING [105] 0 6" [150] BW WASTE [2216] PRESSURE SWITCH AND GAUGE LEVEL PROBE JUNCTION BOX BACKWASH PUMP w/PIPING & FITTINGS RIVE MOTOR 0 8„ 8„ 4' 4-7/8" [197] a [197] [1343] INFLUENT EFFLUENT ANSI FLG " ANSI FLG 7' 9-7/8" 8' 1 /2" [2450] [2385] --� 4' 8-1/8" 3' 6" [1425] 3' 2-3/16" [1067] BYPASS [970] SEE NOTE 3 WEIR EFFLUENT 2' 5-1/2" WEIR [750]IV [205]6" n �{ 8-1 /16" [205] 6-11/16" 3' 9-7/8" [1166] ANCHOR DISTANCE 3' 8-1 /2" [1130] 5' 2-7/16" [1586] �{ 5'6-3/8" [1686] ANCHOR DISTANCE NOTES: 1. ALL FLANGE CONNECTIONS: BOLT PATTERN ANSI B16.5. PLATE FLANGE: GALVANIZED, STUB END: AISI 304 2. DIMENSIONS IN [ ] ARE MM 3. RECOMMENDED PLATFORM ELEVATION. WORK PLATFORM TO BE SELF SUPPORTING. PLATFORMS MAY NOT BE ATTACHED TO THE FILTER AND LOADS MAY NOT BE TRANSFERRED TO FILTER. PLATFORMS DESIGNED/PROVIDED BY OTHERS. 4. RECOMMEND 24" MINIMUM MAINTENANCE ACCESS AROUND ENTIRE PERIMETER OF DISCFILTER. 5. FOLLOW ANCHOR MANUFACTURERS GUIDELINES FOR SPECIFIC INSTALLATION REQUIREMENTS INCLUDING ANCHOR EMBEDMENT AND EDGE DISTANCE. SEISMIC CODE REQUIREMENTS MAY AFFECT ANCHOR DETAIL SHOWN. 6. ALL ANCHORS AND FASTENERS TO BE STAINLESS STEEL. APPLY ANTI -SEIZE TO ALL CONNECTIONS. ADD FLANGE DIMENSION DSD CDP 09.18.18 PRELIMINARY RELEASE CDP JCC 10.24.17 DESCRIPTION DRAWN APPR DATE ALL INFORMATION CONTAINED ON THIS DOCUMENT IS THE PROPERTY OF KRUGER AND/OR ITS AFFILIATES. THE DESIGN CONCEPTS AND INFORMATION CONTAINED HEREIN ARE PROPRIETARY TO KRUGER AND ARE SUBMITTED IN CONFIDENCE. THEY ARE NOT TRANSFERABLE AND MUST BE USED ONLY FOR THE PURPOSE FOR WHICH THE DOCUMENT IS EXPRESSLY SUBMITTED. THEY MUST NOT BE DISCLOSED, REPRODUCED, LOANED OR USED IN ANY OTHER MANNER WITHOUT THE EXPRESS WRITTEN CONSENT OF KRUGER. KRUGER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE USE OF THIS DOCUMENT OR THE DESIGN CONCEPTS AND INFORMATION CONTAINED HEREIN FOR ANOTHER PROJECT OR IN A MANNER THAT DOES NOT RELATE TO THE FITNESS OR PURPOSE OF THIS DOCUMENT. IN NO EVENT SHALL THIS DOCUMENT OR THE DESIGN CONCEPTS AND INFORMATION CONTAINED HEREIN BE USED IN ANY MANNER DETRIMENTAL TO THE INTEREST OF KRUGER. ALL PATENT RIGHTS ARE RESERVED ACCEPTANCE OF THE DELIVERY OF THIS DOCUMENT CONSTITUTES AGREEMENT TO THESE TERMS AND CONDITIONS. ISOLATION VAL 0 2" [54] NPT DRAIN For Reference Footprint Dimensions Only Please contact Kruger prior to incorporation into contract documents to ensure equipment drawings are accurate and updated with respect to ancillary equipment as shown (backwash piping, pump details, flange sizing, etc). VEOIIA Q KRUGER INC. 4001 WESTON PKWY CARY, NC 27513 1 (919) 677-831 STANDARD PRODUCT DISCFILTER HSF2202-1C, UNIT DRAWING MIXING BYPASS 1 /Il SCALE DRAWING NO �® 1:40 1C.2202.M.8.8 SHEET REV 1 of 1 B Hazen Appendix B-6: Ultraviolet (UV) Disinfection System Troj anUV 3'— 2 REQORIECSO—A4CPER BOLTS nay [924] --;,,_TRANSITION BOX (BY OTHERS) DOWNSTREAM OF WEIR WSTSAME ANDARDS f �OF BOEAM THR BANKS D3400K WEIR BOX (OPTION WL=2.51' [0.765m] (REPLACES DOWNSTREAM TRANSITION BOX AND WEIR IN CHANNEL AS SHOWN BELOW) DOUBLE FLOW WEIR BOX FRONT AND END VIEW NOT SHOWN m — HEIGHT OF WEIR BOX TO MATCH TRANSITION BOX dna" 12" �12„ — TOP OF WEIR ELEVATION WILL NOT CHANGE FROM [381 [381 STANDARD FRONT VIEW EFFLUENT PIPE (BY OTHERS) STANDARD 3400K LEVEL CONTROL WEIR MIC N [381 [38] 1 PDR 2 20 TYPICAL) STANDARD PLUG WITH GROUND (TYPICAL) WL-201' f I [0.613m] N u NOTES lea N TROJAN UV 3000 PTP EQUIPMENT INTERCONNECTIONS No. DESCRIPTION FROM TO 1 SPUTTER PANEL POWER SUPPLY DISTRIBUTION PANEL (DP) SPUTTER PANEL 12OV, 1 PHASE, 2 WIRE, ACTUAL DRAW (NOT SHOWN) (BY OTHERS) 12.7 AMPS / SPLITTER PANEL (BY OTHERS) 2 POWER DISTRIBUTION RECEPTACLE (PDR) SPUTTER PANEL PDR POWER SUPPLY (BY OTHERS) 120V, 1 PHASE, 2 WIRE, ACTUAL DRAW 6.3 AMPS / PDR 3 SYSTEM MONITOR POWER SUPPLY DP (NOT SHOWN) SYSTEM MONITOR 120V, 1 PHASE, 2 WIRE, 5 AMPS (BY OTHERS) SPUTTER PANEL (BY OTHERS) WALL MOUNTED LOCATED WITHIN 10 FT. [3.048m] PDR SYSTEM MONITOR OF POWER END OF MODULES (TYPICAL) (TYPICAL) (TYPICAL) BANK iB BANK 1A ACCESS PLATE WITH MODULE LAMP WARNING LABEL STATUS VIEWING (TYPICAL) PLATE (TYPICAL) PLAN VIEW SCALE: AS SHOWN 3 WALL MOUNTED SYSTEM MONITOR 1 LOCATED WITHIN 157. [4.572m] STANDARD 3400K LEVEL o OF CHANNEL (TYPICAL) CONTROL WEIR W/ DRAIN 2 2 0 10 FEET [3.048m] PLUG 1" [251 NET POWER CORD (TYPICAL) 4-64 UV PTP MODULE 4 REQUIRED/ BANK REMOVABLE COVER (TYPICAL) PLATE (TYPICAL) s... ... ------------ ---- ----- ---- -31t1 ^r-- --- --- --- --- --- --- --- --- --: 1 V w o w m 0z N u v g z gym¢ Z U SOLID BLOCKING 02 [0501 (BY OTHERS) (TYPICAL) NET DRAIN WITH PLUG (TYPICAL) [M1010 ANCHOR BOLTS REEQUIRED — 4 PER TRANSITION BOX (BY OTHERS) I<=�La TRANSITION BOX (TYPICAL) INFLUENT PIPE (BY OTHERS) [0.740m] 9,-7" I Y 9,-7„ 2,-04„ 12921] [29211 2,_04„ [6161 [58421 [6161 A DO NOT SLOPE CHANNEL FLOOR. CHANNEL WIDTH & DEPTH MUST BE KEPT WITHIN A TOLERANCE OF + OR — 1t/a" [6]. ANCHOR BOLTS ARE NOT SUPPLIED BY TROJAN TECHNOLOGIES. BOLTS, WASHERS AND NUTS FOR CONNECTION OF CHANNELS AND TRANSITION BOXES TO CHANNELS ARE PROVIDED BY TROJAN TECHNOLOGIES. SYSTEM CONDUIT, WIRING, DISTRIBUTION PANELS & INTERCONNECTIONS BY OTHERS. ELECTRICAL REQUIREMENTS SHOWN ARE TO SUPPLY TROJAN UV EQUIPMENT ONLY. ELECTRICAL INRUSH FACTOR TO BE ADDED AS PER LOCAL CODE. ANY EXTRA OUTLETS NOT BEING USED BY TROJAN EQUIPMENT HAVE NOT BEEN INCLUDED IN THE INTERCONNECT AMPERAGE. CONTRACTOR TO REVIEW ALL TROJAN TECHNOLOGIES INSTALLATION INSTRUCTIONS PRIOR TO EQUIPMENT INSTALLATION. ACCESS IS REQUIRED FOR MODULE REMOVAL — NOTE THE CHANNEL WIDTH AND ENSURE ADEQUATE ACCESS IS PROVIDED TO ALL MODULES. DO NOT ENCASE THE STEEL CHANNEL IN CONCRETE. [ ] INDICATES MILLIMETERS UNLESS OTHERWISE SPECIFIED HOLE & BOLT CIRCLE TO FIT 12"0 [3000 (FOR DIN, BS & JIS)] PIPE & FLANGE SIC M +� T m a o �n u END VIEW (TYP I CAL_) SCALE:AS SHOWN 00.63" [s161 m x 12 HOLES 02" [0501 is-44„ NET DRAIN WITH PLUG O SECTION P2_1.1 SCALE:AS SHOWN FRONT VI E�/�/ MULTIPLE CHANNELS IN PARALLEL (,OPTION): DIM "A„ ADDITIONAL UNITS CAN BE INSTALLED PARALLEL TO THE UNIT SHOWN. SCALE:AS SHOWN ACCESS BETWEEN EVERY 2 PARALLEL CHANNELS IS REQUIRED FOR MODULE W/ WEIR IN TRANSITION BOX 24'-1j" [7360] REMOVAL — NOTE THE CHANNEL WIDTH AND ENSURE ADEQUATE ACCESS IS PROVIDED BETWEEN TRANSITION BOXES AND CHANNELS. W/ WEIR IN CHANNEL 23'-2j" [7074] ACCESS BETWEEN A MAXIMUM OF 2 CHANNELS IS NOT REQUIRED FOR MODULE REMOVAL. TRANSITION BOXES CAN BE INSTALLED ADJACENT TO EACH OTHER. DESCRIPTION: STANDARD DRAWING NO. TROJAN OV LAYOUT, UV3000PTP—UV3400K 2 BANK 4 1 CHANNEL LAMPS WEIR 3MO276 DRAWN BY LZ JMM SPM DATE 12JN21 REFERENCE N0. N/A CONFIDENTIALITY NorlcE CHECKED BY : SAH DATE 12JN22 Copyright02012 by Trojan Technologies. All rights reserved. No part of this document may be reproduced, stored in a APPROVED BY : CAP DATE 12JN22 DWG NO. retrieval system, or transmitted in any form, without the written permission of Trojan Technologies. D01 1REy IS SCALE (8V2x11) : NOT TO SCALE LOG NUMBER : N/A