HomeMy WebLinkAboutSWA000220_Construction Sequence_20230815 •
•
5410 Trinity Road P 919.866.4951
TIMMONS GROUP Suite 102 F 919.859.5663
YOUR VISION ACHIEVED THROUGH OURS. Raleigh, NC 27607 www.timmons.com
MEMORANDUM
TO: Jim Farkas
FROM: Dexter Howell
DATE: 3/31/2023
RE: Stancil Farms Construction Sequence
Dear Jim,
Stancil Farms will be built in two phases consisting of 99 residential lots within phase 1 and 84
residential lot within phase 2. Subdivision roads will be owned and maintained by NCDOT and are
20' normally crowned roads with ditches, stormwater will drain through pipes and swales to follow
the natural drainage pattern. Watermains are public and will be owned and maintained by Harnett
Regional Water. Each lot will have an individual septic system.
Respectfully,
Dexter Howell
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES