HomeMy WebLinkAboutSW3220803_Response To Comments_20230815 j!j THOMAS & HUTTON 1020 EUCLID AVENUE CHARLOTTE, NC 28203 I 980.201.5505 WWW.T H O MASAN D H UTTO N.CO M August 15th, 2023 Attn: Jim Farkas NCDEQ- Division of Energy, Mineral, and Land Resources Land Quality-Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Cresswind Wesley Chapel- Phase 4 Storm Water Review Monroe, NC J-27842.0004 To whom it may concern: This letter serves as acknowledgement that we have revised the previously submitted package to address all comments below as follows: - Application: o Section IV, 10- Please revise as needed so that the information is consistent with the Supplement-EZ Form: Item Provided Value Value per Supplement-EZ Form Proposed Impervious 1,840,410 1,177,540 Area (sf) % Impervious Area 64% 55%* _ On-site Parking (sf) 147,000 183,750 Total (sf) 1,140,790 1,177,540 *NOTE: 1,177,540 sf/ 1,840,410 sf= 64%so the %BUA as shown in the Application is correct (The Supplement-EZ Form needs to be revised, see below). Application and EZ Form has been revised per comment above with update values to match. - Supplement-EZ Form: o Drainage Areas Page: ■ Prior Comment- Pond 5 Column, Line 16- Please revise this item (see earlier comment). Per the previously provided email, the "correct" drainage area size for this SCM is 1,840,410 sf and a total of 1,177,540 sf of BUA is located within the drainage area to the SCM (1,177,540 sf / 1,840,410 sf = 64%). NOTE: The provided value for the entire site column, 55%, is OK and does not need to be changed. Revised per comment. o Wet Pond Page: ■ Prior Comment- Line 25-The temporary pool elevation is typically set by the invert of the lowest bypass elevation of the SCM (the weir @ 576.40'). Please revise. The provided value, 576.22' does not correspond to the bypass weir invert at elevation 576.40'. Please revise. Revised per comment. ■ Prior Comment- Line 35-The design volume of the SCM is the volume that can be stored above the permanent pool surface elevation and below the temporary pool surface. The provided value, 95,975 cf, does not correspond to the volume of water that can be stored between the permanent pool surface elevation and the invert of the bypass weir (Per the provided stage storage table, the storage volume provided above the permanent pool and below 576.40' is approximately 98,000 cf). Please revise. Revised per comment. We look forward to receiving the approved certification for the referenced project to allow us to proceed. If you have any questions, comments, or desire additional information, please contact our office at (980) 201-5507. Sincerely, THOMAS & HUTTON "ei‘05,;3://0/. Matthew S. Kiker, PE MSK