Loading...
HomeMy WebLinkAboutNCC216829_MODIFICATION Supporting Doc (ADDL LOTS)_20230810 ROY COOPER Governor ELIZABE'TH S.BISER ` } Secretary DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality April 14, 2023 LETTER OF APPROVAL D.R. Horton ATTN: Tracey Davis, Division NPDES/Admin 7208 Falls of Neuse Rd, Ste 201 Raleigh,NC 27615 RE: Project Name: Baker Subdivision Acres Approved: 87.5 Project ID: FRANK-2022-002 County: Franklin City: Youngsville Address: NC Hwy 98 River Basin: Tar-Pamlico Stream Classification: Other Submitted By: Stewart-Proctor; ATTN: Michael Stewart, PE Date Received by LQS: March 22, 2023 Plan Type: Residential/Revised Dear Ms. Davis: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act(hereinafter"Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage (COC)under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially D � North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609 NoR�IC i NANA ~ uw do t m[nrimnm l uwnq 919.791.4200 Letter of Approval D.R. Horton April 14, 2023 Page 2 of 3 Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOL Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 413 .0118(a)requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.l(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609 NORTH CAADUNA Dq-h enW F' .lw.1 919.791.4200 Letter of Approval D.R. Horton April 14, 2023 Page 3 of 3 Sincerely, 0 L �_ Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Stewart-Proctor; ATTN: Michael Stewart, PE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609 +NORTH CAROLJNP. Dq .tId ti 0,.1 919.791.4200 CERTIFICATE OF PLAN APPROVAL STATE�,� Qv - rfi a� ,J •�< f h0 ��pq,'Rll.11.17'ib 'mil "`QUAM The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 413.0127 (b). Baker Subdivision: FRANK-2022-002 Project Name and Location April 14, 2023 Date of Plan Approval Regional Engineer Certificate of Coverage Number