Loading...
HomeMy WebLinkAbout20230942_Sugar Creek Greenway_8-14-23DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JP,. Director Ms. Jennifer Brooks Mecklenburg County 3205 Freedom Drive, Ste. 6000 Charlotte, NC 28202 980-445-8724 Jennifer.brookskmecklenburgcoun . nc.-ov NORTH CAROLINA Environmental Quality August 14, 2023 Subject: 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for the impacts regarding the Sugar Creek Greenway Project from McDowell Farms Drive to Yorkmont Road, Charlotte, Mecklenburg County. NCDWR Project No. 20230942 Dear Ms. Brooks, Attached hereto is a copy of Certification No. 006084 issued to Mecklenburg County, dated August 14, 2023. If we can be of further assistance, do not hesitate to contact us. taglkRed by: 4&P"-T" c affR zff8A'e -s, Jr. Director Division of Water Resources Electronic copy only distribution: Jennifer Burdette, Natural Resource Consultants, LLC Douglas Perez, US Army Corps of Engineers, Charlotte Field Office Beth Harmon, Division of Mitigation Services DWR 401 & Buffer Permitting Branch File, LF DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS. THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95- 217 of the United States and subject to the North Carolina Division of Water Resources (NCDWR) Regulations in 15 NCAC 2H .0500. This certification authorizes Mecklenburg County to impact 377 linear feet of jurisdictional streams and 0.354 aces of jurisdictional wetlands. The project shall be constructed pursuant to the application dated received June 29, 2023. The authorized impacts are as described below: Stream Impacts in the Catawba River Basin Site Perm. Fill in Perennial Stream (linear ft) Temp. Fill in Perennial Stream (linear ft) Total Stream Impact (linear ft) Stream Impacts Requiring Mitigation (linear ft) S1- Bank Stabilization 21 21 S2- Bank Stabilization 21 21 S3- Bank Stabilization 24 24 S4- Rip -Rap dissipator 7 7 S5- Rip -Rap dissipator 12 12 S6- Bank Stabilization 21 21 S7- Rip -Rap dissipator 12 12 S8- Rip -Rap dissipator 16 16 S9- Culvert 39 39 S10- Rip -Rap dissipator 27 27 S11- Rip -Rap dissipator 16 16 S 12- Rip -Rap dissipator 12 12 S13- Bank Stabilization 22 22 S 14- Culvert 49 49 S15- Rip -Rap dissipator 31 31 S16- Bank Stabilization 22 22 S17- Rip -Rap dissipator 25 25 Totals 377 0 377 0 Total Stream Impacts: 377 linear feet. E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � Department of wronmentalouaifty r 919.707.9000 DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C Wetland Impacts in the Catawba River Basin Permanent Fill Temporary Fill Total Wetland Impacts Requiring Site (ac) (ac) Impact (ac) Mitigation (ac) W 1 - Access 0.007 0.007 W2 - Grccnway 0.347 0.347 0.35 Totals 0.347 0.007 0.354 0.35 Total Wetland Impacts: 0.354 acres The application provides adequate assurance that the discharge of fill material into the waters of the Catawba River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your application dated received June 29, 2023. Should your project change, you are required to notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non -discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. This Water Quality Certification neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Water Quality Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and does not create any prescriptive right or any right of priority regarding any usage of water. This Water Quality Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Water Quality Certification to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. Upon the presentation of proper credentials, the Division may inspect the property. Condition(s) of Certification: Project Specific Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)]. E Q­North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � oewemmEnwmnmemeio�ai1 r 919.707.9000 DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C 2. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. [15A NCAC 02H.0506(b)(2)] 3. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. [ 15A NCAC 02H.0506(b)(2)]. 4. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species. [15A NCAC 02H.0506(b)(2)] 5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water shall be captured, treated, and disposed of properly. [ 15A NCAC 02H .0506(b)(3). 6. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/ or stabilized to reduce sediment loss and turbidity. This includes interior/ exterior slopes of sediment basins. [ 15A NCAC 02H. 0506 (b)(3) and (c)(3)]. 7. Bare/ fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted. [15A NCAC 02H. 0506 (b)(1) and 15A NCAC 02H. 502 (c)] 8. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. [ 15A NCAC 02B. 0203] 9. Compensatory mitigation for impacts to 0.354 acres of wetlands is required in the Catawba River Basin (HUC 03050103). We understand that you have chosen to perform compensatory mitigation for impacts to wetlands through the North Carolina Division of Mitigation Services (DMS) (formerly NCEEP), and that the DMS has agreed to implement the mitigation for the project. DMS has indicated in a letter dated June 21, 2023 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above -referenced project, in accordance with DMS's Mitigation Banking Instrument signed July 28, 2010. General Conditions 1. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [ 15A NCAC 02B.0200] 2. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [I 5A NCAC 02H.0506(b)(2)] 3. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 4. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 5. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] E Q­North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � oewemmEnwmnmemeio�ai1 r 919.707.9000 DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C 6. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 7. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 9. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] 10. Discharging hydroseed mixtures and washing out hydro seeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 11. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 12. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 13. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 14. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 15. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 16. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 17. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)] 18. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. E Q­North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � oewemmEnwmnmemeio�ai1 r 919.707.9000 DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 19. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] 20. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0506{b)(3) and (c)(3) and 15A NCAC 02B .0200] This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. Please be aware that impacting waters without first applying for and securing the issuance of a 401 Water Quality Certification violates Title 15A of the North Carolina Administrative Code (NCAC) 2H .0500. Title 15A NCAC 2H .0500 requires certifications pursuant to Section 401 of the Clean Water Act whenever construction or operation of facilities will result in a discharge into navigable waters, including wetlands, as described in 33 Code of Federal Regulations (CFR) Part 323. It also states any person desiring issuance of the State certification or coverage under a general certification required by Section 401 of the Federal Water Pollution Control Act shall file with the Director of the North Carolina Division of Water Quality. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. This approval and its conditions are final and binding unless contested [G.S. 143-215.5]. Please be aware that impacting waters without first applying for and securing the issuance of a 401 Water Quality Certification violates Title 15A of the North Carolina Administrative Code (NCAC) 2H .0500. Title 15A NCAC 2H .0500 requires certifications pursuant to Section 401 of the Clean Water Act whenever construction or operation of facilities will result in a discharge into navigable waters, including wetlands, as described in 33 Code of Federal Regulations (CFR) Part 323. It also states any person desiring issuance of the State certification or coverage under a general certification required by Section 401 of the Federal Water Pollution Control Act shall file with the Director of the North Carolina Division of Water Quality. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. A party filing a Petition must serve a copy of the Petition on: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � Department of wronmentalouaifty r 919.707.9000 DocuSign Envelope ID: 837535B8-E227-4666-BC13-9COB7D5E597C If the party filing the Petition is not the pennittee, then the party must also serve the recipient of the Certification in accordance with N.C.G.S 15013-23(a). This the 14' day of August, 2023 DIVISION OF WATER RESOURCES DOCUSigned by: 9C9886312DCD474... Richard E. Rogers, Jr., Director WQC No. 006084 E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA � Department of wronmentalouaifty r 919.707.9000