HomeMy WebLinkAbout20231119 Ver 1_Site Plan_20230814Proposed
(Plan View)
Full Pond/ Normal Water Level
La ke
(At Full Pond/ Normal Water Level)
Lake
[At Full Pondf Normal Water level}
Nothing below sea leave)
Full Pon Normal Water
t7or`eliMee
2 ft. xi50 ft.
additional clearing
• if necessary
100 Feet
Plan View
Riprap
Existing Dock
/30 ftx 7ft
3 ftx 150ft
BeloW full pond/ N W L
I ftxi50ft
Above full pond( NWL
Retaining Wall existing - replacin rotten boards
(AMPLE
Proposed
I[':_1_ .,-----,,
3 ft. below full pond water level 4 ft, above full pond water level 2 ft. additional clearing
'it necessary
Existing bank
100 feet of existing - Repair only
10 ft. bank
height y2a
Q�
QUO
Side Vi MPLE
Shoreline Layout Diagram
Lake Shoreline Stabilization Application
Please approximately sketch the following information on this plan and provide dimensions far
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
On the following pages are examples to follow and space to sketch the proposed plan.
<— Select a location highlighted in blue to enter Street View.
i
J-�
Google Earth Imagery date: 1118/...
30 rr 'W Camera: 206 m 35°13`05"N 80°04'...
Select a location highlighted in blue to enter Street View.
R.
4W
Google Earth Imagery date: 11/8/... I
A�
r
60 m Camera: 321 m 35'13'05"N 80"04'...