Loading...
HomeMy WebLinkAbout20071134 Ver 1_Emails_20150720Baker, Virginia From: Elliott, Jason C Sent: Wednesday, July 15, 2015 9:40 AM To: Baker, Virginia Subject: RE: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED) Hi Ginny, I'll be sending a request out soon for closeout for the R-2408 sites that you guys looked at last week and I'll send it directly to you and CC Kevin. Thanks! -----Original Message----- From: Baker, Virginia Sent: Thursday, July 09, 2015 11:54 AM To: Elliott, Jason C Cc: Beckwith, Loretta A SAW; Barnett, Kevin Subject: FW: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED) Hi Jason, I did not see anything in permit conditions for 2519A noting that an additional permit would be needed for repair work. Lori mentioned during the Tuesday site visit that you would send an email requesting a closeout letter for sites we visited in the field. Just wanted to make sure that was the case. Could you please send it directly to me and just CC our regional staff, thanks. Ginny -----Original Message----- From: Beckwith, Loretta A SAW [mailto:Loretta.A.Beckwith@usace.army.mil] Sent: Friday, June 26, 2015 10:47 AM To: Baker, Virginia Subject: FW: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE -----Original Message----- From: Beckwith, Loretta A SAW Sent: Friday, June 26, 2015 10:42 AM To: 'Elliott, Jason C' Cc: Barnett, Kevin Subject: RE: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Hi Jason, The repair work is covered under the existing permit. i Thanks for checking. Lori -----Original Message----- From: Elliott, Jason C [mailto:jelliott@ncdot.�ov] Sent: Monday, May 18, 2015 9:03 AM To: Beckwith, Loretta A SAW; Barnett, Kevin; Baker, Virginia Subject: [EXTERNAL] R-2519A Site 32 UT to Plum Branch Remediation Plans Lori/Kevi n, Please see the attached remediation plan sheet and profile for the UT to Plum Branch Site #32 stream mitigation site on the R-2519A project for your review. I've also included the detail sheet for the proposed constructed riffle as well as listed the projected quantities below that are needed to make the repairs. Also to complete the repairs a pump around operation will be required but I know that was previously included in the construction contract. I'm pretty sure this repair work would be covered under the existing permit but can you guys verify that for me? Thanks and please let me know if you have any questions or if we can be of further assistance. Jason C. Elliott PDEA - Natural Environment Section Natural Environment Engineering Group NC Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919-707-6114 Fax: 919-212-5785 <i mage001.j pg> Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. <R-2519A Site 32 UT to Plum Branch Remediation Profile.pdf> <R2519A_PlumBranch_Remediation_Plan. pdf> <Constructed Riffle Detail.pdf> Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE