HomeMy WebLinkAbout20071134 Ver 1_Emails_20150720Baker, Virginia
From: Elliott, Jason C
Sent: Wednesday, July 15, 2015 9:40 AM
To: Baker, Virginia
Subject: RE: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED)
Hi Ginny,
I'll be sending a request out soon for closeout for the R-2408 sites that you guys looked at last week and I'll send it
directly to you and CC Kevin. Thanks!
-----Original Message-----
From: Baker, Virginia
Sent: Thursday, July 09, 2015 11:54 AM
To: Elliott, Jason C
Cc: Beckwith, Loretta A SAW; Barnett, Kevin
Subject: FW: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED)
Hi Jason,
I did not see anything in permit conditions for 2519A noting that an additional permit would be needed for repair work.
Lori mentioned during the Tuesday site visit that you would send an email requesting a closeout letter for sites we
visited in the field. Just wanted to make sure that was the case. Could you please send it directly to me and just CC our
regional staff, thanks.
Ginny
-----Original Message-----
From: Beckwith, Loretta A SAW [mailto:Loretta.A.Beckwith@usace.army.mil]
Sent: Friday, June 26, 2015 10:47 AM
To: Baker, Virginia
Subject: FW: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
-----Original Message-----
From: Beckwith, Loretta A SAW
Sent: Friday, June 26, 2015 10:42 AM
To: 'Elliott, Jason C'
Cc: Barnett, Kevin
Subject: RE: R-2519A Site 32 UT to Plum Branch Remediation Plans (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Hi Jason,
The repair work is covered under the existing permit.
i
Thanks for checking.
Lori
-----Original Message-----
From: Elliott, Jason C [mailto:jelliott@ncdot.�ov]
Sent: Monday, May 18, 2015 9:03 AM
To: Beckwith, Loretta A SAW; Barnett, Kevin; Baker, Virginia
Subject: [EXTERNAL] R-2519A Site 32 UT to Plum Branch Remediation Plans
Lori/Kevi n,
Please see the attached remediation plan sheet and profile for the UT to Plum Branch Site #32 stream mitigation
site on the R-2519A project for your review. I've also included the detail sheet for the proposed constructed riffle as
well as listed the projected quantities below that are needed to make the repairs. Also to complete the repairs a pump
around operation will be required but I know that was previously included in the construction contract. I'm pretty sure
this repair work would be covered under the existing permit but can you guys verify that for me? Thanks and please let
me know if you have any questions or if we can be of further assistance.
Jason C. Elliott
PDEA - Natural Environment Section
Natural Environment Engineering Group
NC Department of Transportation
1598 Mail Service Center
Raleigh, NC 27699-1598
Phone: 919-707-6114
Fax: 919-212-5785
<i mage001.j pg>
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to
third parties.
<R-2519A Site 32 UT to Plum Branch Remediation Profile.pdf>
<R2519A_PlumBranch_Remediation_Plan. pdf>
<Constructed Riffle Detail.pdf>