Table of Contents
Narrative............................................................. ............................... 1
Project Area Rainfall Data ........................................ ............................... 2
Hydraflow Rainfall Report .....................
Hydraflow OF Curves - Smithfield, NC
2
7
Calculations for Structural BMPs ................................ ............................... 8
SandFilter "A" .................................. ...............................
SandFilter "B" .................................. ...............................
Stormwater Wetland - Determination of Areas & Plantings
Stormwater Wetland - Flow Hydrographs ..........................
.8
10
12
13
Appendix
"A"
- Vicinity Map ...................................... .............................19
Appendix
"B"
- USGS Topographic Map ......................... .............................20
Appendix
"C"
- Soils Map .......................................... .............................21
Appendix
"D"
- Stormwater Map - Post Construction ....... .............................22
Proiect Stormwater Narrative
The Eco- Energy — Selma NC project involves the construction of an intermodal facility to facilitate the
transmission of liquid ethanol from railroad traffic to offsite bulk storage tanks via a transfer pipeline.
The project site is located in the Selma Township of Johnston County on a 58.38 acre site zoned for
industrial use. The site consists of gently rolling to rolling slopes draining to an unnamed tributary of the
Neuse River. Limited off -site drainage is received primarily from Buffalo Road but bypasses BMP
measures. The existing site does not include any impervious areas.
The project will disturb 8.60 acres during the construction phase and will result in a total built upon area
post- construction to 4.47 acres. For the purposes of this project, stormwater BMP's have been
implemented to satisfy the 401/404 Water Quality requirements due to the existing wetlands on -site.
These BMP's will permit the addition of 1.46 acres of new impervious area to be added without
requiring the implementation of further stormwater controls. The BMP's for this site do not receive any
additional offsite flow.
Structural BMP's include a wetland and sand filter system treating flows from 4.00 acres and 0.55 acres,
respectively. The wetland is located south of the railyard. The sand filter system is located north of the
entrance driveway. The measures have been designed to meet or exceed the NC DENR requirements for
discharge into the wetland.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3
Hyd. No. 2
Parcel 1 - Post Const.
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Drainage area
= 3.920 ac
Curve number
Basin Slope
= 0.0%
Hydraulic length
Tc method
= User
Time of conc. (Tc)
Total precip.
= 2.90 in
Distribution
Storm duration
= 24 hrs
Shape factor
" Composite (Area /CN) = [(0.920 x 60) + (1.400 x 98)] / 3.920
Parcel 1 - Post Const.
Q (cfs) Hyd. No. 2 -- 1 Year
18.00
15.00
12.00
• IX
MOM
3.00
Saturday, 06 / 20 / 2015
= 15.30 cfs
= 11.93 hrs
= 35,601 cuft
= 98*
= 0 ft
= 5.00 min
= Type II
= 484
2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0
Hyd No. 2
2
Q (cfs)
18.00
15.00
12.00
• IX
. IX
3.00
0.00
20.0
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.2
Hyd. No. 2
Parcel 1 - Post Const.
Hydrograph type
= SCS Runoff
Storm frequency
= 2 yrs
Time interval
= 2 min
Drainage area
= 3.920 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 3.50 in
Storm duration
= 24 hrs
" Composite (Area /CN) = [(0.920 x 60) + (1.400 x 98)] / 3.920
Q (cfs)
21.00
18.00
15.00
12.00
. 11
. 11
3.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Parcel 1 - Post Const.
Hyd. No. 2 -- 2 Year
Saturday, 06 / 20 / 2015
18.55 cfs
11.93 hrs
43,576 cuft
98*
0 ft
5.00 min
Type II
484
Q (cfs)
21.00
18.00
15.00
12.00
. 11
More
3.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Hyd No. 2 Time (hrs)
3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.2
Hyd. No. 2
Parcel 1 - Post Const.
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 2 min
Drainage area
= 3.920 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 5.10 in
Storm duration
= 24 hrs
" Composite (Area /CN) = [(0.920 x 60) + (1.400 x 98)] / 3.920
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Parcel 1 - Post Const.
Saturday, 06 / 20 / 2015
27.18 cfs
11.93 hrs
64,874 cuft
98*
0 ft
5.00 min
Type II
484
Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs)
28.00 28.00
24.00 24.00
20.00
16.00
12.00
11
4.00
0.00
0.0 2.0
Hyd No. 2
4.0
fflrl : 1
20.00
16.00
12.00
F-WIT11
4.00
0.00
10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.2
Hyd. No. 2
Parcel 1 - Post Const.
Hydrograph type
= SCS Runoff
Storm frequency
= 50 yrs
Time interval
= 2 min
Drainage area
= 3.920 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 6.80 in
Storm duration
= 24 hrs
" Composite (Area /CN) = [(0.920 x 60) + (1.400 x 98)] / 3.920
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Saturday, 06 / 20 / 2015
36.31 cfs
11.93 hrs
87,526 cuft
98*
0 ft
5.00 min
Type II
484
Parcel 1 - Post Const.
Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs)
40.00 40.00
30.00 30.00
20.00 20.00
10.00 10.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Hyd No. 2 Time (hrs)
5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.2
Hyd. No. 2
Parcel 1 - Post Const.
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 2 min
Drainage area
= 3.920 ac
Basin Slope
= 0.0%
Tc method
= User
Total precip.
= 7.60 in
Storm duration
= 24 hrs
" Composite (Area /CN) = [(0.920 x 60) + (1.400 x 98)] / 3.920
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Parcel 1 - Post Const.
Saturday, 06 / 20 / 2015
40.61 cfs
11.93 hrs
98,190 cuft
98*
0 ft
5.00 min
Type II
484
Q (cfs)
Hyd. No. 2 -- 100 Year
Q (cfs)
50.00
50.00
40.00
40.00
30.00
30.00
20.00
10.00
0.00
0.0 2.0
Hyd No. 2
4.0 6.0 8.0
20.00
10.00
0.00
10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
6
Hydraflow OF Curves
Intensity (in /hr)
14.00
12.00
10.00
11
M
4.00
2.00
OF file: Selma Rainfall.IDF
14.00 100 -Yr
12.00
10.00 25 -Yr
8.00 10 -Yr
6.00
2.00
0.00 0.00
0 5 10 15 20 25 30 35 40 45 50 55 60
Time (min)
5 -Yr
2 -Yr
Hydrographs
7
Stormwater BMP Calculations
Intermodal Facility
Eco- Energy, Selma, NC
SAND FILTER "A"
Total Area Draining to Pond/ Sand Filter 0.37 AC
Percentage Impervious 100.00 %
Total Proposed Impervious Surface Area Draining to Pond 0.37 * AC
WQv= A
(sq ft) *Rd (ft)
WQV=
1,343.10
ft3
WQVAdj=
1,343.10
X.75
WQVAdj=
1,007.33
ft'
Rv =
0.95
2
Rd=
1.00
inch
Find hMaxFilter WQVAdj / (As +Af)
Assume As= 244 SF
Assume Af= 244 SF
hMaxFilter 2.06 ft
hA= 1.03
Determine Head/ Area Combinations
hMaxFilter (ft)
WQVAdj (cf)
As + Af (sf)
0.5
1,007
2,015
1
1,007
1,007
1.5
1,007
672
2
1,007
504
2.5
1,007
403
3
1,007
336
3.5
1,007
288
4
1,007
252
4.5
1,007
224
Find As= (240 *Rv *Ap) *Rp
Min. As= 84 SF
Verify Volume:
() (
V Cf = s+ f )MaxFilter Provided
V (cf)= 1007.325 >/= 1,007.33 Cf
Sand Filter Medium = 15'L x 3.25'W x 1.5'D (Per Box, 5 Boxes Total)
Area Provided 244 SF
Determine Underdrain and Overflow Svstem
Minimum Underdrain Size = 4" Dia.
Flow Rate Through Soil Media @ 3.5 Ft per Day: _ (As * 3.5)/ 86,400 s/d
8
Stormwater BMP Calculations
Intermodal Facility
Eco- Energy, Selma, NC
Area: 244.00 SF
Infiltration Rate 3.50 Ft/ Day
Flow Rate = 0.01 cfs
Safety Factor = 10
Adjusted Flow Rate: 10 (0.01 cfs) = 0.1 cfs.
Diameter of Pipe (D) = 16 [ (Q *n) / (S 110.5) ] 11(3/8)
Q= 0.10 cfs
n= 0.011
S= 0.005 ft /ft
D= 4.1 Inch
4.1" -- 4 "; Use f4" pipes in underdrain.
Anti - Floatation Calculations:
ANTI - FLOATATION BLOCK
VOLUME OF
WEIGHT OF FILTER
WEIGHT OF WATER
SAFETY FACTOR
Vol of
THEREFORE USE
STRUCTURE NAME WATER DISPL.
Vo *62.4 Ib /cf (Ibs)
Weight* 1.1 (Ibs)
Concrete (150 Vol of Sand Total
FOOTING DIMENSIONS
(cu ft. PER UNIT)
(150 Ibs /cu ft) Weight
Ibs /cu ft)
Filter weight Exceeds
Sand Filter A 640.00
39936.00
43930
312.00 73.00 57750
Buoyancy Force + Safety
Factor, No Footing
A 0.00
0.00
0
0.00 0 0
Required
Weight of this filter and sand medium exceed weight of displaced water including safety factor for depth of buried portion of
filter; no anti - floatation block required.
i
Stormwater BMP Calculations
Intermodal Facility
Eco- Energy, Selma, NC
SAND FILTER "B"
Total Area Draining to Pond/ Sand Filter 0.17 AC
Percentage Impervious 100.00 %
Total Proposed Impervious Surface Area Draining to Pond 0.17 * AC
WQv=
A (sq ft) *Rd (ft)
WQv=
617.10 ft'
WQvAdj=
617.10 X.75
WQv Adj =
462.83 ft'
Rv =
0.95
Rd=
1.00 inch
Find hMaxFilter WQVAdj / (As +Af)
Assume As= 195 SF
Assume Af= 195 SF
hMaxFilter 1.19 ft
hA= 0.59
Determine Head/ Area Combinations
hMaxFilter (ft)
WQvAdj (cf)
As + Af (sf)
0.5
463
926
1
463
463
1.5
463
309
2
463
231
2.5
463
185
3
463
154
3.5
463
132
4
463
116
4.5
463
103
Find As= (240 *Rv *Ap) *Rp
Min. As= 39 SF
Verify Volume:
() (
V Cf = s+ f )MaxFilter Provided
V (cf)= 780 >/= 462.83 Cf
Sand Filter Medium = 15'L x 3.25'W x 1.5'D (Per Box, 4 Boxes Total)
Area Provided 195 SF
Determine Underdrain and Overflow Svstem
Minimum Underdrain Size = 4" Dia.
Flow Rate Through Soil Media @ 3.5 Ft per Day: _ (As * 3.5)/ 86,400 s/d
I
Stormwater BMP Calculations
Intermodal Facility
Eco- Energy, Selma, NC
Area: 195.00 SF
Infiltration Rate 3.50 Ft/ Day
Flow Rate = 0.01 cfs
Safety Factor = 10
Adjusted Flow Rate: 10 (0.01 cfs) = 0.1 cfs.
Diameter of Pipe (D) = 16 [ (Q *n) / (S 110.5) ] 11(3/8)
Q= 0.10 cfs
n= 0.011
S= 0.005 ft /ft
D= 4.1 Inch
4.1" -- 4 "; Use f4" pipes in underdrain.
Anti - Floatation Calculations:
ANTI - FLOATATION BLOCK
VOLUME OF
WEIGHT OF FILTER
WEIGHT OF WATER
SAFETY FACTOR
Vol of
THEREFORE USE
STRUCTURE NAME WATER DISPL.
Vo *62.4 Ib /cf (Ibs)
Weight* 1.1 (Ibs)
Concrete (150 Vol of Sand Total
FOOTING DIMENSIONS
(cu ft. PER UNIT)
(150 Ibs /cu ft) Weight
Ibs /cu ft)
Filter weight txceeos
Sand Filter A 640.00
39936.00
43930
312.00 73.00 57750
Buoyancy Force + Safety
Factor, No Footing
A 0.00
0.00
0
0.00 0 0
Required
Weight of this filter and sand medium exceed weight of displaced water including safety factor for depth of buried portion of
filter; no anti - floatation block required.
I
Stormwater BMP Calculations
Intermodal Facility
Eco- Energy, Selma, NC
Stormwater Wetland - Rail Yard
Total Area Draining to Wetland
Percentage Impervious
Total Proposed Impervious Surface Area Draining to Wetland
WQv= A (sq ft) *Rd (ft)
WQv= 14,520.00 ft'
Prop. Depth= 1.00 ft
Surface Area= 14,520.00 Sf
Volume Provided = 14,545 cf
Area Provided @ Perm. Pool = 18,900 sf 100%
Area Provided @ WQV Elev = 10,190 sf
4.00 AC
100.00 %
4.00 * AC
Shallow Land Area =
8,700 sf
46%
Shallow Water Area =
5,360 sf
28%
Total Deep Pool Area (Non Forebay)=
3,320 sf
18%
Forebay Pool Area =
1,510 sf
8%
Total
100%
*Additional Deep Pool area provided to protect the full length of the wetland during dry periods.
PLANT SCHEDULE:
Shallow Water: 50 Plants per 200 SF
Total Plantings = (A/200) *50
Total Plantings = 0 Each
Plants per Species = (Total Plantings / 5 Species)
Plants per Species = 0 Each (Soft Rush, Lizards Tail, Blue Flag, Waterpod, Giant Cutgrass
Shallow Land: 50 Plants per 200 SF
Total Plantings = (A/200) *50
Total Plantings = 2175 Each
Plants per Species = (Total Plantings / 5 Species)
Plants per Species = 435 Each (Swamp Milkweed, Quil Sedge, Cardinal Flower, Narrow
Plumegrass, Sweet Pepperbush)
a
Pond Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3
Saturday, 06 / 20 / 2015
Pond No. 1 - Shallow Land
Volume
Pond Data
Contours - User - defined contour areas.
Conic method used
for volume calculation. Begining Elevation = 151.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft)
Contour area
(sqft)
Incr. Storage (cuft)
Total storage (cuft)
0.00 151.00
10,200
0
0
1.00 152.00
18,902
14,328
14,328
1.50 152.50
19,950
9,711
24,039
2.00 153.00
22,064
10,498
34,537
Culvert / Orifice Structures
Weir Structures
[A]
[B] [C]
[PrfRsr]
[A] [B]
[C] [D]
Rise (in) = 15.00
3.00 Inactive
0.00
Crest Len (ft)
= 16.00 20.00
Inactive Inactive
Span (in) = 15.00
3.00 0.00
0.00
Crest El. (ft)
= 152.00 152.00
0.00 0.00
No. Barrels = 1
1 1
0
Weir Coeff.
= 3.33 3.33
3.33 3.33
Invert El. (ft) = 150.00
151.00 0.00
0.00
Weir Type
= 1 Broad
- -- - --
Length (ft) = 65.00
0.00 0.00
0.00
Multi -Stage
= Yes No
No No
Slope ( %) = 0.08
0.00 0.00
n/a
N -Value = .013
.013 .013
n/a
Orifice Coeff. = 0.60
0.60 0.60
0.60
Exfil.(in /hr)
= 0.000 (by Contour)
Multi -Stage = n/a
No No
No
TW Elev. (ft)
= 0.00
Note: Culvert/Orifice outflows are analyzed
under inlet (ic) and outlet
(oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage (ft)
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40
0.20
0.00
0.00 8.00
Total Q
Stage / Discharge
16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00
13
Elev (ft)
153.00
152.80
152.60
152.40
152.20
152.00
151.80
151.60
151.40
151.20
151.00
80.00
Discharge (cfs)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3
Hyd. No. 3
Parcel 1 - Wet Basin
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Inflow hyd. No.
= 2 - Parcel 1 - Post Const.
Max. Elevation
Reservoir name
= Shallow Land Volume
Max. Storage
Storage Indication method used.
Q (cfs)
18.00
15.00
12.00
• IX
. OR
3.00
0.00
0 4
Hyd No. 3
Parcel 1 - Wet Basin
Hyd. No. 3 -- 1 Year
Saturday, 06 / 20 / 2015
= 8.886 cfs
= 12.03 hrs
= 35,415 cuft
= 152.18 ft
= 17,675 cuft
8 12 16 20 24 28 32 36
Hyd No. 2 M —] Total storage used = 17,675 cuft
14
Q (cfs)
18.00
15.00
12.00
• e
. IX
3.00
- 0.00
40 44
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3
Hyd. No. 3
Parcel 1 - Wet Basin
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Inflow hyd. No.
= 2 - Parcel 1 - Post Const.
Max. Elevation
Reservoir name
= Shallow Land Volume
Max. Storage
Storage Indication method used
Q (cfs)
21.00
18.00
15.00
12.00
• 11
. 11
3.00
Parcel 1 - Wet Basin
Hyd. No. 3 -- 2 Year
0.00 `
0 4 8 12
Hyd No. 3 Hyd No. 2
Saturday, 06 / 20 / 2015
= 13.79 cfs
= 12.00 hrs
= 43,382 cuft
= 152.25 ft
= 19,094 cuft
16 20 24 28 32
11111111 Total storage used = 19,094 cuft
15
Q (cfs)
21.00
18.00
15.00
12.00
. 11
. 1R
3.00
0.00
36
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3
Hyd. No. 3
Parcel 1 - Wet Basin
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 2 min
Hyd. volume
Inflow hyd. No.
= 2 - Parcel 1 - Post Const.
Max. Elevation
Reservoir name
= Shallow Land Volume
Max. Storage
Storage Indication method used
Parcel 1 - Wet Basin
Q (cfs) Hyd. No. 3 -- 10 Year
28.00 .I
24.00
20.00
16.00
12.00
11
4.00
0.00 --
0 2 4
Hyd No. 3
i'
Saturday, 06 / 20 / 2015
= 22.07 cfs
= 12.00 hrs
= 64,667 cuft
= 152.39 ft
= 21,741 cuft
Q (cfs)
28.00
24.00
20.00
16.00
12.00
F-WIT11
4.00
0.00
6 8 10 12 14 16 18 20 22 24 26
Hyd No. 2 M —] Total storage used = 21,741 cuft Time (hrs)
16
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Saturday, 06 / 20 / 2015
Hyd. No. 3
Parcel 1 - Wet Basin
Hydrograph type
= Reservoir
Peak discharge
= 29.98 cfs
Storm frequency
= 50 yrs
Time to peak
= 12.00 hrs
Time interval
= 2 min
Hyd. volume
= 87,319 cuft
Inflow hyd. No.
= 2 - Parcel 1 - Post Const.
Max. Elevation
= 152.51 ft
Reservoir name
= Shallow Land Volume
Max. Storage
= 23,963 cuft
Storage Indication method used
Parcel 1 - Wet Basin
Q (cfs) Hyd. No. 3 -- 50 Year Q (cfs)
40.00 40.00
1
30.00 r 30.00
20.00 20.00
10.00 1 10.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Hyd No. 3 -1 Hyd No. 2 1����� Total storage used = 23,963 cuft Time (hrs)
17
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Saturday, 06 / 20 / 2015
Hyd. No. 3
Parcel 1 - Wet Basin
Hydrograph type
= Reservoir
Peak discharge
= 33.60 cfs
Storm frequency
= 100 yrs
Time to peak
= 12.00 hrs
Time interval
= 2 min
Hyd. volume
= 97,983 cuft
Inflow hyd. No.
= 2 - Parcel 1 - Post Const.
Max. Elevation
= 152.55 ft
Reservoir name
= Shallow Land Volume
Max. Storage
= 24,973 cuft
Storage Indication method used
Parcel 1 - Wet Basin
Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs)
50.00 50.00
40.00 40.00
30.00 30.00
20.00 20.00
10.00 10.00
0.00 - • — 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Hyd No. 3 -1 Hyd No. 2 1����� Total storage used = 24,973 cuft Time (hrs)
18
4
N
431
RA�1� �
PROPOSED PROJECT AREA -S
-
ru'ina
— , f; ,,,•M1 301
L ' � Fit',•,, ti `` -•- - , -
R l 1
4 r � 4• w
iy Wirt
+� l '4
Ff.ayjx'rt -, f -,tlu ,
lir'i111i'�i � 3
t
,1[]llIIiS7'SA 'i t �y,tt1�` Skcr�h
y N co < ` Ill f h
SCALE: N/A VICINITY MAP APPENDIX
DATE: 19 June 15 ECO Energy
Charnb�rs Enginc�gerin Intermodal Ethanol Transfer Facility
DRAWN BY: �'�`
JRM 12674o4hr,s,St,AJbemarre NC2800170d -mot Johnston County, North Carolina /�
NCBELS Firm Uwe se No. C -1680 A
CHECKED BY: AGD PROJECT NO: 2013 -791 /
19
r r `80
- f ` Gravel
✓ i A �
1 A Gtavea
,so_ -r. ;sand and Grere,
P.,
N.
Sk * J'
1 1 �•. ` •x.44,. 1rr t . • cyn . � ` i 10 1
We
J � rlrir3vpl
lb
' i ; 51 - mood �i '� ,� ''+±+, { - w� 1'!•.
PROPOSED PROJECT AREA �.-• r, •��!`
Ch
Selma
firsaosal rC� �"J �'ir •. ~•
Memor al
• Ce 9 J ° ' -r�P, }
Graver SrlmB'
:.Pct ahte
j mor;at Gatcli�sy F.0
'acNerpas k .,.,
s Substation Z
/ u -.i o *� ^'. i _ y,0 .ems° 2,000�'� 4,000..
�If �� �+ � tare ' `'.. ��. j a / - Feet
hea t QP
SCALE: 1" = 2000' U S G S TOPOGRAPHIC MAP APPENDIX
DATE: 19 June 15 ECO Energy
CF �mt�,r �r,g�n� rye Intermodal Ethanol Transfer Facility
DRAWN BY: JRM Johnston County, North Carolina p
S "e9 Nnr1hh'S1 51 A16ernar3e NC 28fJ01 7(14 - 926 -G4�7 v
NCBELS Firm license No. C -4660
CHECKED BY: AGD PROJECT NO: 2013 -791 /
20
F
blot" .
BY: AGD
DATE: 6/15
DWG. NO.: SOIL SURVEY.DWG
1 " = 3000'
Johnston County, North Carolina (NC101)
NOTE: INFORMATION SHOWN ON THIS MAP
PROVIDED BY USGS WEB SOIL SURVEY.
1.4
ACCURACY OF OF SOILS INFORMATION
Map Unit Symbol
SHALL BE CONSIDERED APPROXIMATE AND
Coc
FOR ILLUSTRATIVE PURPOSES ONLY.
Norfolk loamy sand, 0 to 2
GoA
percent slopes
NoA
Norfolk loamy sand, 2 to 6
NoB
/
Ra
Rains sandy loam, 0 to 2
Ud
percent slopes
Wt
Udorthents, loamy
6.9
Wehadkee loam, 0 to 2 percent
Totals for Area of Interest
F
blot" .
BY: AGD
DATE: 6/15
DWG. NO.: SOIL SURVEY.DWG
1 " = 3000'
Johnston County, North Carolina (NC101)
Map Unit Name Acres in AOI
Cowarts loamy sand, 6 to 10
1.4
percent slopes
Goldsboro sandy loam, 0 to 2
16.4
percent slopes
Norfolk loamy sand, 0 to 2
7.3
percent slopes
Norfolk loamy sand, 2 to 6
28.2
percent slopes
Rains sandy loam, 0 to 2
11.0
percent slopes
Udorthents, loamy
6.9
Wehadkee loam, 0 to 2 percent
11.9
slopes, frequently flooded
83.2
\`7fL
PROJECT SITE
PROPOSED
STORMWATER WETLAND
Percent of AOI
1.7%
19.8%
8.8%
33.9%
13.2%
8.3%
14.3%
100.0%
'
'O
h'171
go
Chambers Engineering, PA
129 North First St., Albemarle, NC 28001 704 - 984 -6427
NCBELS Firm License No. C -1660
ECO ENERGY - SELMA, NC I SOILS MAP
21
NoB
M
APPENDIX C
II/
i
DRAINAGE AREA FOR
STORMWATER WETLAND /.
AREA: 4.00 AC / Z-,-
_ ` \ 100% IMPERVIOUS
\ %f EX. JURISD IONIC
WETLAN
\ \. , /
STORMWATER WETLAND: ! �/ / �\j
WQV VOLUME: 14,520 CF
DRAWN BY: AGD �
DATE: 6/15 Chambers E _ ineering, PA
DWG. NO.: STORMWATER MAPS.DWG 129 North First St., Albemarle, NC 28001 704- 984 -6427
NCBELS Firm License No. C -1660
1" = 200' ECO ENERGY - SELMA, NC I STORMWATER MAP - POST CONSTRUCTION I APPENDIX D
a
"B"
SAND FILTER
SAND FILTER "A"
WQV ADJUST: 463 CF \ \
'%%� \ \ \\
WQV ADJUST: 1,007 CF
DRAINAGE AREA FOR
SAND FILTER "A"
DRAINAGE A E FOR
"A"
AREA: 0.17 AC
100% IMPERVIOUS
SAND FILTER
o
AREA: 0.37 AC
100% IMPERVIOUS
OFFICE BUILDING & /
EX. JURISDICTIONAL
PARKING
�\ \'!� WETLAND \ \
II/
i
DRAINAGE AREA FOR
STORMWATER WETLAND /.
AREA: 4.00 AC / Z-,-
_ ` \ 100% IMPERVIOUS
\ %f EX. JURISD IONIC
WETLAN
\ \. , /
STORMWATER WETLAND: ! �/ / �\j
WQV VOLUME: 14,520 CF
DRAWN BY: AGD �
DATE: 6/15 Chambers E _ ineering, PA
DWG. NO.: STORMWATER MAPS.DWG 129 North First St., Albemarle, NC 28001 704- 984 -6427
NCBELS Firm License No. C -1660
1" = 200' ECO ENERGY - SELMA, NC I STORMWATER MAP - POST CONSTRUCTION I APPENDIX D
a