HomeMy WebLinkAboutL48 ID 20230995 .pdfZb Z
qJ
S. Descnbe the eNisting land use or condition of the ssite at the time of this application (residential,
undeveloped. etc.): — ^' ! `�
o. Describe proposed work, linclude discussion as to how hardening of shoreline has been avoided, 4r
why it is necessary):
7. Will work be conducted from land? Ca_ From water?
8, Total amount of impacts below the normal pool lake level / Normal Water Level
Permanent 'mpacts (including all exccavation, ba fill, rip rap, retaining walls, etc.) in square feet:
Temporary impacts in square feet:
9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land-
wa rd
Perm anent„impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet:
Temporary impacts (temporary clearing, construction corridor) in square feet:
/.;L-
10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet
landward to be impacted (number of trees, for instance): O ^/4i 3 S
rn U 4:�d te- w,f /Z A*104
11. Signature
By signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate,
and complete to the best of my knowledge and belief
• The project propon hereby requests that the certifying authority review and take action on
this CWA 401 c ific ion request within the applicable reasonable period of time
00.
Own Agent's Signature' [15A NCAC 02H .0502 f ]
`Agent's signature is valid only if an authorization letter from the owner is provided.
2 �-�fwb� islic.
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
c' i I 11 a,. 1 1 n n I n� I I I % � � �n i n Ih'i r,�..
I � I- I lr. �,i M LPL, .UI•i•"Iirii.l
L
/Cato a�
��11w
/ .�k� Wry, f� � /� Air - U,,o � , �-•,
2" , zr% �-
J
Lake
(At Full Pond/ Normal Water Level) m
a
c
E
0
0 t
z
C
Side View
U-
I�rr i /,---L %-e /,�J
Vr97
IFull Pond/
Plan View
Lake
(At Full Pond/ Normal Water Level)
V t-4 v � l
Fol! Pond/ Normal Water L
lre
1"0 If
Sd1:.,«ul r�,rry
fl nNeS>SY
E
I
Plan View
e - — �DHLEO Q -
—d �
-(;�"2 /.
Lake
W f.# 9oW t.arrW w.ar 1!r«f l
Rlprap
EAsting Dock
'Oha>R
3It.I SO
SO— tug pond! rtwt
— .nf r nr.
�k.150n
►.t+rl.< f o P—v NJh
AMf-�I%l.'E
;' :. Le l>cp aloxni f,t Lrecrc, nnxntel lnnhfS R P" I.non "f 11 atrr kl:"Iuf.r,
�'h �: r,hur•. lh.ct lel 7%I•ul Scrvi�c r'ca:cr j 1c11,,:h `il}I fodu2,27,111 ul .'
�y