Loading...
HomeMy WebLinkAboutL48 ID 20230995 .pdfZb Z qJ S. Descnbe the eNisting land use or condition of the ssite at the time of this application (residential, undeveloped. etc.): — ^' ! `� o. Describe proposed work, linclude discussion as to how hardening of shoreline has been avoided, 4r why it is necessary): 7. Will work be conducted from land? Ca_ From water? 8, Total amount of impacts below the normal pool lake level / Normal Water Level Permanent 'mpacts (including all exccavation, ba fill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land- wa rd Perm anent„impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: /.;L- 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): O ^/4i 3 S rn U 4:�d te- w,f /Z A*104 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project propon hereby requests that the certifying authority review and take action on this CWA 401 c ific ion request within the applicable reasonable period of time 00. Own Agent's Signature' [15A NCAC 02H .0502 f ] `Agent's signature is valid only if an authorization letter from the owner is provided. 2 �-�fwb� islic. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation c' i I 11 a,. 1 1 n n I n� I I I % � � �n i n Ih'i r,�.. I � I- I lr. �,i M LPL, .UI•i•"Iirii.l L /Cato a� ��11w / .�k� Wry, f� � /� Air - U,,o � , �-•, 2" , zr% �- J Lake (At Full Pond/ Normal Water Level) m a c E 0 0 t z C Side View U- I�rr i /,---L %-e /,�J Vr97 IFull Pond/ Plan View Lake (At Full Pond/ Normal Water Level) V t-4 v � l Fol! Pond/ Normal Water L lre 1"0 If Sd1:.,«ul r�,rry fl nNeS>SY E I Plan View e - — �DHLEO Q - —d � -(;�"2 /. Lake W f.# 9oW t.arrW w.ar 1!r«f l Rlprap EAsting Dock 'Oha>R 3It.I SO SO— tug pond! rtwt — .nf r nr. �k.150n ►.t+rl.< f o P—v NJh AMf-�I%l.'E ;' :. Le l>cp aloxni f,t Lrecrc, nnxntel lnnhfS R P" I.non "f 11 atrr kl:"Iuf.r, �'h �: r,hur•. lh.ct lel 7%I•ul Scrvi�c r'ca:cr j 1c11,,:h `il}I fodu2,27,111 ul .' �y