Loading...
HomeMy WebLinkAbout17BP.3.R.48 Onslow Br. #134 over Gibson Branch Temp Impacts NCDOT Closeout Request SignedSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR August 10, 2022 Mr. Tom Steffens 2407 West Fifth Street Washington, NC 27889 J. ERic BOYETTE SECRETARY Re: Temporary Impact Site Onslow Bridge 4134 over Gibson Branch, 17B.3.R.48 COE SAW-2017-0238, DWR Project No. 20171428 Mr. Steffens: As you are aware, the Department has monitored the temporary impact site Onslow Bridge 9134 over Gibson Branch since construction was completed in January 2020. The site is located in Onslow County on White Oak River Road (SR 1331) over Gibson Branch. Impacts at the site were comprised of 0.11 Ac temporary fill in riparian wetlands. The impacted areas where the temporary impacts occurred were replanted with the appropriate wetland tree species and monitored to ensure they re -attained pre -project wetland functions. According to permit conditions, NCDOT was required to monitor the temporary impact sites annually for three growing seasons or until success criteria were met, with visual vegetation monitoring conducted each year. Hydrologic monitoring was not required for this project. During the monitoring period, annual monitoring reports were submitted to the appropriate regulatory agencies via the Environmental Analysis Unit (EAU) website: https: //connect. ncdot. gov/resources/Environmental/EAU/Monitoring-Stewardship/Pa es/default. aspx After three years of vegetation monitoring, the temporarily impacted area is stable and the planted species are surviving. Individual annual monitoring data is provided within the monitoring reports available on EAU's website for years 2020 through 2022. Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH, NC 27699-1598 Telephone: (919) 707-6000 Fax: (919) 212-5785 Customer Service: 1-877-368-4968 Website: wwwmcdot.eov Location: CENTURY CENTER BUILDING A 1020 BIRCH RIDGE DRIVE RALEIGH, NC 27610 On August 1, 2023 and August 10, 2023 respective site visits by USACE and NCDWR were conducted. It was determined that the site success criteria had been met and that no further monitoring would be required. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 707-6121. Sincerely, DocuSigned by: w• G . 44. B8BFC9470D9E461... For Jamie Lancaster, P.E., Unit Head Environmental Analysis Unit cc: Ms. Amy Chapman, NCDWR Mr. Monte Matthews, USACOE Mr. Tom Steffens, USACOE Ms. Hanna Sprinkle, NCDWR Mr. Travis Wilson, NCWRC Ms. Kim Harding, NCDMF Ms. Amanetta Sommerville, USEPA Mr. Gary Jordan, USFWS Mr. David Harris, P.E., NCDOT-REU Ms. Jon Giles, NCDOT- Division 3 Mr. Randy Griffin, NCDOT-EAU