Loading...
HomeMy WebLinkAboutNCC232414_ESC Approval Submitted_20230811 Town of• nterssilleT NORTH CAROLINA July 27, 2023 LETTER OF APPROVAL —EROSION CONTROL PLANS Vermillion Anchor Mill Village, LLC ATTN: Mr. Robert Bowman 13815 Cinnabar Place Huntersville, NC 28078 RE: Project Name: Vermillion Village Disturbed Acres Approved: 25.20 Project ID: 435061 County: Mecklenburg City: Huntersville Address: 12145 Huntersville-Concord Road River Basin: Yadkin Pee-Dee Stream Classification: C Submitted By: Gene Hinkle Date Accepted for Review: April 1, 2022 Plan Type: Commercial Dear Mr. Bowman, This office has reviewed the subject commercial site plan including the erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval as Noted. The Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Zoning Conditions: 1. Phasing of development subject to R20-05 2. Apartment subject to elevations approved as a part of R20-07 3. An as-built/installed lighting certification sealed by a registered engineer stating that all site lighting is installed according to an approved site plan shall be required prior to issuance of a certificate of occupancy Letter of Approval Vermillion Anchor Mill Village, LLC July 27, 2023 Page 2 of 3 4. Final plat required prior to CO issuance for right-of-way dedication, tree save, required easements, open space, etc. 5. Roadway improvements regarding the sidewalk crossing at Huntersville- Crossing Road to be approved separately 6. Development subject to all conditions of R20-05 As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are Letter of Approval Vermillion Anchor Mill Village, LLC July 27, 2023 Page 3 of 3 requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. No work shall begin on site prior to the pre-construction meeting. Please contact the Town of Huntersville Erosion Control Coordinator,Anne Loftin at (704) 579-1090, or via email at aloftin@huntersville.org to set up a pre-construction meeting after providing the Recorded PCO19 Form and after obtaining your Certificate of Coverage (COC) from NCDEQ. Please refer to the attached Fact Sheet for additional information. The Financially Responsible Owner (FRO) is responsible for ensuring this project meets all federal, state, and local town codes, ordinances and standards. Approved and stamped plans are accessible through the "Approved Package" section in EPM for print. Please always keep one set of stamped plans onsite. Your cooperation is appreciated. Sincerely, Lauren Speight, CZO Senior Planner I Town of Huntersville Enclosures: e-NOI Tips for Applicants NPDES NCGO1 Fact Sheet Huntersville Sediment and Erosion Control Ordinance cc: Town of Huntersville Planning Department- Lauren Speight Town of Huntersville Engineering-Andrew Cheek Town of Huntersville Construction Engineer-Kevin Garton Town of Huntersville Erosion Control Coordinator-Anne Loftin Town of Huntersville Executive Assistant Engineering-Jane Pethel Town of Huntersville Land Development Inspector-Cecil Talbot Town of Huntersville Bond Administrator-Kim Behrenbrinker Mecklenburg County GIS-Angela Johnson CSS,Inc.-Gene Hinkle File Path: M:\PLANNING\Subdivisions\Vermillion Village\Preliminary Plans\Redlines&Approved Plans\(#435061)\Approved Package(#435061)