HomeMy WebLinkAboutNCC203127_NOT Closeout Documents_20230807 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
County: Cumberland Project: Eastover Sanitary District Operations River basin: Cape Fear
Person financially responsible:Eastover Sanitary District-Talmage S Baggett, Project#: CUMBE-2021-005
Manager NCC203 127
Address: 3876 Dunn Road,Eastover,NC 28312
1. Project Location: Dunn Road,Eastover
Pictures: No
2. Weather and soil conditions: Dry/Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one on site Title:
Inspection report: Sent Report Date given/sent: July 26,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG010000)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Bailey Taylor Others present:
Date of inspection: July 26,2023 Time arriving on site: 12:00 PM Time leaving site: 12:13 PM
cc: