HomeMy WebLinkAbout20150674 Ver 1_401 Application_20150715Brown's Environmental Group, Inc.
Karen Higgins
NCDWR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699 — 1617
Re: PCN application Johnston County
Karen
Wetlands, Soils, Permitting
Brownenvgrp @gmail.com
919 -524 -5956
JUL 0 9 2015
D -NR . WA- --
401 &BUFF OR kESUUi�CES
Pi=t MIAIJG
I'm enclosing 3 copies of PCN and maps for a crossing in a S/D in Johnston County. On
February 3, 2015 James Graham call the section of the crossing exempt from Neuse
Buffer Rules. David Schaffer with the COE approved the JD on March 11, 2015.
I am enclosing a fee of $240.00. I have sent an electronic copy to Cherri Smith in case
you need a copy.
Thank you
Wyatt own, SS, CPESC
President
Brown's Environmental Group, Inc
0
F WAIF
�� 9p Office use Only:
O G
2 0 0 6 T4 Corps action ID no.
p n Q o y DWQ project no.
' Form Version 1.3
,,Deck 10 2008
Pre - Construction Notification (PCN) Foiin]F rf-'&
A. Applicant Information --
1. Processing
1 a. Type(s) of approval sought from the
Corps: ®Section 404 Permit E] Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? I ® Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes ® No ❑ Yes ® No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
[]Yes ® No
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
I El Yes ® No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
I ❑ Yes ® No
2. Project Information
2a. Name of project: Brookside S/D
2b. County: I Johnston
2c. Nearest municipality /town: I Clayton
P VV/ rp n f
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
n "__11)111
tl JUL u g ���
2015
401J& ENf Ff� R; =SOr? S f
Clayton NDJC LLC
Deed 04395 Page 0478
Nathan Evans
PO Box 189.
Smithfield, NC 27528 -0189
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
I4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
{ 4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Wyatt Brown
Browns Environmental
Group, Inc
242 Batten Farm Road
Selma, NC 27576
919- 524 -5956
brownenvgrp @gmail.com
Page 2 of 10
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
II 1a. Property identification no. (tax PIN or parcel ID): 1 165801 -17 -0116
1 b. Site coordinates (in decimal degrees): I Latitude: 35.63565
(DD.DDDDDD)
1c. Property size: 21 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to I UT to Hannah Creek
proposed project:
2b. Water Quality Classification of nearest receiving water. C,NSWI
2c. River basin: I Neuse
1
Longitude: - - 78.49254
(- DD.DDDDDD) l
1
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Yellow Pine Forest
3b. List the total estimated acreage of all existing wetlands on the property:
6.1 acres
13c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
2300 ft..
13d. Explain the purpose of the proposed project:
Tract is to be developed as single family residence lots
3e. Describe the overall project in detail, including the type of equipment to be used:
I crossing will be installed for access to property across the wetland, culvert will be installed in the crossing by trackhoe
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ®Yes El No Unknown
project (including all prior phases) in the past?
Comments: David Schaffer
4b. If the Corps made the jurisdictional determination, what type
of determination was made? I E] Preliminary ®Final
4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Brown's Env. Group, Inc
Name (if known): Wyatt Brown I Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Wetlands -David Schaffer,COE 3/11/15, Stream Buffer Determination -James Graham, 2/3/15
5. Project History
5a. Have permits or certifications been requested or obtained for I ❑ Yes ® No
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
S. Future Project Plans
6a. Is this a phased project? I ❑ Yes ® No
6b. If yes, explain.
❑ Unknown
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
I. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
®
Wetlands, ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
I{ If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or (if known)
DWQ — non -404, other)
(acres)
Temporary (T)
W1 ®P ❑ T install 75 If of 36
in. Culver and fill
®Yes
❑ No
®Corps
® DWQ
.0086
❑ Yes
❑ Corps
W2 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W3 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W4 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W5 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
1 V46 o P ❑ T
❑ No
❑ DWQ
2g. Total wetland impacts
.0086 ac
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c.
3d.
3e.
3f. 3g•
Stream impact Type of impact Stream name
Perennial
Type of jurisdiction
Average Impact
number -
(PER) or
(Corps - 404, 10
stream length
Permanent (P) or
intermittent
DWQ — non -404,
width (linear
feet)
Temporary (T)
(INT)?
other)
(feet)
S1 ®P ❑ T install 75 If of 36 unnamed trib
in. culvert
❑ PER
® INT
® Corps
® DWQ
3 ft 75
❑ PER
❑ Corps
S2 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S3 ❑ P ❑ T
I
❑ INT
❑ DWQ
❑ PER
❑ Corps
S4 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S5 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S6 ❑ P ❑ T
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
64 If.
1 3i. Comments:
Page 4 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary (T)
01 ❑POT I I
02 ❑PoT
03 OPOT
04 OPEIT
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 15c.
Pond ID Proposed use or purpose
number of pond
P1
P2 I f
15f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
5i. Expected pond surface area (acres):
I` 5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
Wetland Impacts (acres)
5d. 5e.
Stream Impacts (feet) I Upland
Flooded Filled Excavated I Flooded I Filled
❑ Yes ❑ No If yes, permit ID no:
(acres)
Excavated I Flooded
I
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ❑ Tar - Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason
Buffer
Permanent (P) or for
Stream name mitigation
Temporary (T) impact
required?
B1 ❑PE]T
I
I
I E] Yes
❑ No
B2 ❑PQT
I
I
I ❑Yes
❑ No
B3 ❑ P❑ T I
I
I❑
Yes
I
l
❑ No
6h. Total buffer impacts
6i. Comments: Determined not subject by James Graham, NC Water Quality,
Zone 1 impact Zone 2 impact
(square feet) (square feet)
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
We are crossing the wetland at the most narrow section to minimize impact.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Care will be taken to install culvert during dry weather conditions as possible, care taken to avoid trees
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply):
2c. If yes, which mitigation option will be used for this
project?
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
3c. Comments:
❑ Yes ® No
❑ DWQ ❑ Corps
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
Type I Quantity
14. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached. I ❑ Yes
4b. Stream mitigation requested: I linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non - riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
G. Complete If Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ` ❑ Yes ® No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the I
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet) 11
Zone 1 3 (2 for Catawba) f
Zone 2 1.6
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 30.35%%
2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Johnston County Storm Water will be in
charge of review
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Johnston County
❑ Phase II
3b. Which of the following locally- implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a. Which of the following state - implemented stormwater management programs apply ❑ ORW
(check all that apply): ❑ Session Law 2006 -246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes F1 No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
IF. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ® No
use of public (federal /state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes ".to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after- the -fact permit application?
❑ Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or I El Yes ®No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act I ❑ Yes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Natural Heritage Program,
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
hftp://www.habitat.noaa.gov/protection/efh/habitatmapper.htmi
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation El Yes No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Dept. Cultural Resources, Historic Preservation Office
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain? 10 Yes
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Flood Maps
Wyatt Brown Q
Applicant/Agent's Printed Name pp t/ gents Signature
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
0
June 26, 2015
Date
Page 10 of 10
PCN Form — Version 1.3 December 10, 2008 Version
Information represented here.
Result 1
id:
05GO3003Z
Tag:
05GO3003Z
Tax Unique Id:
4235470
NCPin:
165801 -17 -0116
Mapsheet No:
165801
Owner Name 1:
CLAYTON NDJC LLC
Owner Name 2:
Mail Address 1:
Mail Address 2:
PO BOX 189
Mail Address 3:
CLAYTON, NC 27528 -0189
Site Address 1:
Site Address 2:
Book:
04395
Page:
0478
Market Value:
75070
Assessed Acreage:
20.88
Calc. Acreage:
21.01
Sales Price:
213000
Sale Date:
2013 -12 -23
:) page scaling.)
Johnston County GIS
June 25, 2015
I
Dalton Engineering
and Associates, P. A.
40
vi F T L.A
rr)'
I NIT 'T Rt
it