Loading...
HomeMy WebLinkAbout20150674 Ver 1_401 Application_20150715Brown's Environmental Group, Inc. Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 — 1617 Re: PCN application Johnston County Karen Wetlands, Soils, Permitting Brownenvgrp @gmail.com 919 -524 -5956 JUL 0 9 2015 D -NR . WA- -- 401 &BUFF OR kESUUi�CES Pi=t MIAIJG I'm enclosing 3 copies of PCN and maps for a crossing in a S/D in Johnston County. On February 3, 2015 James Graham call the section of the crossing exempt from Neuse Buffer Rules. David Schaffer with the COE approved the JD on March 11, 2015. I am enclosing a fee of $240.00. I have sent an electronic copy to Cherri Smith in case you need a copy. Thank you Wyatt own, SS, CPESC President Brown's Environmental Group, Inc 0 F WAIF �� 9p Office use Only: O G 2 0 0 6 T4 Corps action ID no. p n Q o y DWQ project no. ' Form Version 1.3 ,,Deck 10 2008 Pre - Construction Notification (PCN) Foiin]F rf-'& A. Applicant Information -- 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit E] Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? I ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes ® No ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation []Yes ® No of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h I El Yes ® No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? I ❑ Yes ® No 2. Project Information 2a. Name of project: Brookside S/D 2b. County: I Johnston 2c. Nearest municipality /town: I Clayton P VV/ rp n f 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: n "__11)111 tl JUL u g ��� 2015 401J& ENf Ff� R; =SOr? S f Clayton NDJC LLC Deed 04395 Page 0478 Nathan Evans PO Box 189. Smithfield, NC 27528 -0189 Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version I4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: { 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Wyatt Brown Browns Environmental Group, Inc 242 Batten Farm Road Selma, NC 27576 919- 524 -5956 brownenvgrp @gmail.com Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification II 1a. Property identification no. (tax PIN or parcel ID): 1 165801 -17 -0116 1 b. Site coordinates (in decimal degrees): I Latitude: 35.63565 (DD.DDDDDD) 1c. Property size: 21 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to I UT to Hannah Creek proposed project: 2b. Water Quality Classification of nearest receiving water. C,NSWI 2c. River basin: I Neuse 1 Longitude: - - 78.49254 (- DD.DDDDDD) l 1 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Yellow Pine Forest 3b. List the total estimated acreage of all existing wetlands on the property: 6.1 acres 13c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2300 ft.. 13d. Explain the purpose of the proposed project: Tract is to be developed as single family residence lots 3e. Describe the overall project in detail, including the type of equipment to be used: I crossing will be installed for access to property across the wetland, culvert will be installed in the crossing by trackhoe 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No Unknown project (including all prior phases) in the past? Comments: David Schaffer 4b. If the Corps made the jurisdictional determination, what type of determination was made? I E] Preliminary ®Final 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Brown's Env. Group, Inc Name (if known): Wyatt Brown I Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Wetlands -David Schaffer,COE 3/11/15, Stream Buffer Determination -James Graham, 2/3/15 5. Project History 5a. Have permits or certifications been requested or obtained for I ❑ Yes ® No this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. S. Future Project Plans 6a. Is this a phased project? I ❑ Yes ® No 6b. If yes, explain. ❑ Unknown Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory I. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands, ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts I{ If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) W1 ®P ❑ T install 75 If of 36 in. Culver and fill ®Yes ❑ No ®Corps ® DWQ .0086 ❑ Yes ❑ Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W5 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps 1 V46 o P ❑ T ❑ No ❑ DWQ 2g. Total wetland impacts .0086 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear feet) Temporary (T) (INT)? other) (feet) S1 ®P ❑ T install 75 If of 36 unnamed trib in. culvert ❑ PER ® INT ® Corps ® DWQ 3 ft 75 ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T I ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 64 If. 1 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary (T) 01 ❑POT I I 02 ❑PoT 03 OPOT 04 OPEIT 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 15c. Pond ID Proposed use or purpose number of pond P1 P2 I f 15f. Total 5g. Comments: 5h. Is a dam high hazard permit required? 5i. Expected pond surface area (acres): I` 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) Wetland Impacts (acres) 5d. 5e. Stream Impacts (feet) I Upland Flooded Filled Excavated I Flooded I Filled ❑ Yes ❑ No If yes, permit ID no: (acres) Excavated I Flooded I If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Permanent (P) or for Stream name mitigation Temporary (T) impact required? B1 ❑PE]T I I I E] Yes ❑ No B2 ❑PQT I I I ❑Yes ❑ No B3 ❑ P❑ T I I I❑ Yes I l ❑ No 6h. Total buffer impacts 6i. Comments: Determined not subject by James Graham, NC Water Quality, Zone 1 impact Zone 2 impact (square feet) (square feet) Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. We are crossing the wetland at the most narrow section to minimize impact. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Care will be taken to install culvert during dry weather conditions as possible, care taken to avoid trees 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): 2c. If yes, which mitigation option will be used for this project? 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) 3c. Comments: ❑ Yes ® No ❑ DWQ ❑ Corps ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation Type I Quantity 14. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. I ❑ Yes 4b. Stream mitigation requested: I linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: G. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ` ❑ Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the I amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) 11 Zone 1 3 (2 for Catawba) f Zone 2 1.6 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 30.35%% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Johnston County Storm Water will be in charge of review 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Johnston County ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes F1 No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version IF. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes ".to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or I El Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act I ❑ Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Program, 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp://www.habitat.noaa.gov/protection/efh/habitatmapper.htmi 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation El Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Dept. Cultural Resources, Historic Preservation Office 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? 10 Yes 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Maps Wyatt Brown Q Applicant/Agent's Printed Name pp t/ gents Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 0 June 26, 2015 Date Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version Information represented here. Result 1 id: 05GO3003Z Tag: 05GO3003Z Tax Unique Id: 4235470 NCPin: 165801 -17 -0116 Mapsheet No: 165801 Owner Name 1: CLAYTON NDJC LLC Owner Name 2: Mail Address 1: Mail Address 2: PO BOX 189 Mail Address 3: CLAYTON, NC 27528 -0189 Site Address 1: Site Address 2: Book: 04395 Page: 0478 Market Value: 75070 Assessed Acreage: 20.88 Calc. Acreage: 21.01 Sales Price: 213000 Sale Date: 2013 -12 -23 :) page scaling.) Johnston County GIS June 25, 2015 I Dalton Engineering and Associates, P. A. 40 vi F T L.A rr)' I NIT 'T Rt it