July 27, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Carolinas, LLC
Attention: Kevin Mason, Sr. Transmission Permitting Manager
526 South Church Street
Charlotte,North Carolina 28202-1006
RE: Project Name: Sweetwater Ret Tap Hickory B &W 100kV Relocation
Project ID: CATAW-2024-002
Acres Approved: 10.13
County: Catawba
City: Hickory
Location: 11 th Avenue SE
River Basin: Catawba
Stream Classification: Other
Submitted By: Duke Energy Carolinas, LLC
Date Received by LQS: Jul 25, 2023
Plan Type: New
Dear Mr. Mason:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of
approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNO1) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNO1 form may be accessed at deq.nc.gov/NCG01.
Please direct questions about the eNOI form to the Stormwater Program staff the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at
the job site:
jNorth Dme of E Quality I D of Energy, and D
'��� MooresvilleCarolina Regionalepart Officent 1610nvironmental East Center Avenueualit ,Suiteivision 301 1 MooresvilleMineral,North CarolinaLand 28115Resources
NORTH CAROLINA
oecaro�em of EnmronmenNI fl I7 704.663.1699
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
July 27, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
A`tuk#P ?t ` i
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
ZSK/cys
Enclosure: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Duke Energy Carolinas, LLC
Attention: Neal Cary Neal.cary@duke-energy.com
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
July 27, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Sweetwater Ret Tap Hickory B &W 100KV Relocation
Project ID: CATAW-2024-002
County: Catawba
Reviewed by: Zahid S. Khan
1. Avoid temporary stream crossings when possible. Attempt to complete the proposed construction
separately on each side and leave natural buffer zones along the streams. Employ appropriate measures to
ensure protection of streams and other water bodies (see section 6.70 of the Erosion and Sediment Control
Planning and Design Manual).
2. Before the initiation of any construction related activity, revise the Financial Responsibility/Ownership
Form to include the deed book and page numbers of all properties in the project tract and submit copies of
these property deeds. Provide a copy of the final utility easement agreement or the landowner's signed and
dated written consent for the applicant to submit a draft erosion and sedimentation control plan and to
conduct the anticipated land disturbing activity.
3. Local government and other agencies may have additional requirements apart from 404 permitting and 401
certifications. Before the initiation of any construction related activity, submit all copies to this office of
any water quality certifications,buffer authorizations, or related permitting necessary to complete the
proposed construction.
4. Additional measures may be required- The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]