Loading...
HomeMy WebLinkAbout20150070 Ver 1_More Info Received_20150709Strickland, Bev From: Dev ne,8ovd Sent: Friday, July lU'ZUl5ll:3UAK4 To: Strickland, Bev Subject: FVV:vviU need some additional informaton From: Allen, ]oshua [nlaiKo:1a|lenVcbnlcadanlscoconl Sent: Thursday, ]uhO9, 2015 11:56 AM To: Oevane,Boyd Cc: Aldridge, ]on;Reddick, Rob; 'Fierson,]on Subject: RE: will need some additional informaton Good morning Boyd- Attached are the Stormfilter supplements and O&M agreements, as requested. We're being pressed pretty hard by our client for approval, so if you could let us know if this information is sufficient at your earliest convenience, we would greatly appreciate it Josh Allen, PE, CFM Office: 919-361-5000 Direct: 919-287-0798 | | [� . . Designing Tomorrow's Infrastructure &Communities From: Reddick,Rob Sent: Monday, June UO 2015 2:50 PM To: 'Pierson,Jon' Cc: Allen, Joshua; Aldridge, ]on Subject: FW: will need some additional informaton 5� a =9 1 Received some feedback from Mr. Boyd today on the stormvvaterplans. He needs a little more information per his email below. Thanks. Rob From: Devane, Boyd [mai|to:bovd.devane@ncdenr.Rov Sent: Monday, June UO 2015 2:26PM To: Reddick,Rob Subject: will need some additional informaton This note is not an official notification but you will get an email or letter soon, sent by the appropriate staff member, documenting our need. However, in order to let you know as soon as possible, I'm sending you this note directly so you can get working on this information as soon as possible. The information needed is specified in the "ContechSupp|ement sheet. VVe will need that sheet along with the Required Item Checklist and the O&M agreement. They can all be found on the DEMLK web page at: http://porta|.ncdenr.orR/vveb/|r/bmp'manua| Go to BMP Supplement Forms and then to "Proprietary Systems". See the bottom of the Excel table for the checklist and example Supplement sheet. Let me know if you have questions. smallomrr*qwna*ncwm and nnmmimeona*,immuNwommww o puumpZcon:JmI mw and may u*aimmmwammli'dpmmwm N Peak Flow Calculations 1 -yr, 24 -hr runoff depth 1 -yr, 24 -hr intensity Pre - development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Pre /Post 1 -yr, 24 -hr peak control Storage Volume Design volume (WQV) Adjusted water quality volume (WQVAdj) Volume contained before filter -iff Coefficient (Rv) s loading calculations Mean Annual Rainfall, P Agency required TSS% removal Percent Runoff Capture (% capture) Event Mean Concentration of Pollutant, EMC Filter System Cartridge height Specific Flow Rate, q SHWT elevation Bottom of the StormFilter vault elevation Clearance (dSHwT) Time to drain the StormFilter (t) Time to drain the StormFilter (t) SUMMARY Maximum Treatment Flow Rate, cfs Number of Cartridges Additional Information Does volume in excess of the design volume bypass the filter? Is an off -line flow - splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? 9MP located at least 30ft from surface waters (5Oft if SA waters)? r, a vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? 2.92 in 0.12 in /hr 0.99 ft/sec 0.89 ft3/sec 0.10 ft3/sec 4,978.50 ft3 3.733.8$ ft3 OK 3,900.00 ft3 0.67 (unitless) 45.00 in 85.00% 90.00% (Suggestion: Use 60 for residential, 70 for Commercial, 100 60.00 mgll for Industrial) 27.00 in 1.00 gpm /ft2 697.00 ft amsl 698.00 ft amsl 1.90 48.00 hours OK Submit drainage calculations. 2,00 days 0.13 8.00 y Y or N OK y Y or N OK y Y or N OK 38.00 ft y Y or N OK y Y or N OK y Y or N OK y Y or N OK Form SW401- StormFilter -Rev 1 2012Aug Parts I and It Project Design Summary, Page 1 of 1 Permit Number (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM � 401 CERTIFICATION APPLICATION FORM �r %wNTEGH'STORMFILTER SUPPLEMENT 4�+ ENGINEERED SOLUTIONS cs L®ENR This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section Ill) and the 0 &M Agreement _ F PROJECT INFORMATION Project name Willowcroft Contact name Josh Allen Phone number 919 - 361 -5000 Date June 8, 2015 Drainage area number Subbasin 1 II. DESIGN INFORMATION Site Characteristics Drainage area (AD) 89,298.36 ft' Insufficient drainage area. The maximum contributing Impervious area 61,419.85 ft2 % Impervious (IA) 68.8% % Design rainfall depth (RD) 1.00 in Peak Flow Calculations 1 -yr, 24 -hr runoff depth 1 -yr, 24 -hr intensity Pre - development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Pre /Post 1 -yr, 24 -hr peak control Storage Volume Design volume (WQV) Adjusted water quality volume (WQVAdj) Volume contained before filter -iff Coefficient (Rv) s loading calculations Mean Annual Rainfall, P Agency required TSS% removal Percent Runoff Capture (% capture) Event Mean Concentration of Pollutant, EMC Filter System Cartridge height Specific Flow Rate, q SHWT elevation Bottom of the StormFilter vault elevation Clearance (dSHwT) Time to drain the StormFilter (t) Time to drain the StormFilter (t) SUMMARY Maximum Treatment Flow Rate, cfs Number of Cartridges Additional Information Does volume in excess of the design volume bypass the filter? Is an off -line flow - splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? 9MP located at least 30ft from surface waters (5Oft if SA waters)? r, a vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? 2.92 in 0.12 in /hr 0.99 ft/sec 0.89 ft3/sec 0.10 ft3/sec 4,978.50 ft3 3.733.8$ ft3 OK 3,900.00 ft3 0.67 (unitless) 45.00 in 85.00% 90.00% (Suggestion: Use 60 for residential, 70 for Commercial, 100 60.00 mgll for Industrial) 27.00 in 1.00 gpm /ft2 697.00 ft amsl 698.00 ft amsl 1.90 48.00 hours OK Submit drainage calculations. 2,00 days 0.13 8.00 y Y or N OK y Y or N OK y Y or N OK 38.00 ft y Y or N OK y Y or N OK y Y or N OK y Y or N OK Form SW401- StormFilter -Rev 1 2012Aug Parts I and It Project Design Summary, Page 1 of 1 Permit No. (to be provided by DWQ) 1111. (REQUIRED ITEMS CHECKLIST _J__ JE �i Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. Form SW401 -Sand Filter -Rev.5 2009Sept17 Part III, Page 1 of 1 �._ 1. Plans (1" = 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for StormFilter showing: - System dimensions (length, width, and depth), - Maintenance access, - Flow splitting device, - Vegetative filter strip dimensions and slope (if SA waters), - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. 3. Section view of the StormFilter Vault (1/4" =1'0" or larger) showing: - Depth(s) of the vault containing StormFilter cartridges, - Number of cartridges, - Cartridges specifications, - SHWT elevation, and - Outlet pipe. 4. A soils report that is based upon an actual field investigation and soil borings. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 7&L 5. Supporting calculations (including drainage calculations) 6. Signed and notarized operation and maintenance (0 &M) agreement 7. A copy of the deed restrictions (if required). Form SW401 -Sand Filter -Rev.5 2009Sept17 Part III, Page 1 of 1 Permit Number (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORMa� A Arc �w ---� —� C ,04TECH'STORMFILTER SUPPLEMENT r 4CDEHR ENGINEERED SOLUTIONS < This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section tlt ) and the 0 &M Ayreetnent I. PROJECT INFORMATION Project name Willowcroft Contact name Josh Allen Phone number 919 - 361 -5000 Date June 8, 2015 Drainage area number Subbasin 1 II. DESIGN INFORMATION Site Characteristics Drainage area (AD) Impervious area % Impervious (IA) Design rainfall depth (RD) Peak Flow Calculations 1 -yr, 24 -hr runoff depth 1 -yr, 24 -hr intensity Pre - development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Pre /Post 1 -yr, 24 -hr peak control Storage Volume Design volume (WQV) Adjusted water quality volume (WQVAdj) Volume contained before filter ff Coefficient (Rv) s loading calculations Mean Annual Rainfall, P Agency required TSS% removal Percent Runoff Capture (% capture) Event Mean Concentration of Pollutant, EMC Filter System Cartridge height Specific Flow Rate, q SHWT elevation Bottom of the StormFilter vault elevation Clearance (dSHWT) Time to drain the StormFilter (t) Time to drain the StormFilter (t) SUMMARY Maximum Treatment Flow Rate, cfs Number of Cartridges Additional Information Does volume in excess of the design volume bypass the filter? Is an off -line flow - splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? I 3MP located at least 30ft from surface waters (50ft if SA waters)? A. a vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? 645,997.38 ftZ Insufficient drainage area. The maximum contributing 207,782.03 ft' 32.2% % 1.00 in 2.92 in 0.12 in /hr 0.99 ft 3 /sec 0.89 ft3 /sec 0.10 }t3 /sec 18,275.20 ft3 ft3 OK 13,706.40 ft' 0.34 (unitless) 45.00 in 85.00% 90.00% 60.00 mgll (Suggestion: Use 60 for residential, 70 for Commercial, 100 for Industrial) 27.00 in 1.00 gpm /ftz 697.00 ft amsl 697.10 ft amsl 0.10 48.00 hours OK. Submit drainage calculations. 2.00 days 0.48 29.00 X Y or N OK y Y or N OK rKes 11 we] Irl 60.00 ft y YorN OK y Y or N OK y YorN OK Y or N OK Form SW401 -Storm Filter-Rev 1 2012Aug Parts I and 11. Project Design Summary, Page 1 of 1 Permit N©. (to be provided by DWQ) 1111. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1. Plans (1" = 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for StormFilter showing: Form SW401 -Sand Filter -Rev.5 2009Sept17 Part III, Page 1 of 1 - System dimensions (length, width, and depth), - Maintenance access, - Flow splitting device, - Vegetative filter strip dimensions and slope (if SA waters), - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. 3. Section view of the StormFilter Vault (114" =1'0" or larger) showing: - Depth(s) of the vault containing StormFilter cartridges, - Number of cartridges, - Cartridges specifications, - SHWT elevation, and - Outlet pipe. 4. A soils report that is based upon an actual field investigation and soil borings. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 5. Supporting calculations (including drainage calculations) 6. Signed and notarized operation and maintenance (0 &M) agreement 7. A copy of the deed restrictions (if required). Form SW401 -Sand Filter -Rev.5 2009Sept17 Part III, Page 1 of 1 Permit Number: (to be provided by DWQ) StormFilter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the StormFilter. — The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. The StormFilter system will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. Entire BMP Adjacent pavement (if applicable) Flow diversion structure StormFilter Cartridges Trash/ debris is present. Sediment is present on the pavement surface. The structure is clogged. The structure is damaged. Cartridges not performing as designed - see Contech I &M document to determine if cartridge Remove the trash/ debris. Sweep or vacuum the sediment as soon as possible. Unclog the conveyance and dispose of any sediment offsite. Make any necessary repairs or replace if damage is too large for repair. Replace cartridges per manufacturer's recommendations. maintenance is required. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water have occurred at the outlet. Quality 401 Oversight Unit at 919 -733- 1786. Permit Number: (lo be provided by DWQ) All other operation and maintenance activities should be in accordance with Contech's StormFilter Inspection and Maintenance Procedures document. Any problems that are found shall be repaired immediately. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above and have received and understand Contech's StormFilter Inspection and Maintenance Procedures document. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Willoweroft BMP drainage area number:South Print name:Robert Price Title:Land Construction Manager Address: 11605 N. Community House Road Phone: 704-944--&23 9 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. mss'' 1/ , I, �rW ( l,�Y ✓wV / , a Notary Pit4k for the State f County of , do hereby certify that j�'f e- personally appeared before me this day of 6 , and acknowledge the due execution of the forgoing sand filter maintenance requirements. fitness my hand and official seal, Andrea T Turner Notary Public Mecklenburg County, North Carolina My Commission Expires 06 -19 -18 SEAL I My comm ,�y ission expires I d — lq -` I Q )