Loading...
HomeMy WebLinkAbout20050732 Ver 30_More Info Received_20150709Strickland, Bev From: Devane, Boyd Sent: Thursday, July 09, 2015 2:04 PM To: Strickland, Bev Subject: Briar Chapel - Boulder Point Dr. BMP #18 - #05 -0732 v30 From: Gareth Avant [mailto:GAvant @mckimcreed.com] Sent: Wednesday, July 08, 2015 3:55 PM To: Devane, Boyd Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 MV 10011101 From: Devane, Boyd rmailto :bovd.devane(d)ncdenr.gov] Sent: Wednesday, July 08, 2015 1:31 PM To: Gareth Avant Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 From: Gareth Avant rmailto :GAvantCa)mckimcreed.comI Sent: Wednesday, July 08, 2015 11:42 AM To: Devane, Boyd Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 wi Also, per your previous email, I can update our narrative as necessary to remove the "maximum extent practicable" language. 1111 :71"11111v From: Devane, Boyd rmailto :bovd.devane(d)ncdenr.gov] Sent: Wednesday, July 08, 2015 11:38 AM To: Gareth Avant Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 I'm trying to figure out what "new proposed deve|opment istobe treated by the scour hole? |s the .45 acre of impervious footprint the proposed road on the western side? |s that the "new proposed deve|opment" that is under the "Project Description" I assume that it is the drainage of the new road that does not drain into bioretention #20. If not, where is this impervious located? From: Gareth Avant [nlaiKo:GAvant()nlcknlcreed.conU Sent: Wednesday, 3uh08, 20159:22AM To: Oevane,Boyd Subject: RE: Approval nf modifications toBMP #18-#05-07]2v]0 Per our conversation yesterday, in the western drainage basin, we have a total drainage area of approximately 3.6 acres and an impervious footprint ofO.45acres. From: Oevane, Boyd [nlaiKo:boyd.devane(d)ncdencoovl Sent: Tuesday, 3uh07, 2015 10:12 AM To: Gareth Avant Subject: RE: Approval nf modifications toBMP #18-#05-07]2v]0 From: Gareth Avant [nlaiKo:GAvant()nlcknlcreed.conU Sent: Monday, ]uh06,]0159:5OAM To: Oevane,Boyd Subject: RE: Approval nf modifications toBMP #18-#05-07]2v]0 | just wanted to follow up with you onthis. |fat all possible, vve are needing the approval for Boulder Point Drive this week in order to meet the County's submittal deadline. From: Oevane, Boyd [nlaiKo:boyd.devane(d)ncdencoovl Sent: Friday, ]une26, 2015 11:39 AM To: Gareth Avant Subject: RE: Approval nf modifications toBMP #18-#05-07]2v]0 I'm leaving now. I will try to get it done on the 7t" when I come back. Send me an email that morning to remind me that it's a priority. From: Gareth Avant rmailto :GAvantCa)mckimcreed.com] Sent: Friday, June 26, 2015 11:09 AM To: Devane, Boyd Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 Also, we sent a package to you earlier this week for a new residential area at Briar Chapel, Phase 15 North. I got notification that it was delivered. Please let me know if you haven't received that or if you need any additional information. From: Devane, Boyd rmailto :bovd.devane(d)ncdenr.gov] Sent: Friday, June 26, 2015 8:52 AM To: Gareth Avant Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 I might can get the other one out today but I can't guarantee it. If not, I should be able to get it soon after I return on July 7t ". I didn't see anything wrong on my initial review. From: Gareth Avant rmailto :GAvantCa)mckimcreed.com] Sent: Friday, June 26, 2015 8:42 AM To: Devane, Boyd Cc: Smith, Cherri L; Robinson, Jason Subject: RE: Approval of modifications to BMP #18 - #05 -0732 v30 ' = From: Devane, Boyd rmailto :bovd.devane(d)ncdenr.gov] Sent: Thursday, June 25, 2015 3:04 PM To: Gareth Avant Cc: Smith, Cherri L; Robinson, Jason Subject: Approval of modifications to BMP #18 - #05 -0732 v30 Please accept this note as the 401 and Buffer Permitting Unit's approval of the modifications to the Briar Chapel — SD Commercial Stormwater Plan as was originally approved on February 27, 2015. This approval is for the changes that are described in the " Stormwater Design Plans- REVISED ", the "Supporting Calculations- REVISED" and the "BMP Design Supplement" that were received in our offices on June 10, 2015. If any other changes are proposed from these approved today or those approved in February, the modified plans would need prior written authorization from the Division. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in 4 error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. This e -mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e -mail in error please notify the system manager. Please note that any views or opinions presented in this e -mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e -mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e -mail. 5 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Boulder Point Drive Extension Chatham County, North Carolina July 8, 2015 Prepared for: BRIAR_ V7CHAPEC by Newland COMMUNITIES NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Prepared By: vJ MCKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M &C Project No. 02735-0113 .•Q�pFESS10�' •.9 '. 03 348 - Gi'., OMM2015 =rte PROJECT DESCRIPTION The purpose of the project is to construct stormwater management and roadway infrastructure to support future development within the western area of the Briar Chapel development. Based on the conditions of the approved 401 Water Quality Certification, NCDENR -DWQ will require runoff from the roads and impervious surfaces to be captured and treated for 85% TSS removal before being discharged into existing stream buffers. To meet this requirement, the runoff from the current and future development within the eastern portion of the project will be captured and directed into Bioretention #20. The western portion of the site, due to its relatively small impervious area will bypass all offsite drainage through the project area and direct runoff generated from the new proposed development into a scour hole, where it will be dissipated and directed offsite as diffuse flow. Future development from the extension of Boulder Point Drive will be captured and directed to approved BMPs. Calculations for this new facility are included in this package. SITE DESCRIPTION The project area is approximately 3.59 acres of disturbed area located within Briar Chapel West development area, of which 2.24 acres have already been permitted. This extension will begin at the current intersection of Boulder Point Drive and Briar Chapel Parkway and extend Boulder Point Drive by approximately 1,250 feet. The site generally slopes away from 3 high areas; 1 located at the intersection of Briar Chapel Parkway and current Boulder Point Drive, where the site drains towards the west; 1 located about midway of the alignment, where the site drains in both directions; and another located at the western end of the extension which drains towards the east. Additionally, the western side of the project area has buffered streams that are tributary to Pokeberry Creek (WS -IV; NSW). SOILS According to the Chatham County Generalized Soil Survey, the soils located on the site are classified as Wedowee sandy loam, 2 to 35 percent slopes (WeB, WeC, and WeE). The following soil descriptions are associated with the soils found on the site: We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink /swell potential. The seasonal high water is generally more than 6.0 feet below the surface. BIORETENTION DESIGN The goal of this bioretention area will be to remove 85% of the total suspended solids entering from the surrounding impervious drainage area before discharging into the adjacent stream. To obtain the goal of keeping the footprint as small as possible the temporary ponding depth for the design is 12 ", which is the maximum desired as stated in the BMP Manual. Any runoff exceeding the ponding depth will be discharged, via a riser structure and outlet pipe, directly into the adjacent stream buffer at non - erosive velocities. Engineered bioretention media will not be placed until the northern future development has been stabilized such that no damage to the media can occur. Runoff exceeding ponding depth will still be discharged. Design parameters were taken from the BMP manual and from DWQ's design supplement forms. MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements. Any measure that fails to function as intended shall be repaired immediately. / \ MANN'S CHAPEL RD TO CHAPEL HILL EAT U) Ln NORTI -I _ 0 n � D ITJ g- -��pER L pw DR AIypR �'S ST pR 4 '006 �h6, Rp VICINITY MAP NORTH NOT TO SCALE TO PITTSBORO 50' 0 50' 100' SCALE: 1 " =50' (Horiz.) \ �� \ - I I I 1 1 \ I � / /// % � /// , / ; v VA A \ \VA \\ V 1 1 I I IIII / \ � ��\ , \ +� 1 �I ► V I I \ �, I / V A \ I / l /l /l`;,/ j•i %% A \ 1 III I I II 11 1 1111 1 I v �\ \ A J °/ J� \ 1 \ \ lift / —v v� - - - - -- v� III111111111�!/. 11 111�'ll,11111111111111 IIII111111111111111111 \ \1A,'V A`��11 �i�, -�v // � / ° � °I o of of �• °l / � v vv vv III l l I I III I (IIII III II II 111 I I I �'II \��v/,�i // +/ � _ / \ I I I I III IIII rli� 'll 11 111 11 1► I I I I I \ / / / LJill IIIIIII I /// � /I II III11111111111111 l l ll l I /l /lllllllllllll /% \,\�\ // - - -' / // \ \ ______ -- -- �_ / / / /// Ilk / DRAINAGE AREA \ — ; - -_ - - - - -_ - -- ` 1 / 3.60 ACRES �� \ \\ \ \\ � OE _- ________ -_ -_ -- __ E \, / v vvv vvyvv vvv�v v v v v /// /// \� \\ \ \\ \\ i //% Tom'/ IMPERVIOUS \ \ \\ \ \ ♦ , _ -_ _ / //� / / __ _ _ f \ \ AREA / / / I , I —\ _I \ - \ \ / , / / / / / // / / / // / _ – IIIIII \ / / / /' /' // / ' /'/ – \I I I , III I/l I►/ / �I%(, 0.45 ACRES \ *. \ \ \\ \ \ \ \ I FUTURE 5 \ \ / I / 3.99 ACRES \ \\ \ 1 I DEVELOPMENT \ \I II —!OE – � – ° "` °_ I II o,/ � oI - ��' �j ��� �/' � _– =_ � _ - -/ -- = — /- - � - - / d� / / I I I I I I I _ \ / ► = / / I / // �/ ! / / / h ^ � ,o / / /— / — , � — _ _ — y \ \\ `v v � \ �1 11y I ,1 v \ �v \\ \ \ \ \ \ \ \ \ V 1 \ v \ 1 \ \ \ \ i \ 1 \ v \ ( I / 5 / I i I J / / / I IIIII lI l l► flI I I I J� 'v \ v \ 1 \ \ 1 \ I I \ \ \ \ \v\ \ \ v \ \ \ 1I 1�\ I �\ 534 o o / �I11 II / / Jill IMPERVIOUS AREA o 0 00 o � i ,OE II ° 533- 1.82 ACRES I A ) k 5 1 l 1 / i / ' \' � _��`v V vv w— � �, � l l I / / 1 v �� �,�/ \ V A A BIORETENTION #20 r 1 — — — NSF /TPF� 550 — — — \ —SF — — — / 1 NNZ \ � / _ T Qrl POINT DRIVF P 1 / R/W) \ PROPOSED SCOUR HOLE f 1 _ r / \ m X \ \ \\ \\ S \ \ \ \ \\ fir I // \\ \\ ;\ \\\ \ \\\ \�-_ -- \ \ _ 11 l l / -- \I\ / � \ \ \ \ \ \\ \ \ \\ 1 I I I I IIII \ \ \ \ \� — \ \ \ \\ \ \ \\ \\\ \ \ --- - - ---- - - -- -- I 1 \ \ \ \ \ f \ / \ \ \ \ \ \ I I 1111 \\ _ \\ I �ja, 11 \191 11 ( I I 11 \ v 4 v 11 11 / IIII / \ Il \\ \ \ \ \ \ - \ 1 I IIII \- / \\ \ \\ \ \ 11 \ 1\ 1 I II I III I IIIIII I I I I \\\ \\ \\ \ \ (IIIIIII IIIIII v \ �� \\ \\ I II IIII \\ I I \ \ \ I I I ��- > II I II II IIII I I Ilk/ / \\\ \ \\\\ \\ \ \\ \ \� ` \ \\\ IIII II II 1 I I I \ 1 I I/ I I \ I \ \ 1 1 1 1\ \\ \\ I I I I l / I I IIII / / / it l/ I� / ll ll/ l 11 4 SEAL SEAL+ 4 4 v �� v �CREEIJ 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233 -8091, Fax: (919)233 -8031 2 REVISED PER COMMENTS RECEIVED FROM DWR 2015.07.08 F -1222 1 ISSUED FOR PERMITTING 2015.04.17 REV.NO. DESCRIPTIONS DATE REVISIONS of \ www.mckimcreed.com e ` BRIAR CHAPEL by Newland COMMUNITIES \ l i �i I � \ 1 / I \ � I r \ 4 BRIAR CHAPEL ` 4DATE: APRIL 17, 2015 ` 4 SCALE k 0 M &C FILE NUMBER IVICE MAP BOULDER POINT DRIVE EXTENSION DRAWN OJ. # 02735 –BSS HORIZONTAL: DRAWING NUMBER CHATHAM COUNTY, NORTH CAROLINA DESIGNED BSS 1" = 50' CHECKED GCA VERTICAL: MAP i 1% BMP #20 DRAINAGE AREA MAP PROJ. MGR. CHS N/A i i STATUS: FINAL DRAWINGS FOR REVIEW PURPOSES ONLY Of REVISION 2