HomeMy WebLinkAboutNCC203111_Annual Fee Waived Email_20230808Tran, Kieu M
From:
lase rfiche.ncdenr.gov@mccicloud.io
Sent:
Tuesday, August 8, 2023 1:13 PM
To:
ggamet@csenergy.com
Cc:
Tran, Kieu M; Georgoulias, Bethany; ggamet@csenergy.com
Subject:
[External] Construction SW General Permit Annual Fee Update - NCC203111
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Construction General Permit Permittee:
This email is to notify you that the 2023 annual fee for Certificate of Coverage (COC) no. NCC203111 has been applied or
waived. No future fees will be required, as this permit is no longer active.
This COC is for Jester Solar Electric Power Generation Facility in Wayne County, issued to CS Energy. This
communication is in reference to Invoice no. NCC203111-2023.
If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01.
Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future e-mails from going into Spam filters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.