Loading...
HomeMy WebLinkAbout_External_ FW_ SAW-2023-01130 590 Falcons Way Provisional NWP 29Baker, Caroline D From: Brad Luckey <bluckey@pilotenviro.com> Sent: Monday, August 7, 2023 8:11 AM To: Myers, Joseph M Cc: Capito, Rachel A CIV (USA) Subject: [External] FW: SAW-2023-01130 590 Falcons Way Provisional NWP 29 Attachments: Fee Received for Falcons Way ID # 20230807 Ver 1.msg CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Joseph —please provide update on 401 for above referenced site, DWR 20230807, Version 1 . This is an ATF permit for a private individual that installed a driveway crossing for them to build their house. Let me know of any questions, thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckey@pilotenviro.com From: Capito, Rachel A CIV USARMY CESAW (USA) <Rachel.A.Capito@usace.army.mil> Sent: Tuesday, July 11, 2023 11:37 AM To: Brad Luckey <bluckey@pilotenviro.com> Cc: aliciajparr@gmail.com; pinkapnka@gmail.com Subject: SAW-2023-01130 590 Falcons Way Provisional NWP 29 0 This is a provisional notification that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Thanks, Rachel Rachel Capito Regulatory Project Manager Wilmington District U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 919.440.1823