Loading...
HomeMy WebLinkAbout20131070 Ver 2_More Info Received_20150713 (38)Strickland, Bev From: Devane, Boyd Sent: Monday, July 13, 2015 2:58 PM To: Strickland, Bev Subject: Please file this in Elk Creek # 13 -1070 v2 Attachments: PageSmear.pdf From: Devane, Boyd Sent: Monday, July 13, 2015 1:41 PM To: 'davidf.ramsey' Cc: Angelo Accetturo; Fox, Tim; Davidson, Landon; Price, Zan (George) Subject: RE: Questions about June 23rd submittal - Elk Creek # The smudge was very strange to us. You sent three, stapled copies of the four -page letter and only the first page of each letter was stained and they were all identical stains (see attached copy). They all appeared to be signed electronically. Please sign all future submittals by hand. Thanks. Thanks for correcting me on the email address. I generally return responses via the address from which the information was received. I will try to remember to always use your Verizon address. From: davidf.ramsey rmai Ito: davidf. ra msev(cbverizon. netl Sent: Monday, July 13, 2015 9:19 AM To: Devane, Boyd Cc: Angelo Accetturo; Fox, Tim; Davidson, Landon; Price, Zan (George) Subject: Re: Questions about June 23rd submittal - Elk Creek # Boyd: I just received this email since I was involved in the Grandfather Mountain Highland Games all weekend. I respond later today. Do not know why the letter was smudged but it must have happened in the US Postal System. Please change the email address to davidf.ramsey@verizon.net. The hotmail is a backup and not looked at as often. Hope all is well. David F Ramsey, Professional Engineer 434 Skinner Blvd Dunedin, F134698 or 61 The Glens Blvd Banner Elk, NC 28604 727 4094639 cell phone This E -Mail transmission (and /or the documents accompanying it) may contain information belonging to the sender which is confidential, privileged and /or exempt from disclosure under applicable law. The information is intended only for the use of the individual(s) or entity named above. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this information is strictly prohibited. If you have received this E -Mail transmission in error, please immediately notify us by return E -Mail or telephone to arrange for return of its contents including any documents. From: Devane, Bovd Sent: Thursday, July 9, 2015 3:56 PM To: mailto :davidf.ramsev(a>hotmail.com Cc: Anaelo Accetturo ; Fox, Tim ; Davidson, Landon ; Price, Zan (Georae) Subject: Questions about June 23rd submittal - Elk Creek # We are now reviewing your plan that we received on June 23, 2015 and have some comments and questions. 1. The front page of all three paper copies we received have identical 1.5" smudges on the lower right -hand side. Your response to #1 has a smudge after "orifice" that makes the meaning of your statement unclear. Please provide us with a front page that is not smudged so we can tell what your statement says. To save you time, you can send that page electronically and I will print copies here. 2. Your response to #1 indicates that "The barrel is 4" and the orifice 1/5" ... ". We assume that is a typo on the 1/5" and can only guess that the smudged area covers a "1 ". 3. You stated in the top paragraph of the second page that "The equation in the manual for the volume of runoff to be treated does not agree with the NCAC referenced code." Please indicate which equation in the Manual is inconsistent with the code. The code reference you provided "Section 15ANCAC 02.41.1017(13)" is not a valid code number and we could find nothing similar. We want to correct any inaccuracies and would appreciate you helping us determine where it is located. This information is being sent to you in an email and is not a formal "Request for Additional Information." The intent is to give you an opportunity to correct your submittal and hopefully expedite the review. Please note that we have not completed our review of the total material received on June 23, 2015 and we may find a need to provide a formal "Request for Additional Information." David F Ramsey, P E- P S M R &S Engineering and Construction Corporation 434 Skinner Boulevard 61 The Glens Boulevard Dunedin, F134698 Banner Elk, NC 28604 webpage: www.ramsevenaineerinp-.com 727 409 -4639 e-mail davidframsey(averizon.net 828 963 -5875 Professional Engineer Ohio - Florida -N Carolina -S Carolina- Georgia - Louisiana- Mississippi Professional Surveyor Ohio - Florida -N Carolina General Contractor Class A Florida CGC 010310 North Carolina 44555 Please reply to North Carolina Address June 10, 2015 Ms. Karen Higgins �`OI @ f2 ►1 Mj� 401 and Buffer -Permitting Unit c� 1617 Mail Service Center Raleigh, NC 27699 -1617 JUN Q 3 2015 j RE: Elk Creek of Banner Elk DENR - F P407 s E—TDWR# 12 -1070 R ERMTJiN�! Dear Ms. Higgins: Enclosed herewith you will find the additional information as requested in an email to Angelo Accetturo dated May 19, 2015. regarding the aforementioned project and application. Following you will find the response to your request in the order as presented in your letter with my response in Bold. 1. The size of the wet detention pond orifice was not calculated according to our Manual as we specified and a considerably over -sized orifice was specified. Your plan indicated that a 4" orifice would drain the pond over a 48 hour period. That is not correct. Our quick calculation showed that a 4" orifice would drain the pond in approximately 8 hours. Some of the reasons for the error were that the .0085 SF orifice calculated by your engineer converts to approximately 1.25" diameter orifice, not 4 inches as was stated. Although 1.25" diameter seems to be a reasonably close to our estimated number, had we not caught the error, the stormwater would have never been treated during the life of the project. This is of concern. Furthermore, being one of the most critical calculations relative to the stormwater treatment device, we would have expected it to be checked before submittal. As we said in our December 30, 2014 letter, please have your engineer refer to Section 3.5.2 "Orifice Equation" in calculating the estimated drawdown time. In that letter, we specified that the H value should be divided by three get an accurate assessment of the average head. His drawing needs correction to show the "drill head" at 2' not 3' and the average head less than that. His "Calculations" on Sheet 9 of 9 show incorrect "Orifice Equation" formula. His "Average Head" formula shows a division by 2 although did not use an average head but rather the maximum "driving head" in his actual calculation. e of the orifice is 1.5" as shown on the Sheet 8 and 9. The barrel is 4" and the orifice 115" d will provide the draw down over a three day period. 2. We were surprised that the specific requests in our July 31, 2014 letter, December 30, 2014 letter and at our February 3, 2015 meeting regarding the "Water Quality Notes and Calculations" (sheet 9 of 9) have not been addressed. Again, these are: a. There is no "filter area" in this plan. The reference to a filter area is no longer on the plans.