HomeMy WebLinkAbout20020730 Ver 4_More Info Received_20220817 (16)Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels.
proposed. N/A
330 linear ft timber boardwalk, concrete walkway, 55-space
porous pavement parking lot (0.45 acres), improved
ashphalt parking lot (3 acres), riser control structure,
composite retaining wall (perimeter is 995 ft in length by 24
inches in width), two timber walkways over stormwater
swale (48 ft long by 18 ft wide).
c. Density (give the number of residential units and the units per
acre).
N/A
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land -disturbing
activity begins.
(i) If applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
❑Yes ®No ❑NA
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and/or built -upon surfaces, such as
pavement, building, rooftops, or to be used for vehicular driveways
or parking.
17.4% (33,932 sq ft/194,677 sq ft)
i. Give the percentage of the entire tract to be covered by impervious
and/or built -upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
9.5% (existing impervious 4.67 acres/49 acre tract); 8.3%
(proposed new 4.09 acres/49 acre tract). Net
impervious reduction is 0.58 acres
j. Describe proposed method of sewage disposal.
N/A
I. Describe location and type of proposed discharges to waters of the
state (e.g., surface runoff, sanitary wastewater, industrial/
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
11 acres is total area of disturbance.
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
concrete walkways and curbs, asphalt entrance to the
spillover gravel lot and the main lot will be asphalt driving
lanes and parking stalls. Porous material will be used for
overflow parking lot. Concrete pipes for conveyance of
stormwater along roadside ditch.
h. Projects that require a CAMA Major Development Permit may also
require a Stormwater Certification.
(i) Has a site development plan been submitted to the Division of
Water Quality for review?
[]Yes ❑No ®NA
(ii) If yes, list the date submitted:
k. Have the facilities described in Item (i) received state or local
approval?
[]Yes []No ®NA
If yes, attach appropriate documentation.
m. Does the proposed project include an innovative stormwater
design?
252-808-28082 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06
Form DCM MP-3 (Upland Development, Page 2 of 2)
commercial effluent, "wash down" and residential discharges).
Constructed tidal wetland drains into the Battleship
basin
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
Cape Fear Public Utility Authority
o. When was the lot(s) platted and recorded?
June 7, 1963
July 28,2022
Date
Living with Water
Project Name
Dawn York
Applicant Name
Applicant Signatu e
❑Yes ®No ❑NA
If yes, attach appropriate documentation.
n. (i) Will water be impounded? ❑Yes ®No ❑NA
(ii) If yes, how many acres?
p. If proposed development is a subdivision, will additional utilities be
installed for this upland development?
❑Yes ❑No ®NA
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/26/06