Loading...
HomeMy WebLinkAbout20130918 Ver 6_U2525B_WetlandpermitSummary_sht_3_07072015_20150707WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 8A 33+23 -EY4- <0.01 9 95+7g -L- LT TO 15" RCP 2.01 0.15 0.03 <0.01 462 10 102+77 -L-(RT) 9A 101+7g -L- (LT) TO 42" RCP <0.01 84 102+19 -L- LT 10 113+64 -L- LT TO 2 7' X 8' RCBC <0.01 0.03 212 15 117+08 -L-(RT Bank Stabilization (26' is Coir Fiber Matt.) 132 10A 114+23 -L- RT TO 0.02 0.02 115+15 -L- RT) 106 115+19 -L- LT) TO 0.03 <0.01 <0.01 116+17 -L- RT 10C 116+15 -L- LT) TO 0.25 0.04 117+08 -L- RT 11 123+22 -L- LT) 0.33 127+g4 -L-(RT) 123+22 -L- (LT) TO 11A 13+02 -Y7-(RT) TO �L II BENT PROTECTIOP <0.01 13+g3-Y7- RT 18 SUBTOTALS: 2.65 0.05 0.17 0.06 <0.01 908 25 PERMIT DRAWINGS SHEET 89 OF 93 NOTE: Rounded totals are based upon sum of actual impacts. Revised 11/20/14 SITE 11A CL II BENT PROTECTION Revised 6/22/15 SITE 10 added bank stabilization Revised 3/31I05