Loading...
HomeMy WebLinkAboutExternal_ Nationwide Permit 12 verification - Revised Site 11_ Piedmont Natural Gas_ Line 142 Natural Gas Pipeline_ Wake and Johnston Counties_ SAW-2021-01288From: Bailey, David E CIV USARMY CESAW (USA) To: Morris, Tom E. Cc: DePalma. Alicia Knowles; John Farmer; Thomas, Zachary T; Keith Gualtieri; Camden Brunick; Isenhour. Kimberly T CIV USARMY CESAW (USA) Subject: [External] Nationwide Permit 12 verification - Revised Site 11: Piedmont Natural Gas, Line 142 Natural Gas Pipeline, Wake and Johnston Counties; SAW-2021-01288 Date: Monday, March 13, 2023 8:13:55 AM Attachments: 2021-01288 NWP 12 Tearsheet - Revised.odf 2021NWP12.odf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. up Please see the attached Nationwide Permit 12 verification, including Special Conditions and terms and conditions, revised for Site 11 of the above referenced project. Importantly, this verification includes a Compensatory Mitigation requirement. Note that hard copies of the attached documents will not be distributed unless specifically requested. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2Pusace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://re.gulatory.ops.usace.army.mil/customer-service- s u rve Thank you for taking the time to visit this site and complete the survey. From: John Farmer <John.Farmer@eli-Ilc.com> Sent: Thursday, January 19, 2023 4:20 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Thomas, Zachary T <zachary.thomas@ncdenr.gov> Cc: DePalma, Alicia Knowles <Alicia.DePalma@duke-energy.com>; Morris, Tom E. <Tom.Morris2@duke-energy.com>; Keith Gualtieri <Keith.Gualtieri@eli-Ilc.com> Subject: [Non-DoD Source] PNG- Line 142 Streambank Stabilization Revision; Johnston County, NC January 19, 2023 David E. Bailey, PWS Zach Thomas Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 919.817.2436 DdVIU.t.ra Environmental Program Consultant NCDEQ-Division of Water Resources 1628 Mail Center Raleigh, NC 27699-1628 919.791.4255 zachary.thomasna ncdenr.gov RE: PRE -CONSTRUCTION NOTIFICATION (PCN) PNG- LINE 142 MOD & STREAMBANK STABILIZATION JOHNSTON COUNTY, NORTH CAROLINA Gentlemen: On December 13, 2022, Piedmont Natural Gas (PNG) submitted a Pre -Construction Notification (PCN) for modification to the Line 142 natural gas project. The modification consisted of (1) a change from horizontal directional drill (HDD) to open -cut trenching due to geological constraints on construction between Station 189+00 and Station 209+00 and (2) streambank stabilization along a 50-ft stretch of Beddingfield Creek which parallels and flows north of the natural gas easement east of Shotwell Road. On January 12, 2023, PNG received provisional approval from USACE via email for the modification to the project as described above. Since that time, the streambank stabilization grading has been refined to ensure that no fill is placed in the floodplain associated with Beddingfield Creek. Attached is the revised plan sheet indicating the proposed stabilization through the laying back of the existing streambank on a 1.25:1 slope and then stabilizing with Flexamat. This streambank stabilization does not change the wetland and stream impact tables submitted in the modification on December 13, 2022. If you have any questions, please contact me at your convenience. Sincerely, John L. Farmer, PE, CPESC, TN QHP Energy Land & Infrastructure, LLC (PLLC in NC) 745 South Church Street, Suite 801 Murfreesboro, TN 37130 (615) 383-6300 Office iohn.farmerna eli-Ilc.com