HomeMy WebLinkAboutSAW-2023-00098--NWP 39 Verification and MRTF.pdf U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2023-00098 County:Wake U.S.G.S.Quad:NC-Fuguay-Varina
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Jim Adams
Address: 200 Carpathian Way
Raleigh,North Carolina 27615
Size(acres) --42 acres Nearest Town Fuauay-Varina
Nearest Waterway UT to Basal Creek River Basin Neuse
USGS HUC 03020201 Coordinates Latitude: 35.613841
Longitude:-78.805480
Location description: The project site is south of Dickens Road,north of Old Powell Road,east of Broad Street and west of
James Slaughter Road,located at 200 Dickens Road in Fuguay-Varina,in Wake County,North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material within 0.49 acres
of wetlands.
Applicable Law(s): ❑X Section 404(Clean Water Act,33 USC 1344)
❑Section 10(Rivers and Harbors Act,33 USC 403)
Authorization: NWP 39.Commercial and Institutional Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
Conditions, your application signed and dated 1/10/2023, and the enclosed plans. Any violation of the attached conditions or
deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative
penalty,and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general
permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided
it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon
the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the
date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been
exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(LAMA),prior
to beginning work you must contact the N.C.Division of Coastal Management Morehead City,NC,at(252)808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State
or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program,please contact G
eorge Lyle/ 'P,,hillips III at(919)588-9200 or George.L.Phillips(ausace.army.mil.
Corps Regulatory Official: _1 ,g� l ��/it Date: 07/12/2023
Expiration Date of Verification: 3/14/2026
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so,please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.anny.mil/cm_apex/f?p=l 3 6:4:0
Copy furnished: Zach Thomas/NCDEQ-DWR/3800 Barrett Drive,Raleigh,NC 27609
Camden Brunick/Wildlands Engineering,Inc./ 1430 South Mint Street, Suite 104,Charlotte,NC 28203
SAW-2023-00098
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
Action ID Number: SAW-2023-00098 County: Wake
Permittee: Jim Adams
Project Name: Dickens Road
Date Verification Issued: 07/12/2023
Project Manager: George Lyle Phillips III
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: George Lyle Phillips III
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
George.L.Phillips@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
Compensatory Mitigation Responsibility Transfer Form
Permittee: Jim Adams Action ID: SAW-2023-00098
Project Name: Dickens Road County:Wake
Instructions to Permittee:The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation
Bank or the North Carolina Division of Mitigation Services(NCDMS),who will then sign the form to verify the transfer of the mitigation
responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project
Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise
specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the
impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the
permit,and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are
available at the identified site. By signing below,the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and
provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank
Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin
Stream Impacts(linear feet) Wetland Impacts (acres)
Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal
0.49
*If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal
0.98
Mitigation Site Debited: Falling Creek UMB—Falling Creek/Grantham Branch/McClenny Acres II sites
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site,also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I,the undersigned, verify that I am authorized to approve mitigation transactions for
the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation
identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify
that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the
mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation,the
USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation
requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form,the Permittee is
no longer responsible for providing the mitigation identified in this form,though the Permittee remains responsible for any other
mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the
District is in receipt of a copy of this document signed by the Sponsor,confirming that the Sponsor has accepted responsibility for
providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the
North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance.
NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records
for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager
(address below) is provided with a signed copy of this form.
• If changes are proposed to the type,amount,or location of mitigation after this form has been signed and returned to the District,
the Sponsor must obtain case-by-case approval from the District Project Manager and/or North Carolina Interagency Review Team
(NCIRT). If approved,higher mitigation ratios may be applied,as per current District guidance and a new version of this form must
be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument.
Comments/Additional Conditions:A letter from Wildlands Holdings III,LLC,confirming they are willing and able to accept the
applicant's compensatory mitigation responsibility,dated 4/6/2023 was included with the preconstruction notification.
This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the
Sponsor should provide copies of this form along with an updated bank ledger to:1)the Permittee,2)the District Project Manager
at the address below, 3)the Bank Manager listed in RIBITS,and 4)the Wilmington District Mitigation Office, 3331 Heritage Trade
Drive, Suite 105, Wake Forest, NC 27587(or by email to SAWM/T@usace.armV.mi0. Questions regarding this form or any of the
permit conditions may be directed to the District Mitigation Office.
USACE Project Manager: George Lyle Phillips III
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive,Suite 105
Wake Forest, North Carolina 27587
Email: George.L.Phillips@usace.army.mil
✓ Phd4k((( 07/12/2023
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios,functional assessments,and mitigation
bank location and availability,and credit classifications(including stream temperature and wetland groupings)is available at
http://ribits.usace.army.mi1.
n ...OLD PRO �L NE PER C)
OLD PROPEF
R/W
_ DKAaM RD. _ a
ow ow N Q
IIAAMOV J n94W V
D8 00WX PO�/ �\ I ONE
NUM
O&U 50
PROPOSED SCM � � Do oauv Ps ome7
/
N / '. . . . . . . . . . ONw�ox�
P"!rc"affA nap e s� a0 W
/ •w•y�;'. l,�M>.. . ':.M • •�w �•w: �; • ... lo ....1M TL'AND L07 J2
♦.• :.. y OB O1B207 PO 021,E
/ .• •.s' `:!.•'..•..I• j.. AV 1962 PO BBB
IIAIDEMS RPCWE7PIES LLC
—_ /
AV*065
LB 0125M PC Oq1?71 I �
JOSEW P AELOGRA E
LOT 2B
LIB 017174 PC 00eTB
= ` BULDING 2 d
Aw low PC BBB
\ vsav
R1N nn Or RE Romwr EARL
STEPhgENSLW)RUST
)NOVAS C S,EPAMW
\ NIP
PIS M7772M f
OB 017W4 PC 37184 _BAL 20,7 PO 2W7 q.ti v v /STEPNAO S 799a.YE
Q•b v v v LOT 26
2B
. ..'. .. as fern Pc 2781
. . .'.\ OV Ism PC
eBB avM Lac _ v. .
raa � 1 � I I 1( ��
\I ONIVAL7P'
AA INIOSQL
/ ••�
—..... v PBC0637B767BB
/ v,.•4 .'. LOT 27
p OB M7710 PG 0OT3.T
o v ♦ DA/1862 PCIL
v�V
119
° N/)
y A A(B
DA1N61 N LAEOIE7P
am�eea re rw LOT 16
ptw N/P minm �� aw 102 P0B91B
S>EPrImFft065g5777457n4aEETLCC BUILDING 3
DO 017004 PG 02161
av 2017 PO 2337 � ow —
ox \ ME FENM
s,axe7vuw eea,D smeLET uc
\ \
N11,
PAWW57777465 O
00 1YPCJ — ME mROALD a SIDleiSOV
9w021
51BB-W 1.IN AO CYMHA P 78794415LW
A;
ear 1 auKL OB 4107 PO 2BB
— OW
POWELLFD. - - - - - - - - -
R/W
Jam— cmmtm ra�fill
law�• amnn ran/no
THIS EXHIBIT IS SCHEMATIC IN NATURE AND IS SUBJECT TO VARIATION.
AXIAL METRO 55
WETLAND IMPACT OVERALL SITE MAP
FUQUAY VARINA7 NC
12-12-2022
Colelenest&Stone
BOLTON &MENK,INC.
Retaining Wall
THBE
TH USAGE, �
0.490 AC
p , -
p p p . \ .
p \ ,.
p p
EXISTING - L
.WETLANDS .
a c" • ' LAGGED'WETLAND •EXISTING.
° p p,7 p L . . . . WETLA DS.
°° a , � . . .
d. FIP
p Impact W1:
Permanent - 00
WL 1100: — 0.490 Ac
W UW
ow I N
1 � N
Retaining Wall
f I OR
ENCF
WATER
- - - - - - - - - - - - - - - - - - - - - - - - - - — ENCROA
I
FIEXISTING UNDISTURBED WETLAND WETLAND IMPACT SUMMARY:
TOTAL WETLAND DISTURBED: ±21,324.5 SF
±.490 ACRES
v v IMPACTED WETLAND
v
THIS EXHIBIT IS SCHEMATIC IN NATURE AND IS SUBJECT TO VARIATION. 0 80 160
AXIAL METRO 55 HORZ.
SCALE FEET
WETLAND IMPACT MAP
FUQUAY VARINA
12.12.2022
CoioJenest&Stone
BOLTON &MENIC INC.