Loading...
HomeMy WebLinkAbout20230908 Ver 1_Staff Report Zachary.Thomas_20230627From: Tillery, Julia A CIV USARMY CESAW (USA) To: bzarzeckiCabsandec.com; aalaasCabamail.com Cc: Thomas, Zachary T; Myers, Joseph M Subject: [External] SAW-2023-00616 (103, 105, & 107 Cornwallis Road / Durham NC / Durham County) Date: Monday, July 31, 2023 11:15:16 AM Attachments: NWP-39 PLANS SAW-2023-00616.pdf NWP39.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. ALCON, A preconstruction notification application (PCN) dated 06/22/2023, was submitted for SAW- 2023-00616 for the proposed activities at 103/105/107 Cornwallis Road in Durham, NC. Due to workload, the Corps was unable to provide timely formal written verification for impacts proposed in your preconstruction notification application. General Condition number 32, which lists the notification requirements for nationwide permits, states that "The prospective permittee shall not begin the activity: (1) Until notified in writing ...., or (2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer." Please note that your work is authorized by NWP-39 provided it is accomplished in strict accordance with the permit conditions and your submitted plans (see attached). Any violation of the conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. It is your responsibility to contact the North Carolina Division of Water Resources (NCDWR) Raleigh Regional Office to determine the 401 requirements for this project. Please note that, if an Individual 401 WQC is required from NCDWR, the conditions of the Individual 401 WQC, once issued, are also conditions of the NWP referenced above. You may not conduct the activity authorized by the above referenced NWP without a valid 401 Water Quality Certification. Please let me know if you have any questions regarding this statutory verification, or any of the conditions of the permit. Thank you, Julia Julia Tillery (she/her) Regulatory Specialist, Raleigh Field Office CE-SAW-RG-R U.S. Army Corps of Engineers —Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919.440.1951 Email: iulia.a.tilleryna usace.army.mil From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Monday, June 26, 2023 7:37 AM To: bzarzecki@sandec.com Cc: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil> Subject: SAW-2023-00616 (103, 105, & 107 Cornwallis Road / Durham NC / Durham County) Good Morning, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Julia Tillery for further processing. Thank you, Josephine Schaffer From: lase rfiche.ncdenr.govna mccicloud.io <laserfiche.ncdenr.govna mccicloud.io> Sent: Thursday, June 22, 2023 5:03 PM To: RaleighNCREG <RaleighNCREG(@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG(@usace.army.mil> Subject: [Non-DoD Source] PCN - Durham - Non -DOT A new project has been received on 6/22/2023 5:02 PM for Global SUQ Gas Station & Market. The link below will take you to the project folder. https://edocs.deg.nc..ov/Laserfiche/index.aspx?db=WaterResources#id=2845855:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.