HomeMy WebLinkAboutNC0021181_2020808_Proposal_2023080811I0-NONIC SERVICES
A Carylon Company
SUBMITTED TO:
City of Belmont
WWTP
PO Box 431
298 Parkdale Drive
Belmont, NC 28012
ATTN: Tanya Carter
Email: tsetzer@cityofbelmont.org
Phone: 704-825-3791
RE: Temporary belt press services
530 Woodlawn Street
Belmont, NC 28012
p: (704) 529-0000
is (704) 529-1648
www.bio-nomic.com
DATE: March 23, 2023
PROPOSAL NO: 23184
RECEIVED
NCDEQ/DWR/NPDES
In accordance with your request, we are pleased to furnish the following proposal.
SCOPE OF WORK
Wastewater solids have accumulated to an undesirable concentration in the aeration basin. Per our
sampling from a boat we found that the accumulations were nearly to the top of the basin in many
areas. For the moment it can be assumed that there are about 8 feet of sludge. Several core samples
were obtained with a sludge sampler and composited. The percent solids concentration was
surprisingly 29,000 ppm by weight. We then processed the sample and determined that a dewatered
filter cake of about 20% solids will be attainable for offsite disposal.
Assuming approximate volume at 100 x 330 X 8 feet deep, then there would be about 2.0 MG sludge.
At 2.9% solids this equates to 240 "dry weight" tons. This is a significant amount as this would equal
1,200 dewatered cake tons generated by a belt filter press for disposal. It is possible that it is not
necessary to remove all of the materials to get the aeration basin in proper operating condition.
Assuming about 100 GPM sludge pump rate or 30 dewatered cake tons per day would be generated by
the operation then about 40 days of processing would be required.
Initial removal can be performed by a simple dry prime pumping method. A more complete removal
would require a floating dredge unit.
BIO-NOMIC SERVICES, INC. SHALL FURNISH
Labor, equipment and materials required to complete the work.
i) Minimum Items to include:
Mobile belt filter press system
Truck loading conveyor
Sludge pumping equipment
18,000 gallon EQ Sludge Receiving Tank
A Carylon Company
ADDENDUM B
Hose and pipe to connect the equipment
Polymer and dosing equipment
Filtrate pump to return the effluent from press to neighboring basin
Operator and service truck
Dump truck Service to transport dewatered cake
ii) Additional items to be determined:
Hydraulic dredge
Crane services to install and remove dredge
Cable guidance system
Floating discharge pipe
480 volt generator (Power may be available from aerator disconnect box)
Dredge operator and fuel truck
Landfill costs paid directly by Belmont or negotiated by Bio-Nomic Services. Landfill costs vary.
CITY OF BELMONT SHALL FURNISH
All access, openings and right of way into the work area; Firm level area to stage, operate and maintain
processing equipment; Any local fees or permits; 480 Volt, 3-Phase electric power and qualified
electrician to connect service — generator can be utilized in remote location; Process water source
capable of 100 gpm @ minimum 50 psi — i.e. 2 %: inch hydrant; Filtrate discharge receptacle — i.e.,
return to manhole or basin; Sludge analysis, waste profile, signing of manifests.
PRICING
Preparation, mobilization, set up,
Start-up of belt filter press system $3,200.00
Teardown, pack up, demobilization
Of belt filter press system $ 2,600.00
Unit Cost for dewatering operation with
Dry prime pump sludge pumping equipment $ 2,200.00/Day
Hauling and disposal to be determined prior to project start at cost plus 1S%
Estimate $2,200.00 per day for two subcontractor dump trucks and $80.00 per ton landfill tipping fee.
Total estimate for 1200 cake tons / 30 tons per day = 40 days @ $2,200.00/Day
Total Hauling and disposal for 40 days @ $2,200.00 + 1200 tons disposal @ $80.00/Ton
Other costs to be determined in need:
Hydraulic Dredging equipment mobilization/demobilization cost estimated at $18,000.00 for cranes,
pipe setup, teardown, etc.
A Carylon Company
TERMS
See Attached Bio-Nomic Services, Inc. General Terms and Conditions.
This proposal is valid if accepted within 60 days of the offer date.
SUMMARY
Thank you for receiving our proposal. Please feel free to contact me with any questions or comments.
There may be some adjustments once the final scope is determined.
Sincerely,
'4aeE Z' coma
Joel L. Coert
Division Manager
Bio-Nomic Services, Inc.
704-904-9704 (Cell)
800-782-6798(Office)
ACCEPTED this -�2 w� day of 20 Z3
By
Purchaser
Print 4/tay L . tje-'-'aI ,:t„ -rw,—, C, "-(4"1(;r50
Name and Title
A Carylon Company
GENERAL TERMS AND CONDITIONS
General Conditions: These general conditions are incorporated by reference into the proposal and are part of the
Agreement under which services are to be performed by the Contractor for the Customer. Contractor will follow
Customer's instructions both verbal and written at all times.
Customer Provided Labor. Where the Customer provides labor for the Contractor, the Customer will indemnify the
Contractor for liability, loss or expense for work related injuries to those laborers not provided by the Contractor. The
Customer agrees to waive all rights of subrogation against the Contractor arising out of the work in this Agreement.
Customers Responsibilities: Customer will provide mechanical services. Operation and control of Customer's
equipment is the Customer's responsibility. If Contractor cannot continue its work due to circumstance caused or
allowed by Customer and of which Contractor was not apprised prior to starting the work, an hourly fee will be
charged.
Damage Limitations: Under no circumstances will the Contractor be responsible for indirect, incidental or
consequential damages. The Contractor also is not responsible for the rendering of or failure to render architectural,
engineering or surveying professional services.
Pre-existing Conditions: The Contractor will not be responsible for liability, loss or expense (including damage
caused by the backup of basement sewers) where the primary cause of the claim or damage is pre-existing conditions
including faulty, inadequate or defective design, construction, maintenance or repair of property or contamination of
the subsurface where the condition existed prior to the start of the Contractor's work. The customer is responsible for
loss of service equipment caused by the pre-existing conditions at the job site.
Environmental Conditions: The debris is represented to the Contractor to be non -hazardous, requiring no
manifesting or special permitting. The Customer will be responsible for any additional costs or claims associated with
the treatment, storage, disposal of the removed debris, or breach of the above representation, at any time during or
after the completion of this project.
Indemnification: The Customer and the Contractor will each indemnify the other in proportion to relative fault for
liability, loss and expense incurred by the other party resulting from a negligent act or omission in performance of
work under this Agreement. The Customer also will indemnify Contractor for liability, loss and expense resulting from
Contractor's services if the Contractor is acting at the direction or instruction of the Customer, or where the primary
cause of any damages is due to information provided by the Customer.
Credit Policy: Regular Terms are Net 30 Days. The company may charge interest at the rate of 1-1/2% per month on
all invoices outstanding 60 days past the invoice date. Credit card payments are subject to a 3.5% convenience fee.
Pricing Adjustments: A fuel surcharge will be included on pricing based on Department of Energy EIA Energy
Information Administration weekly rates; Any increases in material costs during the project will be included as an
increased adjustment to the invoice. If this proposal should develop into a long-term project the pricing will be
adjusted yearly based on the municipal cost index published in The American City & County magazine.
Entire Agreement: This proposal together with any written documents which may be incorporated by specific
reference herein constitutes the entire agreement between the parties and supersedes all previous communications
between them, either oral or written. The waiver by Contractor of any term, condition or provision herein stated shall
not be construed to be a waiver of any other term, condition or provision hereof.
A Carylon Company
Fuel Surcharge 2021-2022
Diesel Fuel Prices
Surcharge %
$2.80-$2.90
.08%
$2.90-$3.00
.09%
$3.00-$3.10
10%
$3.10-$3.20
11%
$3.20-$3.30
12%
$3.30-$3.40
13%
$3.40-$3.50
14%
$3.50-$3.60
15 %
$3.60-$3.70
16%
$3.70-$3.80
17%
$3.80-$3.90
18%
$3.90-$4.00
19 %
$4.00-$4.10
20%
$4.10-$4.20
21 %
$4.20-$4.30
22%
$4.40-$4.50
23%
$4.50-$4.60
24%
$4.60-$4.70
25%
$4.70-$4.80
26%
$4.80-$4.90
27%
$4.90-$5.00
28%
These numbers are subject to change due to the ongoing current market volatility.
A Carylon Company 5
A Carylon Company
et$� City of Belmont
�0 1401 E Catawba St
7 PO Box 431
Belmont, INC 28012
Phone:(704)825-5586
SHIP TO
W WTP
298 PARKDALE DRIVE
BELMONT, NC 28012
VENDOR Vendor#:BION0005
BIO-NOMIC SERVICES INC
516 ROUNDTREE RD
CHARLOTTE, NC 28217
Purchase Order
THIS NUMBER MUST APPEAR ON ALL INVOICES,
PACKING LISTS, CORRESPONDENCE, ETC.
NO. P3001643
ORDER DATE: 05/05/23
DELIVERY DATE:
STATE CONTRACT:
F.O.B. TERMS: Destination
VENDOR ACCT NUM:
VENDOR PHONE #:
VENDOR FAX #:
REQUISITION #: R3001129
PAYMENT RECORD
CHECK NO.
DATE PAID
NOTICE: TAX EXEMPT -TAX ID: 56-0856848
QUANTITY
DESCRIPTION
ACCOUNT NO
UNIT PRICE
TOTAL
1. 00
CLEANING OF WEST BASIN SOLIDS
30-8000-100
223, 482.4200
223, 482. 42
THIS IS TO GET OUR WEST BASIN CLEANED
FOR SOLIDS TO HELP WITH OUR TSS SOLIDS
AND FECALS FOR NPDES PERMIT
TOTAL
223,482.42
CLAIMANT'S CERTIFICATION & DECLARATION
OFFICER'S CERTIFICATION
APPROVAL TO PURCHASE
I do solemnly declare and certify under penalties; of the law that the
I, having knowledge of the facts, certify that the materials
DO NOT ACCEPT THIS ORDER UNLESS IT
within bill is correct in all its particulars; that the articles have been
and supplies have been received or the services rendered;
IS SIGNED BELOW
furnished or services rendered as stated therein; that no bonus has been
said certification being based on signed delivery slips or
given or received by any; person or persons within the knowledge of this
other reasonable procedures.
claimant in connection with the above claim; that the amount therein
stated is justly due and owing; and that the amount charged is a
reasonable one.
DEPT. HEAD DATE
VENDOR MUST SIGN CERTIFICATION STATEMENT ON THIS
VOUCHER. MAIL VOUCHER & ITEMIZED BILLS TO:
VENDOR SIGN HERE
City of Belmont
1401 E Catawba St
PO BOX 431
OFFICIAL POSITION DATE
Belmont, NC 28012
TAX ID NO. OR SOCIAL SECURITY NO.
Belmont City Council The City of
Regular Meeting
Belmont '-N >oM
CityWorks Center, 1401 E. Catawba Street, Belmont, NC 'b
North Carolina
To watch live go to www.citvofbelmont.org/livemeetincts
May 1, 2023, 6:00 PM
6:00 PM — Council Work Session
Council Meeting to Begin after Work Session Concludes
Page
A. COMMENCEMENT
(1) Call to Order
(2) Invocation
(3) Pledge of Allegiance
(4) Recognitions and Acknowledgements 5
2023 Municipal Clerks Week Proclamation
(5) Set the Agenda
B. CONSENT AGENDA
(1)
Approval of Special Meeting Minutes: March 28, 2023
7 - 10
Special City Council Meeting Minutes Agenda Memo
2023 03 28 Special City Council Meeting Minutes
(2)
Approval of Closed Session Meeting Minutes: March 28, 2023
11
Closed Session Meeting Minutes Agenda Memo
(3)
Approval of Regular Meeting Minutes: April 3, 2023
13 - 20
Regular Meeting Minutes Agenda Memo
2023 04 03 Regular City Council Minutes
(4)
Approval of Special Council Meeting Minutes: April 5, 2023
21 - 24
Special City Council Meeting Minutes Agenda Memo
2023 04 05 Special City Council Meeting Minutes
(5)
Approval of Special Meeting Minutes: April 14, 2023
25 - 28
Special City Council Meeting Minutes Agenda Memo
2023 04 14 Special City Council Meeting Minutes
(6)
Approval of Closed Session Meeting Minutes: April 14, 2023
29
Closed Session Meeting Minutes Agenda Memo
(7) Approval of Special Meeting Minutes: April 17, 2023 31 - 35
Special City Council Meeting Minutes Agenda Memo
2023 04 17 Special City Council Meeting Minutes
Vision Statement: Belmont will be a vibrant, multi -generational community that incorporates small-town
charm and heritage with an entrepreneurial spirit.
ADDENDUM C
C.
(8) A Resolution Approving The City of Belmont's Local Water Supply Plan
A Resolution Approviniz The City of Belmont's Local Water Supply Plan Agenda
Memo
(9) A Resolution Approving the City of Belmont's Water Shortage Response Plan
A Resolution Approving the City of Belmont's Water Shortage Response Plan
Agenda Memo
(10) Approval and Selection of a Vendor for an Aeration Basin Maintenance Project
at the Belmont Wastewater Treatment Plant
Approval of an Aeration Basin Maintenance Project at Wastewater Treatment
Plant Agenda Memo
(11) Approval of a Revised Ordinance Authorizing the Closing of S. Main Street and
the Sale, Possession, and Consumption of Alcoholic Beverages for the 2023
Friday Night Live Concert Series
Revised FNL Alcoholic Beverage and Road Closure Agenda Memo
AGENDA
(1) Public Comment
Public Comment Agenda Memo
(2) 2021-2022 Audit Presentation
2021-2022 Audit Presentation Agenda Memo
(3) Public Hearing for Consideration of Entering into an Installment Financing
Contract for Construction of the Recreation Center
Public Hearing for Consideration of Entering into an Installment Financing
Contract for Construction of the Recreation Center Agenda Memo
(4) Resolution Authorizing the negotiation of an installment financing contract
and providing for certain other related matters thereto for the Recreation
Center
Resolution Approving an Installment Financing Contract for Construction of
the Recreation Center Agenda Memo
(5) Public Hearing for ZA2020.02A Del Webb/ Carolina Riverside Development
(Signage): A request to add a condition of relief for the approved Del Webb
retirement community known as Carolina Riverside off of Armstrong Ford
Road to allow for flexibility in the standards for neighborhood identification
signage.
ZA2020.02A Agenda Memo
(6) Consider Adoption of an Ordinance Approving ZA2020.02A Del Webb/ Carolina
Riverside Development (Signage): A request to add a condition of relief for the
approved Del Webb retirement community known as Carolina Riverside off of
Armstrong Ford Road to allow for flexibility in the standards for neighborhood
37 - 43
45-55
57-64
.•
71
73
75 - 78
• :.
87-97
Vision Statement: Belmont will be a vibrant, multi -generational community that incorporates small-town
charm and heritage with an entrepreneurial spirit.
identification signage.
ZA2020.02A Ordinance Agenda Memo
D. REPORTS
(1)
Downtown Belmont Development Association Board Report
99 - 100
2023 04 20 Downtown Belmont Development Association Minutes
(2)
Main Street Advisory Board Report
101 - 103
2023 04 20 Main Street Advisory Board Minutes
(3)
Parks and Recreation Citizen's Advisory Board Report
10S - 107
2023 04 19 Parks & Recreation Citizens Advisory Board Minutes
(4)
Environmental Sustainability Board Report
109 - 110
2023 04 11 Environmental Sustainability Board Minutes
(5)
Board of Adjustment Report
111 - 112
2023 04 13 Board of Adjustment Minutes
(6)
Interim Manager's Report
113
Interim Manager's Report Agenda Memo
E. OTHER
BUSINESS
(1) Other Business
Other Business Agenda Memo
F. ADJOURNMENT
115
Vision Statement: Belmont will be a vibrant, multi -generational community that incorporates small-town
charm and heritage with an entrepreneurial spirit.
The City of Belmont The Clty of
Regular City Council Belmont � M
� b
North Carolina�����5
May 01, 2023
DESCRIPTION: Approval and Selection of a Vendor for an Aeration Basin Maintenance Project at the
Belmont Wastewater Treatment Plant
MEETING: 2023_05_01 Regular City Council
DEPARTMENT: Public Works
STAFF CONTACT: Bill Carroll
SUMMARY:FISCAL IMPACT
$305,400.00 in the Water and Sewer Fund. Potentially less depending on an engineers recommendation.
SUMMARY OF •
The Belmont Wastewater Treatment Plant is having a build up of solids in the aeration basin that is causing
significant challenges in the treatment process. This project would use a belt press to de -water solids in the
system and remove them permanently. Staff have attempted to collect multiple quotes on this project, but
only Bio-nomic Services replied. Due to the urgency of this project, Bio-nomic Services should be selected to
perform the work and the work should begin immediately.
EXHIBITS:
Bionomic Proposal
Bio Services Quote Breakdown
STAFF RECOMMENDATION:
Staff recommend approval of this capital project and selection of Bio-nomic Services as the vendor.
YouTube link for Council Meeting where aeration basin project was funded.
https://www.youtube.com/watch?v=3QkgYnHVfSO&t=380s
D
m
z
0
C
K
it
35,000
BELMONT WWTP -AERATION BASIN SOILDS SUPPORT
MLSS.: 30,000 mglL
MLSS REMOVAL VS TIME
blve��RTH CAN
25,000
BECOMEPRESS WILL
HYDRAULICALLY
20,000 REMOVAL @ 40 DAYS
• •ASSUMPTION)
J
• 111
M
E
N
15,000
---------------------------------------------
10,000
5,000
TARGET MLSS: 3,000 mg/L
p -
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00
Time, days
MLSS, AT only MLSS, max solids to press MLSS Target
• • j
6112/23
REPUBLIC'
SERVICES
NON -HAZARDOUS WASTE MANIFEST C' 1) 7
1. Generator's US EPA ID Number
E] Generator's State ID Number
Manifest Document Ourriberl/-
2. Page 1 of
3. Generator's Name and Mailing Address
5. Generating Location (if different)
Tf
4. PhWdl;?,
6, Phone
7. Transporter #1 Company Name
B. US EPA 10 Number
9. Transporter #I's Phone
10. Transporter #2 Company Name
11. US EPA ID Number
12. Transporter #2s Phone
13. Designated T/SID Facility Name and Site Address
14. US EPA ID Number
15. Facility's Phone
16. Waste Shipping Name and Description
17. Republic Services Approval# and Exp. Date
18.Containers
19. Total 20.
Unit
Quantity
WuVol
No.
Type
a.
0
LLJ
b.
Z
C.
21. Additional Descriptions for Materials Listed Above
22. Special Handling Instructions and Additional Information
23. GENERATOR'S CERTIFICATION: I hereby certify that the above named material Is not a hazardous waste as defined by 40 CFR 261 or any applicable state law, has
been properly described, classified and packaged, and is In proper condition for transportation according to applicable regulations; AND, If this waste is a treatment residue
of a previously restricted hazardous waste subject to the Land Disposal Restrictions. I certify and warrant that the waste has been treated in accordance with the requirements
of 40 CFR 258 and Is no longer a hazardous waste as defined by 40 CFR 261.
Printed/Typed Name
Signature
Monet Day Year
W
24. Transporter fl: Acknowledgement of Receipt of Materials
Printed/Typed Signature 08Y Yearh Monet
U)
25. Transporter #2: Acknowledgement of Receipt of Materials
Z
PrintediTyped Name
Signature
Mon,"
Day
Year
26. Discrepancy Indication Space
Q
27. Facility Owner or Operator: Certification of receipt of waste materials covered by this manifest (except as noted in Item 19)
U.
Printed/Typed NameDay.
eyYear.. P
1Month
.
C
V
iwm OMOM3
W WIN
)PORTER #1 - 1:U-��.��
tvrluvw2
ADDENDUM D
strE` BFI/CMS LANDFILL 704-782-2004
5105 MOREHEAD RD CONCORD, NC 28025
BIONOMIC SERVICES IN NO FEES DAr
530 Woodlawn St
Belmont, NC 28012 vEH
Contract:5010237459 gEFl
Generator:Belmont Waste Water Treatment Plant giu
SCALE IN GROSS WEIGHT 42,880 NET TONS
TARE OUT TARE WEIGHT 6.44
30,000 NET WEIGHT 12,880
1987275
TER TERI T.
t%/4/23 3:52 pm
Mu41
2266697
/23 3:52
INBOUND
INVOICE
0.00 YD Tracking QTY
6.44 to SW-BIOSOLIDS Origin:GASTON 100%
$90.00 $579.60 0.00 $579.60
WHILE W THE LANDFILL. IF YOU DO NOT HAVE THESE ITEMS YOU MAY BORROW °
A SET FROM THE SCALE HOUSE, THANK YOU.
The
TENDERED
underSigned individual this document on
on the reverse aide and that shenor she has the authority to qn this docuof rme 1 1onn bshhadge that
tt�oh or she
er has read and understands the terms and conditions
RS-F042UPR2 (12-20) CHECK#
SIGNATURE
r
DocuSign Envelope ID: 73668A38-8CO4-4660-BOE6-C69053670BEC
2.0 SCOPE OF SERVICES:
Basic Services to be provided by the ENGINEER under this Agreement shall be limited
to the following:
Task 100 Project Management
Project management activities shall include the following:
a. Communicate with OWNER staff on project status and key issues
b. Generate invoices and associated progress reports
c. Monitor project budget, administer this contract, and monitor schedule
Task 200 Evaluation and Recommendations
Evaluation and recommendation activities shalt include the following:
a. Review Notice of Deficiency (NOD).
b. Review existing process data and determine need for additional sampling.
c. Attend one virtual meeting with NCDEQ to discuss strategy to correct
deficiencies.
d. Attend two virtual meetings with OWNER; one to obtain background on existing
issues and OWNER goals, and one to report out on the recommendations in the
draft technical memo.
e. Develop a basic Biowin model of the treatment plant to determine how much
solids need to be removed and to inform the wasting strategy to prevent future
solids accumulation.
f. Document the results of the evaluation, recommendations, and changes to
standard operation procedure (SOP) in a draft technical memo for OWNER
review and comment.
g. Respond to OWNER comments and produce a final version of the technical
memo that can be shared with NCDEQ, as needed.
h. Review proposals from Yd party solids handling removal firms.
i. Assist during the solids removal phase by answering questions if issues arise.
Assumptions:
a. Additional sampling, if needed, to be provided by OWNER.
b. A total of twelve (12) hours between three (3) resources have been allocated for
the virtual meetings listed above.
c. The Biowin model is not a "fully calibrated" model. A fully calibrated model
would require a higher level of effort, waster characterization / sampling, and
schedule. Should OWNER want a fully calibrated model, the ENGINEER can
provide a budget for that service.
d. A total of twelve (12) hours between three (3) resources have been allocated for
supporting the solids removal phase.
Subconsultants:
No subconsultants are included or anticipated to be needed for this Task Order.
Task Order 3
2
ADDENDUM A
DocuSign Envelope ID: 73668A38-8CO4-4660-BOE6-C69053670BEC
TASK ORDER
This Task Order pertains to an Agreement by and between City of Belmont,
("OWNER"), and HDR Engineering, Inc. of the Carolinas ("ENGINEER"), dated March
22, 2023, ("the Agreement"). ENGINEER shall perform services on the project
described below as provided herein and in the Agreement. This Task Order shall not be
binding until it has been properly signed by both parties. Upon execution, this Task
Order shall supplement the Agreement as it pertains to the project described below.
TASK ORDER: Task Order #03
PROJECT NAME: Solids Management Evaluation and Support
1.0 PROJECT DESCRIPTION:
The OWNER has one wastewater treatment plant (WWTP), which is located along the
west bank of the Catawba River and directly south of Wilkinson Blvd. The WWTP will
be decommissioned in 2027 (current projection) after a series of projects are completed
by Charlotte Water to accept the OWNER's wastewater into the Charlotte Water system.
In March of 2023, the OWNER was issued a Notice of Deficiency (NOD) by North
Carolina Department of Environmental Quality (NCDEQ) because of the solids
accumulation in the aeration basin (AB), final clarifiers (FC) and chlorine contact tanks
(CCT) at the WWTP.
The WWTP is equipped with two aeration basins; however, one of them has been out of
service for many years and can not be put back into service without significant
rehabilitation. The 30-minute settleability tests have been consistently high (980 ml/L)
and staff has been challenged to run more than 2 of the 8 aerators at a time. Foam in the
aeration basin appear darker brown due to the higher solids inventory and longer solids
retention time (SRT).
The WWTP also has two final clarifiers. The sludge blanket levels in both were
approximately 9.5 feet when NCDEQ made an inspection during March. At these levels
there is a strong potential for the solids to be washed out during high flow events.
Similarly, during the same visit by NCDEQ, the solids in the chlorine contact tank was
found to be high at 5.5 feet, posing the same risk of wash out as the final clarifiers.
This project is for services associated with an evaluation of the amount of solids build up
in the aeration basin, final clarifiers, and chlorine contact (CCT), how to best remove
them, and to provide an operational plan to prevent future build up.
Task Order 3
DocuSign Envelope ID: 73668A38-8CO4-4660-BOE6-C69053670BEC
3.0 OWNER'S RESPONSIBEUTIES:
OWNER shall furnish as required by the work the following items:
a. All relevant data including maps, drawings, reports, records, audits, annual
reports, and other data that are available in the files of the OWNER and which
may be useful in the services involved under this agreement.
b. Access to public and private property when required in performance of the
ENGINEER's services.
4.0 PERIODS OF SERVICE:
ENGINEER shall begin work immediately upon execution of this Task Order and shall
submit the draft technical memo within 60 days of notice to proceed. This schedule may
be reduced if special sampling is not required.
5.0 ENGINEER'S FEE:
The ENGINEER shall be compensated $17,100 on an hourly, not to exceed basis.
Payment for fees will be paid monthly. Refer to Exhibit 1 for hourly breakdown.
6.0 TERMS AND CONDITIONS:
Unless otherwise specified herein, the terms and conditions shall be per the Agreement.
This Task Order is executed this 'as day of AC.` ` 2023.
HDR ENGINEERING, INC. OF THE
Cj � 4 op um'or�A CAROLNAS.
"O R" "ENGINEER"
BY: BY:
NAME: i
�f� NAME: Robert J. Rella
TITLE:
ADDRESS
Task Order 3
1 W
1l���
s:4 1iS
TITLE: Senior Vice President
ADDRESS: 440 S. Church St., Suite 1200
Charlotte NC 982Q?
City of Belmont
Belmont WWTY - Solids Management Evaluation and Support
MI-1.1,1=11ml�wmlm
IN
N
JIM
®
0
0
�C
co
n
m
m
0
v
m
z
DocuSign Envelope ID: 73668A38-8C04-4660-BOE6-C69053670BEC
m
4 1 b
City of Belmont On -Call - 2023 Hourly Rate/Compensation Schedule
Job Classification
$240-$300
Project Principal
Senior Project Manager
$220-$270
Project Manager
$170-$235
Senior Design Manager
$190-$260
Design Manager
$150-$200
Senior Engineer
$190-$250
Project Engineer 2
$170-$190
Project Engineer 1
$140-$170
Staff Engineer 2
$120-$140
Staff Engineer 1
$100-$130
Process/Technical Specialist
$170-$290
Senior Architect
$170-$250
Architect
$140-$180
Senior BIM Designer
$140-$190
BIM Designer
$110-$150
CADD Drafter
$100-$120
Senior Construction Manager
$175-$230
Construction Manager
$150-$180
Resident Project Representative
$120-$180
Senior Consultant
$250-$300
Senior Utility Management Consultant
$200-$270
Utility Management Consultant
$160-$200
Junior Utility Management Consultant
$115-$155
Project Controls
$100-$180
Admin/Clerical
$90-$110
Accountant
$90-$130
(*Note: Billing rates may be adjusted annually (typically the first of each calendar
ear) to reflect annual merit increases